WGCV-32 Action Item Review

Slides:



Advertisements
Similar presentations
Working Group on Calibration and Validation Working Group on Cal/Val Update Albrecht von Bargen (DLR) SIT-30 Agenda Item 10 CEOS Work Plan Deliverables.
Advertisements

WGClimate Work Plan for John Bates, Chair WGClimate 4th Working Group on Climate Meeting.
Working Group on Calibration and Validation CEOS-WGCV Activity Report Albrecht von Bargen DLR Agenda Item 7 CEOS-SIT Workshop # 39 EUMETSAT, Darmstadt.
Committee on Earth Observation Satellites Albrecht von Bargen, DLR Plenary Agenda Item # th CEOS Plenary Kyoto International Conference Center Kyoto,
The International Ocean Colour Coordinating Group International Network for Sensor Inter- comparison and Uncertainty assessment for Ocean Color Radiometry.
Incoming Themes for 2017 Frank Kelly, USGS
Analysis Ready Data LSI-VC – Adam Lewis Co-chair
Future directions of CEOS WGCV: Incoming chair perspective
Moderate Resolution Sensor Interoperability (MRI) Framework
CEOS Carbon Strategy – WGClimate Actions
Moderate Resolution Sensor Interoperability (MRI) Initiative
Committee on Earth Observation Satellites
Albrecht von Bargen, Chair CEOS WGCV DLR Agenda Item # 6 GSICS-EP 17
WGISS Working Group for Information Systems & Services
CEOS Status/Overview Steven Hosford WGCapD-7 Agenda Item #6
Action Item Review for WGCV-44
Action Item Review for WGCV-43
Committee on Earth Observation Satellites
CEOS Work Plan Steven Hosford WGCV-43/WGISS-45 10th April 2018
WGISS-WGCV Joint Session
WGCV Work Plan Actions K. . Thome NASA WGCV Plenary # 43
CEOS Workplan FDA actions
Status of Carbon Action Items
Analysis ready data: definition document
WGCV Overview K. Thome WGISS#45 / WGCV#43
CEOS Status/Overview Steven Hosford WGCV-43/WGISS-45 10th April 2018
GSICS/WGCV Linkages K. Thome NASA WGCV Plenary # 44
WGCV Report Albrecht von Bargen (DLR) Kurt Thome (NASA)
WGCV Chair’s Report K. Thome NASA WGCV Plenary # 44
Site classifications, definitions, and updates to Landnet
Day 2 Summary K. Thome NASA WGCV Plenary # 44
Day 3 Summary K. Thome NASA WGCV Plenary # 43
WGISS/WGCV Session summary and WGCV Action Item Status
Action Item Status / CEOS Work Plan Status
WGCV-43 meeting overview, goals, and agenda approval
WGISS Working Group for Information Systems & Services
Carbon Actions for WGCV
Day 3 Summary K. Thome NASA WGCV Plenary # 44
WGCV-44 meeting overview, goals, and agenda approval
Carbon Actions for WGCV
Proposed 2019 CEOS chair initiative
Proposed WGCV CARD4L assessment process
WGCV Chair’s Report K. Thome NASA/GSFC WGCV 42
WGISS Working Group for Information Systems & Services
Communicating Terminology and definitions
CEOS & Work Plan Status Steven Hosford WGCV-44 28th August 2018
Review of Chair Priorities
LSI-VC Work Plan Updates
Committee on Earth Observation Satellites
Closure of WGCV actions (CV-01; CV-09; CV-13; CV-16)
CEOS Workplan Steven Hosford LSI-VC-5 Agenda Item #1.3 February 2018
Working Group on Cal/Val Update
WGCV Work Plan Actions K. Thome NASA WGCV Plenary # 44
Day 2 Summary K. Thome NASA WGCV Plenary # 42 May 16-19, 2017.
WGCapD Perspectives of Work Plan –
Uncertainties for Analysis Ready Data
Day 2 Summary K. Thome NASA WGCV Plenary # 42 May 16-19, 2017.
Implementation Update
WGCapD: Working Group on Capacity Building and Data Democracy
RadCalNet/Landnet process for adding new sites
WGCV-42 meeting overview, goals, and agenda approval
CEOS Context LSI/SDCG/GEOGLAM Joint Meeting
Stephen Briggs European Space Agency SIT Workshop Agenda Item #13
CEOS Working Group on Climate (WGClimate)
WG Calibration and Validation
Session 2: CEOS Analysis Ready Data for Land (10:50 – 11:00)
WGCV CARD4L Peer Review Medhavy Thankappan WGCV-45 July 15-19, 2019.
WGCV Chair’s Report C. Ong CSIRO WGCV Plenary # 45
WGCV-45 meeting overview, goals, and agenda approval
DEM related topics K. Thome NASA WGCV Plenary # 45 CSIRO, Perth
Presentation transcript:

