Inter-Commission Coordination Group On WIGOS

Slides:



Advertisements
Similar presentations
RA-VI MG-7 RA VI Management Group Meeting 7 WORKING GROUP ON TECHNOLOGY DEVELOPMENT AND IMPLEMENTATION Progress review Jochen Dibbern, Chair WG-TDI Geneva,
Advertisements

Progress on the WIGOS R-WIP in RA II JIAO Meiyan Representative of RA II China Meteorological Administration.
World Meteorological Organization Working together in weather, climate and water WIGOS R-WIP-RA VI Jochen Dibbern, RA-VI Focal Point WMO Regional Association.
RA-VI WG-TDI-3 RA-VI WORKING GROUP ON TECHNOLOGY DEVELOPMENT AND IMPLEMENTATION Report of the Chairman Jochen Dibbern Prague, Czech Republic, February.
World Meteorological Organization Working together in weather, climate and water Status of Regional WIGOS Implementation Plans and Challenges of the WIGOS.
World Meteorological Organization Working together in weather, climate and water WIGOS R-WIP-RA III José Arimatéa de Sousa Brito, RA-III Focal Point WMO.
World Meteorological Organization Working together in weather, climate and water WIGOS IMPLEMENTATION IN RA III José Arimatéa de Sousa Brito, Focal Point.
World Meteorological Organization Working together in weather, climate and water WIGOS Implementation in Region VI WMO Jochen Dibbern, Chair CBS OPAG IOS.
World Meteorological Organization Working together in weather, climate and water WIGOS Implementation in Region VI WMO Dieter Schröder Chair WG-TDI Deutscher.
World Meteorological Organization Working together in weather, climate and water Report by the President of RA III EC – LXII Doc 2.4 WMO.
WMO Collaboration with EUMETNET in WIGOS Implementation ICG-WIGOS-3 (Geneva, 14 February 2014) Miroslav Ondráš, Chief, WMO Observing Systems Division WMO;
World Meteorological Organization Working together in weather, climate and water WIGOS – WMO Foundation for Meeting the Observing needs of Weather, Climate,
Development and Implementation of the WIGOS Data Quality Monitoring System (WDQMS) Doc. 4.4 ICG-WIGOS Task Team on the Plan for the WIGOS Pre- operational.
WMO Implementation of WIGOS in RA-V (south west Pacific) Report to ICG-WIGOS-4, February 2014 Sue Barrell / Russell Stringer / Karl Monnik WIGOS - - WMO.
WMO TECHNICAL CONFERENCE ON METEOROLOGICAL AND ENVIRONMENTAL INSTRUMENTS AND METHODS OF OBSERVATION TECO-2008 ______________________________________________________________.
Overview of WIGOS activities in RA-IV Curaçao 2 December 2015.
World Meteorological Organization Working together in weather, climate and water ICG-WIGOS 5 Progress on WIGOS activities within CBS WMO Dr. Jochen Dibbern.
WORLD METEOROLOGICAL ORGANIZATION INTER-COMMISSION COORDINATION GROUP ON WIGOS (ICG-WIGOS-5) FIFTH SESSION José Arimatéa de Sousa Brito, Chair RA III WG-ITD.
WIS -WIGOS 21 deliverables and 39 activities are planned for for WIS and WIGOS.
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
Regional Association III
WIGOS IMPLEMENTATION LEAD BY WORKING GROUP ON INFRASTRUCTURE
The Plan, Status and First Results
Report by the President
Concept Proposal for RA-III Regional WIGOS Centre
Regional WIGOS Centres
The Jakarta Declaration
Ivan Čačić President RA VI
Hello Bonjour General Introduction and objective of the meeting
OPAG on Integrated Observing Systems
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
ET-SBO Report to ICT-IOS-9
5th Session of the Task Team on WIGOS Metadata
(Dakar, Senegal, 28 – 30 September 2016)
Regional Basic Observing Network Concept
Regional Basic Observing Network Co-chair, CBS/OPAG-IOS
The Plan, Status and First Results
Regional WIGOS Centres
WIGOS Pre-operational Phase
Regional WIGOS Center in RA VI
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
4.2(2) WIGOS Editorial Board (WEdB)
WIGOS implementation in RA II
OSCAR/Surface (User Perspective)
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
Purpose of the Workshop President of RA VI (Europe)
Overview of the WMO Integrated Global Observing System (WIGOS)
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
Decisions on CBS activities to support WMO priority activities
REPORT on RWCs in RA VI Ivan Čačić President RA VI ICG-WIGOS-7
Decisions and Recommendations for the
WIGOS Preparedness Report by RAI
FUTURE WORK AND STRUCTURE,
Workshop (… 2016) WIGOS Project Office
WMO Information System
Status and Plan of Regional WIGOS Center (West Asia) in
WMO RA-II WIGOS Workshop Workshop summary and recommendations
WIGOS Pre-Operational Phase;
Regional WIGOS Centre Tokyo
Proposed functionalities of RWC
WIGOS Implementation in Region IV
ET-WISC structure and work plan
WIGOS regulatory and guidance material
The WIGOS Pre-Operational Phase
WIGOS - Regional and National Implementation Planning
Document 5.4.1(4) Regional Basic Observing Network (RBON) Concept
The status and Plan in 2019 for the WIGOS centers in RA II
ICG-WIGOS, eigth session, Jan 2019
Inter-Commission Coordination Group On WIGOS
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
Presentation transcript:

