Town of Dunn Sanitary District No. 3

Slides:



Advertisements
Similar presentations
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Advertisements

Sanitary Sewer System Rate Study September 2012 Keystone Municipal Services.
INFORMATION on RATE increase On May 6, 2008, the Clark County Water Reclamation District Board of Trustees approved a rate increase at a public hearing.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
Presented by NEORSD Richard J. Switalski, P.E. Presented by NEORSD Richard J. Switalski, P.E.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
City of Los Angeles Venice Dual Force Main Project
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
Water is Life: Upgrading Our Infrastructure to Serve You Better.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
The City of North Bend Sanitary Sewer System
Utility Extension Project
1 Town of Tillsonburg Lifecycle/Capital/Debt Strategy.
Fairview Township, York County May 28, 2015
Spreadsheet Session Purpose: To illustrate the process involved in recording municipal tangible capital assets Outline: Setting up municipal equipment.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Special Order by Consent Wastewater Collection Improvement Projects Mark Fisher and Dennis Asbury Final Report to City of Eden October 20, 2009.
Wastewater Management
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
York Sewer District Internships and Succession Planning.
Separating Inflow Reduction From Infiltration Removal Using Simple Tools Frederick Bloetscher, PhD, PE Florida Atlantic University.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
Paper # LOS ANGELES COUNTY PRIORITIZATION OF SEWER REHABILITATION PROJECTS Fernando Villaluna, P.E. 1.
WVSD SANITARY SEWER REHABILITATION PROGRAM 2006 Sewer Smart Summit Presented by Peter V. Sevcik, P.E. West Valley Sanitation District Campbell, California.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
1 Public Hearing User Rate Adjustments April 8, 2008.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
Public Information Meeting Wastewater Treatment January 26, 2016.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main Rachel Rausch, EIT.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Hernando County’s Utilities Infrastructure Opportunity through the American Recovery and Reinvestment Act of 2009 (the Federal Stimulus Package)
City of McCall Sanitary Sewer I&I Study Community Stewardship for Economic Benefits Nathan Stewart, PE, City Engineer Matt Neukom, PE, Project Manager.
24 – Wastewater Conveyance Demand Analysis April, 18, 2013 Professor Doran CEE 410.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Kevin Burnett Presented by CITY OF TULARE, CALIFORNIA.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Spring 2009 Town Meeting Article 41 East Framingham Sewer Improvement Project (EFSIP) May 2009 Town of Framingham Department of Public Works "Preserving.
SOLID WASTE MANAGEMENT CAPITAL PROJECTS ASSESSMENT Board of County Commissioners FEBRUARY 24, 2009.
Sanitary Sewer Fee Study January 28, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed.
What are they and how are they calculated? May 2015.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
City of Sausalito Sewer CIP Vivian Housen, P.E. V. W. Housen & Associates March 25, 2015.
1 CTC 450 Review WW Sludge Processes. 2 Objectives Understand the basics with respect to operation of wastewater systems.
PARK STREET/CAMPANELLI PARK SEWER EXPANSION PROJECT Public Meeting Wednesday, June 22, 2016.
Approval of FY-2016 Capital Budget and the 10-Year Capital Plan February 11, 2015.
1. 1. What is a low pressure sewer system? These Systems convey wastewater from your home or business to the regional wastewater treatment facility. Unlike.
CSA 7 – Boulder Creek. YOUR SANITATION FACILITY Facility Includes the Following Five Pump Stations –Total of 10 pumps 16,553 feet of collection lines.
Asset Degradation Modelling at Townsville Water
Ranney Collector Rehabilitation Program
CTC 450 Review WW Sludge Processes.
Heritage Park Area Construction Update July 28, 2015
Lecture (11): Water Distribution Systems
Feasibility of Bass Lake Wastewater Treatment
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
FY 2017/18 General Budget Workshop
Water & Wastewater Capacity Charge Work Shop
Separating Inflow Reduction and Infiltration Removal
Joshua Basin Water District Draft Findings & Rate Scenarios
Water Department has Six Divisions
Non-Residential Customer Non- Residential - Capacity Evaluation Borough of Conshohocken Authority Customer Informational Meeting June 20, East.
Parkland/Brookdale Interceptor Replacement
City of Fernley City Council Meeting
City of Valdosta Utilities Department.
FEE INCREASES Public Work Shop June 2, 2018.
SEWER DEPARTMENT BUDGET WORKSHOP
Presentation transcript:

Town of Dunn Sanitary District No. 3 Informational Meeting on Capital Improvement Plan June 2, 2016

Capital Improvement Plan Manhole Inspection Review Sewer Video Recordings Lift Station Inspections Review Maintenance Records from Madison Metropolitan Sewerage District Identified Defects and Needed Restoration Established Three Phases for the Restoration Work and Estimated Costs

Gravity Sewer Mains and Manholes Pipe Diameter (inches) Quantity (linear feet) 8 35,133 10 1,983 12 4,556 15 1,032 18 593 Total 43,297 180 Four Foot Diameter Manholes

Lift Stations No. 1 No. 2 No. 3 Design Capacity (GPM/TDH) 600 / 41 feet 500 / 63 feet 300 / 35 feet Pump Motor (HP) 15 20 7.5 Percentage of District Served 95% 78% 11%

Existing Flow Lift Station 1 Lift Station 2 Lift Station 3 Daily Average Flow (gpd) 63,000 50,700 10,300 Peak Daily Flow (gpd) 216,000 193,200 39,600 Peak Hourly Flow (gpm) 240 180 110 Peaking Factor (Peak Day/Average Day) 3.4 3.8

Current Peak Hourly Flow Percentage of Capacity Utilized Lift Station 1 600 gpm 240 gpm 40% Lift Station 2 500 gpm 180 gpm 36% Lift Station 3 300 gpm 120 gpm 18” Gravity Sewer 1,540 gpm 612 gpm 39% 15” Gravity Sewer 1,120 gpm 55% 12” Gravity Sewer 730 gpm 33% 10” Gravity Sewer 623 gpm @ 0.4% 80% 8” Gravity Sewer 543 gpm @ 1.0% 22%

New System Map

Capital Improvement Plan Phase One – Critical Infrastructure and Urgent Repairs Phase Two – Lift Stations Phase Three – Repairs to Remaining Collection System

Phase One Slip Line Critical Sections Excavate and Relay Significant Sags Grout MH Walls Replace MH Lids with Open or No Pick Holes Estimated Cost with Construction in 2018 - $1,365,000

Phase One Map One

Phase One Map Two

Phase One Map Three

Phase One Map Four

Phase Two Paint Lift Stations Replace Screening Box in Lift Station No. 3 Replace Control Panels Estimated Cost with Construction in 2019 - $138,000

Phase Three Slip Line Remaining Sewer Sections Replace MH Lids with Open Pick Holes Estimated Cost with Construction in 2021 - $354,000

CIP Financing Financing of these improvements could be accomplished by using funds in the District’s replacement account, loan(s) from the WDNR, and special assessments from the District. The District is currently plans to finance Phases Two and Three from the replacement account.

Phase One Financing Options Option 1 - $400,000 from District Replacement Account and $965,000 Loan A 10-year loan of $965,000 at 2.275% (current WDNR loan rate) would result in an annual principal and interest payment of $108,000. This would require an approximate $221 increase in annual sewer service charge to a residential customer or a 42% increase in current sewer service charges for 10 years. Option 2 - $400,000 from District Replacement Account and $965,000 in Special Assessments Would require a special assessment of approximately $1,977 for a typical residential user. This would be a one-time 373% increase in sewer service charges.

Questions? Tim Astfalk, PE Project Manager 608-443-0482 tim.astfalk@meadhunt.com