WGCV-32 Action Item Review K. Thome NASA WGCV Plenary # 42 May 16-19, 2017

Day 1 Actions WGCV-42-01 WGCV Chair (Thome) to work with MRI Leads (Fosnight, Ong, Moreno) to develop clearer guidance for WGCV’s effort in support of MRI WGCV-42-02 P. Henry to supply WGCV with background description of SPOT Heritage efforts for orthorectified TOA data to Sentinel 2 grid WGCV-42-03 – requires editing Feedback from WGCV members regarding methods for producing surface reflectance prior to 2000

Day 2 Actions WGCV-42-04 Sub-bodies chairs to provide information to WGCV Secretariat regarding their sub-group’s mission, objectives, membership, and brief overview about the activities. Information will be implemented for each sub-bodies web appearance on the updated WGCV web portal sites within the WGCV web concept 2017. Actionees: sub-bodies chairs ex LPV & SAR Due Date: September 30, 2017 Comment: This is overwrites the action item WGCV-38-07 # Action Item Lead Due Date Status WGCV- 38-07 MWSG Chair to provide definition /information of his sub-group to B. Bojkov and A. Burini (ESA) for hosting on cal/val portal X. Dong WGCV-39 Pending complet ion of WGCV- 42-04

Day 2 Action – catch up WGCV-42-05 IVOS chair will submit list of MTF test sites to the newly-formed RadCalNet Admission Panel that also serves as approval process for Landnet-related test site approval Due date October 31, 2017 WGCV-42-06 WGCV Chair will request RadCalNet Admission Panel to propose a method for providing MTF estimation methodologies to the community Due Date October 31, 2017 R.2017-3 IVOS recommends that the test sites in the MTF catalogue should be made available as CEOS recommended sites. R.2017-4 IVOS recommends that a CEOS-recommended reference dataset is provided for the community to test their MTF estimation methodologies

Day 2 Actions WGCV-42-07 WGCV Chair will distribute RadCalNet Admission Panel Terms of Reference to WGCV membership for approval Due date – May 31, 2017 WGCV-42-08 WGCV Chair with IVOS Chair will inform WGCV of RadCalNet Admission panel membership Due date – July 31, 2017 R.2017-1 Following the successful Beta Testing of RadCalNet, IVOS is looking for CEOS-WGCV endorsement for opening as an operational network (once the remaining tasks listed in the RadCalNet WG minutes are complete). IVOS asks WGCV to set up the necessary governance structure to approve RadCalNet sites.

Day 3 Actions WGCV-42-09 WGCV chair will distribute to membership the WGCV-CA items assigned during WGCV-42 for completion by WGCV-43 Due Date: June 7, 2017 WGCV-42-10 WGCV chair will distribute to membership the WGCV-CA longer term items for comment Due Date: June 14, 2017 WGCV-42-11 DEM-related action to capture material presented by D. Gesch

Backup – Open actions from previous meetings and CEOS Work Plan

CEOS Work Plans Learning by doing - through pilot projects Future Data Architecture pilot projects to understand how CEOS Agencies can work together on technical activities CEOS Data Cube activity supported by LSI-VC Collaboration with WGCV Provide sample ARD for trial implementations of CEOS Data Cube FDA-7: Product Specifications in accordance with the CARD4L Framework   Q4 2017 CEOS Analysis Ready Data for Land (CARD4L) will be satellite data that have been processed to a minimum set of requirements and organized into a form that allows immediate analysis with a minimum of additional user effort, and, interoperability both through time and with other datasets. LSI-VC will commence development of the first concrete specifications for CARD4L-branded products, with at least two such specification documents presented for endorsement at the 31st CEOS Plenary Meeting. Draft versions of these specifications will be used to inform LSI-VC contributions to FDA-4. LSI-VC (with WGCV)

CEOS Work Plan - Progress implementation of the CEOS Strategy for Carbon Observations from Space Targeted initiatives to advance to implementation of the CEOS Strategy for Carbon Observations from Space CARB objectives/deliverables proposed over the 2017-2018 period CARB-19: Land products validation listing and framework Q4 2017 Summarize current list of validated land data products relevant to Carbon Strategy, documenting validation framework and protocols and providing guidance for online platform for intercomparison of terrestrial carbon products.  PROPOSED AS CLOSED VIA PRESENTATION ON DAY 3 OF WGCV-42

