Doing Order of Magnitude Cost Estimates (C) 2002 Dr. Bradley C Paul.

Slides:



Advertisements
Similar presentations
WillHelpYouOut.com Hits 1000 Let’s get Started.
Advertisements

By: Corey Simpson. Henry G. Ford The Model T Ford was built by a man named Henry G. Ford. He was the founder of Ford Motor company, when he started his.
Slide 1 of 10 Taming the Internet. Slide 2 of 10 Overview Specific products include Directories, Intellectual Capital Collections, and annotated reports.
Trick-or-Vote 2006 Canvass Training. WALKING & KNOCKING for DEMOCRACY! We will be knocking on doors to get out the vote. Its the best way, on the best.
The CPI and the Cost of Living CHAPTER 7 When you have completed your study of this chapter, you will be able to C H A P T E R C H E C K L I S T Explain.
Chapter 9 Growth.
Your boss asks… How many of these things do we have to sell before we start making money? Use your arrow keys to navigate the slides.
Section 5.3: Inflation and the Consumer Price Index.
These allow us to reduce complicated statistical changes down to one single number. Example: CPI Takes prices for a large bundle of goods and calculates.
What is Inflation? Inflation is rising general level of prices
AP Macroeconomics Inflation (adapted from South-Western Publishing 2004)
Inflation Unit Chapter 2 26
United Nations Statistics Division/DESA
2 Our Global Economy 2-1 Economics and Decision Making
Murray River Project Update Coal Forum October 2013.
CONFIDENTIAL 0 April 11, 2005 Management Presentation Leadership in Metal Processing and Distribution Lourenço Gonçalves Chairman, President and CEO October.
Outlines and Text Structure ©Feb 2003 Dr. Bradley C Paul.
Western Iowa Tech Community College Used with permission from Penn State Ag & Engineering This material was produced under a grant (SH F-19)
Alternative Minimum Tax ©2004 Dr. B. C. Paul. What is it?  Some tax breaks given to encourage business activity can be used so heavily as to shelter.
Factored Cost Estimates (With Inflation Indexing) ©2002 Dr. Bradley C Paul.
7 The CPI and the Cost of Living CHAPTER. 7 The CPI and the Cost of Living CHAPTER.
CTC 475 Review  BTCF to ATCF. CTC 475 Estimating and Inflation.
Engineering Economics in Canada Chapter 9 Inflation.
1 CHAPTER SIX INFLATION. 2 INFLATION IN THE U.S. INFLATION –DEFINITION: the percentage change in a specific cost-of-living index at various points in.
Economics 9 weeks to go.
Welcome To The 1 st Choice Electrical Estimating System #1 in Estimating software Click To Start Click F5 to open the program then Start to run.
U.S. Railroad Industry Federal Railroad Administration U.S. Railroad Industry Federal Railroad Administration.
Pre-Feasibility Study Cost Estimation Resources ©2002 Dr. Bradley C. Paul.
Itemized Cost Estimates ©2002 Dr. Bradley C. Paul.
Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.
Step 5 Truck Fleet Costs ©Dr. B. C. Paul 2000 Revised 2008 Note – This presentation includes screen shots from the Caterpillar Performance Handbook, Catapillar’s.
Capital Budgeting and Financial Planning Course Instructor: M.Jibran Sheikh Contact info:
The Measurement and Calculation of Inflation Module 15.
V. Finkelshteyn Economics Personal Finance #3
Calculating Stripping Ratios for Area Strip Mines Mnge 315
Post Break Week 2. Comments for Consideration of Coal Miners One issue you have created is extreme variability in your coal tonnage – This will impact.
When you have completed your study of this chapter, you will be able to C H A P T E R C H E C K L I S T Explain what the Consumer Price Index (CPI) is.
L11: Measure of Inflation ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
NRG 173: Carbon Footprints for Climate Action in Complex Organizations Spring Term 2011 Class 11 of 20 May 5, 2011 Kelly Hoell Good Company Eugene, OR.
JK Higginson: Engineering Economics 1 INFLATION Prices of all goods and services change over time An increase in average prices over time is called inflation.
Week 3 Sr. Design. Important Things we Know You will be doing heavy haulage by Barge on the Yukon River for $5 per tonne to Nennana – There will be no.
Natural Resource Partners L.P. A Successful Growth Story UBS Investor Meetings Las Vegas, Nevada September 18, 2007.
Obtaining Information From the Geologic Block Model
Surface Mining Ore Body Geometry ©2011 Dr. B. C. Paul Note- Concepts given here are considered to be common knowledge to those involved in early stage.
MINING. What to Mine Metallic Minerals ▫Metals  Iron, gold, silver, nickel, zinc Fossil Fuels ▫Energy resources  Coal, natural gas, oil Industrial Minerals.
Feasibility Study Cost Estimates ©2002 Dr. Bradley C Paul.
INVESTMENT BANKING LESSON 6 FINDING THE DATA: DOCUMENTS AND REPORTS Investment Banking (2 nd edition) Beijing Language and Culture University Press, 2013.
Making Decisions uCode: October Review What are the differences between: o BlueJ o Java Computer objects represent some thing or idea in the real.
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
Copyright © President & Fellows of Harvard College Using Baker Resources for your Business Plan Ken Kerr February 25, 2009.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
Outcome:- SWBAT Explain the purchasing power of money Identify and explain the different measures of inflation KECSSMS. MURREN ECONOMICS1/4/12.
Planning Surface Mines Mnge 315 ©Dr. B. C. Paul 2003.
Eco 13/2 Correcting Statistics for Inflation. Inflation  GDP can be unreliable because it doesn’t take into account unpaid work or depreciation.  Inflation.
Chapter 13, Section 2 Price Indexes. Constructing a Price Index Used to measure changes in P. over time Created by selecting a base year and a representative.
Copyright 2010, The World Bank Group. All Rights Reserved. Producer prices, part 1 Introduction Business Statistics and Registers 1.
When you have completed your study of this chapter, you will be able to C H A P T E R C H E C K L I S T Explain what the Consumer Price Index (CPI) is.
THE CPI AND THE COST OF LIVING Cost of living index A measure of changes in the amount of money that people would need to spend to achieve a given standard.
Remarks to the World Congress May 12, 2008 Role of Official Statistics in a Modern Society: A U.S. Perspective Keith Hall Commissioner Bureau of Labor.
Week 10 ©2012 Dr B C Paul. Copper Your initial road moves have been questioned. –You have drawings showing the end of each stage –Between two of your.
Entering Our Choices into FPC ©2009 Dr B C Paul Note – This slide series contains screen shots of the computer program FPC developed by Caterpillar Equipment.
The CPI and the Cost of Living CHAPTER 6 C H A P T E R C H E C K L I S T When you have completed your study of this chapter, you will be able to 1 Explain.
The 2007 Class Project ©2007 Dr. B. C. Paul. The 2007 Project A copper/moly porphyry deposit located near Eureka Utah –Ie (hard rock deposit) Deposit.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
Development of Mining Information System (MIS) in Egypt Dr. Sameh Saad El din Ahmed Mining and Metallurgical Engineering Department
Inflation & the Economy
Three Factors Affect Annual Increase
Three Factors Affect Annual Increase
Correcting Statistics for Inflation
CTC 475 Review Replacement Analysis Insider View
Presentation transcript:

Doing Order of Magnitude Cost Estimates (C) 2002 Dr. Bradley C Paul

Order of Magnitude n Get right number of zeros to +/- 50% n Part of Taking A Global Picture of the Project – Example n How much ore do you have and at what grade? n Are you going to go after it by surface or underground – What will your underground method cost per ton? – What will your overburden removal cost be? – Whats your surface mining cost? n How does that last choice change your cut-off grade and ore body tonnage?

Order of Magnitude Sizing n What kinds of fixed costs does the mine have – Fixed costs may be diluted by size, but only if there is enough ore and market to justify bigger capital – May be capital access or environmental visibility issues n By now you have an idea of what you are going to build and how big it is Mine Size Cut-Off Grade Contours of PVR May Only Be Limited Area of Feasible Design What Would You Feel Like if You Discovered You were Wrong Sized at the End?

Great - So Where Do You Get All These Fantastic Numbers n Actually good order of magnitude estimates are one of the trickiest to come up with n Need to have finger on the pulse of your business or industry – Trade Journals n commonly report when someone builds a mine, what the project size is, what the company put into the project, what they have for ore reserves n Mining Engineering front section n Mining News

A Trade Journal Game n Build a data base – Stan Michelson (former SME president) started doing this as an undergrad in the 1930s n Was a red hot consultant with his years of data – Today we have data base programs that allow you to easily add fields and compile information

The Buddy System n Your contacts in the industry (friends from school) n People talk to at SME n Most people will not tell you down to +/- 50 cents what it costs to mine a ton of coal – Trick - knowing its between $10.50 and $12.50 per ton is very much good enough to do an order of magnitude estimate – Can get information for order of magnitude without undermining competitive position

Library Information n Mining Handbooks may give cost per ton by method and estimate of administrative cost relative to production n Canadian Institute of Mining puts out an annual costs volume – Use is mostly metal mining

Cost Manuals n Build canned models of perspective mining operations – allows you to compare your idea to a cost model that someone else did more detailed work on – Obviously an alternative/supplement to fragmented databases assembled from trade journals

Cost Manuals Players n Canadian Mining Journal Annual Cost Volume – Gathered from industrial data but is intended to be comprehensive in giving initial capital costs, infrastructure, milling, and mining by method costs n Serpa – A private cost program with a lot of defaults, gives comprehensive mine costs with just a few sizing proposal parameters n Western Mine Cost Service – designed some model theoretical operations that can be pieced together n are some reasons to question whether fully comprehensive in coverage

The Inflation Bugaboo n Problem is the information is gathered over time – Even mild inflation or shifts in productivity can render 10 year old information questionable n Trick is inflation indexing – Inflation usually measured with 3 main indices n Consumer Price Index (CPI) n Producer Price Index (PPI) n GNP Implicit Price Deflator

Most Information Compiled by Departments of Labor and Commerce n Example of Order of Magnitude Update – I wish to sink a 20 ft diameter shaft 750 ft deep – I know Frontline Camper sunk a 20 ft diameter shaft to 800 ft in 1981 for $2 million n Ill use PPI because based on industrial goods – index value set at 100 in 1982 – Go to BLS n 1981 PPI is 98 n 2002 PPI is 133.2

Updating the Cost of getting the Shaft n Adjusted depth – $2,000,000* 750/800 =$1,875,000 n Adjusted for inflation – $1,875,000*133.2/98 = $2,548,000 n Report the cost as $2.6 million

Comments on Order of Magnitude Cost n I assumed cost as a linear function of depth – there is a fixed cost of setting up frames – cost through unconsolidated likely to be higher n I used the over-all PPI when in fact a specific basket of goods is needed for shaft sinking – To get specific Id have to have a break-down on what was needed and how much of the total cost it was n most time dont have info n most time for order magnitude you are loosing yourself in detail when fast results are needed

More Comments n What was included? - Be careful – Is this a shaft with ore loading equipment and a hoist? – Since from shaft sinking company may not have the hoist (in this case it doesn't) – What about the ore pocket excavation and doors? n Might or might not FC does do ore pockets n May need to find out more n In this case it was just the shaft