Management. Management What is a risk? A risk is simply a probability that some adverse circumstance will actually occur.

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

Objectives To introduce software project management and to describe its distinctive characteristics To discuss project planning and the planning process.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Software Engineering COMP 201
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Lecturer: Sebastian Coope Ashton Building, Room G.18 COMP 201 web-page: Project.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 1 Slide 1 Project management.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 COMP201 Project Management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Chapter 4 Project Management “…a huge topic.” See Part 6, “Management”, Chaps.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
7M701 1 Software Engineering Project Management Sommerville, Ian (2001) Software Engineering, 6 th edition Ch. 4
Creator: ACSession No: 10 Slide No: 1Reviewer: SS CSE300Advanced Software EngineeringDecember 2005 Project Management CSE300 Advanced Software Engineering.
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects l.
Project Management Hoang Huu Hanh, Hue University hanh-at-hueuni.edu.vn.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
8 Managing Risk Teaching Strategies
Risk Management. If you don't actively attack the risks, they will actively attack you. -Tom Gilb Risk is the possibility of suffering loss, injury, disadvantage,
Risk Management in Software Projects
贾银山 Software Engineering, Chapter 5 Slide 1 Project management.
©Ian Sommerville 2000Software Engineering. Chapter 5 Slide 1 Chapter 5 Project Management “…a huge topic.” See Part 6, “Managing People”.
©Ian Sommerville 2006Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
1 Software Engineering Muhammad Fahad Khan Software Engineering Muhammad Fahad Khan University Of Engineering.
©Ian Sommerville 2000Software Engineering, 7th edition. Chapter 5 Slide 1 Chapter 5 Project Management Modified by Randy K. Smith.
Project management DeSiaMore 1.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Concerned with activities involved in ensuring that software is delivered: on.
Chapter 2 Project Management Lecture 1 1Chapter 22 Project management.
Project Management & Planning
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Risk management.
Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project management Lecture 10. Topics covered Management activities Project planning Project scheduling Risk management.
1 Risk Management. Risk concerns future happenings For today and yesterday, we are reaping what we sowed by our past actions/inactions Can we change today.
Object-Oriented Software Engineering
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects.
Chapter 15: Risk Management
Chapter 22 – Risk Management 1Chapter 22 Project management.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
CSEM01 - wk8 - Software Planning1 Software Planning CSEM01 SE Evolution & Management Anne Comer Helen Edwards.
1 The Concept of Risk A risk is defined as a variable that can take a value that endangers or eliminates success for a project. In plain terms, a risk.
Project management.  To explain the main tasks undertaken by project managers  To introduce software project management and to describe its distinctive.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
COOP Seminar – Fall 2008 Slide 1 HOUSTON COMMUNITY COLLEGE SYSTEM SAIGONTECH SAIGON INSTITUTE OF TECHNOLOGY Software Project Management.
Project Management Yonsei University 2 nd Semester, 2012 Sanghyun Park.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
Software Engineering, 8th edition. Chapter 5 1 Courtesy: ©Ian Sommerville 2006 Oct 13 th, 2008 Lecture # 6 Project management.
1 Project management. 2 Topics covered Management activities Project planning Project scheduling Risk management.
Project & Risk Management
Chap 4. Project Management - Organising, planning and scheduling
CSC 480 Software Engineering Lecture 5 September 3, 2004.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects.
©Ian Sommerville 2000Software Engineering. Chapter 5 Slide 1 Chapter 5 Project Management “…a huge topic.” See Part 6, “Managing People”.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project management 1/30/2016ICS 413 – Software Engineering1.
CSC 480 Software Engineering Project Planning. Proposal writing Project planning and scheduling Project costing Project monitoring and reviews Personnel.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Chapter 4: Project management l Organising, planning and scheduling software.
Project management (2) By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
Ashima Wadhwa.  Probably the most time-consuming project management activity.  Continuous activity from initial concept through to system delivery.
1 Project management Organising, planning and scheduling software projects.
Project management Chapter 5. Objectives To explain the main tasks undertaken by project managers To introduce software project management and to describe.
Project Management Chapter 4. Objectives Menerangkan fungsi seorang Project Manager. Menjelaskan fungsi pengurusan Projek Perisian Membincangkan Proses.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
COMP201 Project Management.
IS301 – Software Engineering V:
Project management.
Project management Lecture 9
Chapter 22 – Project Management
Presentation transcript:

Management

What is a risk? A risk is simply a probability that some adverse circumstance will actually occur.

Identify a risk you took today!

Risks in software development Who is responsible for managing risk in the development of a software product? It is the project manager’s responsibility to take actions to avoid risks .

Why should risks be considered? Risks might affect:- the project schedule or the quality of the software being developed

Why are software projects risky ? Loosely defined requirements Requirements changes due to changes in customer needs

Why are software projects risky ? Difficulties in estimating the time Difficulties in estimating resources Dependence on individual skills

Risk Management Identifying risks and drawing up plans to minimize their effect on the project is called risk management. (Hall 1998) It is an iterative process which continues throughout the project.

The Process of Risk Management Risk Identification Risk Monitoring Risk Analysis Risk Management Risk Planning

Risk Identification Possible project, product and business risks are identified. 1. PROJECT RISKS: - affect the project schedule or resources 2. PRODUCT RISKS: - affect the quality or performance of the software being developed 3. BUSINESS RISKS: - affect the organization developing or procuring the software

Risk Identification Worksheet1

Risk Analysis This is the stage in which the likelihood and consequences of risks are assessed. The probability of the risk might be assessed as: (i) Very low (< 10 %) (ii) Low (10 – 25 %) (iii) Moderate (25-50%) (iv) High (50-75%) (v) Very high (>75%)

Risk Analysis The effects of the risk might be assessed as: - (i) Insignificant (ii) Tolerable (iii) Serious (iv) Catastrophic

Risk Probability Effect Organizational financial problems force reductions in the project budget Low Catastrophic It is impossible to recruit staff with the skills required for the project High Key staff are ill at critical times in the project Moderate Serious

Risk Planning Plans to address the risk either by avoiding it or minimizing its effects on the project is drawn up. Avoidance strategies: - the probability that the risk will arise will be reduced. Minimization strategies: - the impact of the risk will be reduced. Contingency plans: - if the worst happens you are prepared for it and have a strategy in place to deal with it.

Risk Monitoring The risk is constantly assessed and plans for risk mitigation are revised as more information about the risk becomes available.

Risk Management Process Application Question Worksheet2