Inter-Commission Coordination Group On WIGOS Seventh Session Geneva, Switzerland, 15-17 January 2018 INSTITUTO NACIONAL DE METEOROLOGIA PROGRESS TOWARDS IMPLEMENTATION OF WIGOS (Regional Association III) José Arimatéa de Sousa Brito Chair, RA-III WG-ITD

REGIONAL ASSOCIATION III WORKING GROUP ON INFRASTRUCTURE AND TECHNOLOGICAL DEVELOPMENT (Asunción, Paraguay, October 2017) Recommendations related to WIGOS: Members to update inventory of national networks regularly Members to begin process of developing national observing strategies and national WIGOS IPs Members encouraged to engage partners raising their awareness of WIGOS benefits Development of a project for development of a regional weather radar mosaic Members to update urgently the WIGOS, WIS, OSCAR/Surface national focal points OSCAR/Surface NFPs to review current situation (heritage from Volume A) and start new entries Members to establish their new WIGOS ID systems Rapporteur appointed to monitor regional aspects of OSCAR/Surface after WS (Lima, Peru)

Recommendations related to WIGOS to next RA-III: REGIONAL ASSOCIATION III WORKING GROUP ON INFRASTRUCTURE AND TECHNOLOGICAL DEVELOPMENT (Asunción, Paraguay, October 2017) Recommendations related to WIGOS to next RA-III: WIGOS General Issues (Previous slide) Transition to RBON Joint TT with WGs Hydrology and Climate to identify different WMO App Areas Draft RBON proposal to be submitted to RA-III Session (November 2018) RA-III Regional WIGOS Center Task Team created and experts designated. Detailed proposal to RA-III session Task team will cover regional aspects of WIGOS data quality monitoring

INITIAL CONCEPT FOR RA III RWC P = Participant center with required infrastructure RA-III RWC Coordination Committee (Mandatory and Optional functions) P1 P2 P3 Mandatory functions and/or Optional functions Mandatory functions and/or Optional functions Mandatory functions and/or Optional functions

PROCESS FOR THE ESTABLISHMENT OF RA-III WRC a) Initial proposal submitted by the Chair of WG-ITD to the President of RA-III and ICG-WIGOS-6 b) Proposal submitted to RA-III MG, for the review and endorsement c) Proposal submitted to WG-ITD session in Asunción, Paraguay, in October 2017 d) WG-IDT reviewed, created a Task Team and designated its experts e) TT-WIGOS-RA3 will submit a proposal to next RA-III with a process for selection of candidates for WRC f) Members will be invited by the president of RA-III to submit their candidatures for RWC g) TT-WIGOS-RA3 will analyze candidates for WRC and submit the proposal to RA-III MG for endorsement h) The president of RA-III on behalf of RA III will establish WRC components with identified functions and responsibilities

WIGOS STATION IDENTIFICATION SYSTEM FOR BRAZIL

EXAMPLES OF INMET´S WIGOS STATION IDENTIFICATION 0-20000-0-83377  Corresponds to INMET´s surface station located in Brasilia as registered in OSCAR (from Volume A) 0-76-100-5300108CO83377  Corresponds to a new ID for the existing Conventional Station indicated above 0-76-100-5300108AS00001  Corresponds to a new INMET’s Automatic Weather Station located in the Federal District (Brasilia)

SHORT UPDATE ON WIGOS-SAS/CP PROJECT HIGH LEVEL RECONITION – THE MOST EFFECTIVE WIGOS OUTREACH INSTRUMENT IN THE REGION PLATFORM FOR OTHER REGIONAL PROJECTS: ALERT-AS, FLASH FLOOD, SWFDP FUNDING BY OFDA/USAID ONGOING ACTIVITIES

PROJECT ACTIVITIES AND BUDGET Activity USD Transfer of the current HIS Plata prototype to GISC Brasilia 30.000 Regional Workshop to train experts from 5 participating countries on WIGOS-WIS-WHOS issues 15.000 National meeting in each of the 5 participating countries, with invitation extended to potential partners, under coordination of the experts which attended the Regional Workshop. 50.000 Technical assistance, which includes visits of experts to the 5-participating country to:   Install webservices in 5-participating countries and adaptation of their respective databases Train local experts on the operation and maintenance of the system 75.000 Complementary hardware and software 40.000 TOTAL 210.000

PROJECT SCHEDULE

Thank you!