Capacity Building, Data Access, Availability and Quality CB-22: Provide capacity building support to WGCV activities Q2 2018 Collaborate with WGCV to develop materials to promote e.g., QA4EO, LandNet, optical and SAR calibration/validation. The 2017 meeting of the WGCapD will be a key event in defining specific priorities. WGCapD with WGCV CV-1: Update of general WGCV website to enhance better communication across CEOS and users Q3 2017 Re-organization of WGCV website concept which includes on one side the entry on the CEOS portal, the CEOS CalVal portal, and the different subgroup web-sites in order to achieve a better outreach and communication strategy. WGCV CV-3: Workshop on state of the art for pre-flight calibration techniques Q4 2017 Hold an open-invitation workshop to discuss and promote best practices on pre-flight and onboard calibration of sensors, initially focusing on optical.

Capacity Building, Data Access, Availability and Quality CV-9: Radiometric Calibration Network (RADCALNET) Q4 2017 Establish an automated network via a multi-agency project, including coordination infrastructure, and land-based test-sites for post-launch traceable calibration of sensor radiometric gain, initially for <50 m resolution sensors. Progress will follow the developed project plan. WGCV CV-13: Intercomparison of atmospheric correction models   Q4 2018 The WGCV task team “Atmospheric correction” will carry out several comparison measures between models and report about their findings including recommendations with respect to EO applications.

Capacity Building, Data Access, Availability and Quality CV-14: Report on application of approaches for cloud masking   Q4 2018 The WGCV task team “Cloud masking” will research different cloud masking approaches for different sensors and spectral areas in order to deliver a report about their findings including recommendations for the applications of cloud masking in EO applications. WGCV CV-15: L1 top-of-atmosphere interoperability Q4 2017 Develop an initial recommendation of a community reference in collaboration with GSICS. CV-16: Report on outcomes from GSICS/CEOS reference Solar Spectrum evaluation Q2 2018 Cooperation through a series of Web Meetings to evaluate recent advances to recommend a solar spectra for GSICS and CEOS to ensure interoperability.

Advancement of the CEOS Virtual Constellations Characterize the Virtual Constellations in the context of both the development of the space segment for GEOSS and of the multitude of outcomes and deliverables that CEOS seeks to provide for GEO and other users and framework VC-27: Develop a roadmap for the routine production of intercomparable CARD4L   Q4 2018 Building on agreed specifications of CARD4L products, LSI-VC will develop a roadmap for how interested CEOS Agency missions and programs can start processing land surface imaging data with geometrically and radiometrically intercomparable surface reflectance, surface temperature, and analogous radar products  LSI-VC with WGCV

Advancement of the CEOS Virtual Constellations VC-29: Framework for moderate resolution land sensor interoperability   Q2 2018 Increasing numbers of users are interested in the development of product pipelines that are not completely dependent on the characteristics of a single sensor, when a number of different sensors may be able to provide data that is fit for purpose. Interoperability, however, is challenging to define in a manner that enables such users to move beyond theory and in to practice. The framework to be developed will be generally applicable and address factors including radiometry, geometry, data formats, browse information, metadata, data access, metrics and reporting. LSI-VC (with WGCV and WGISS) VC-30: Interoperability case study for Landsat and Sentinel-2 Q4 2017 The framework for moderate resolution land sensor interoperability (refer VC-29) will be applied to the Landsat and Sentinel-2 missions. LSI-VC (with WGCV)

WGCV Action Item status Open Action Item (AI) from the last WGCV meetings: 2 from WGCV-38 8 from WGCV-39 3 from WGCV-40 6 from WGCV-41

Change to Closed at WGCV- 42 WGCV-38 Action Item Status # Action Item Lead Due Date Status WGCV- 38-02 IVOS Chair to setup a doodle poll regarding availability of participants for a follow-up telecon to the October 2013 WebEX session with user community on the development of best practices for use of External Solar Irradiance Spectrum IVOS chair (N.Fox) New due date (WGCV 39) is End of September 2016 Change to Closed at WGCV- 42 WGCV- 38-07 MWSG Chair to provide definition /information of his sub-group to B. Bojkov and A. Burini (ESA) for hosting on cal/val portal X. Dong WGCV-39 Pending completion of WGCV- 42-04

WGCV-39 Action Item Status # Action Item Lead Due Date Status WGCV- 39-02 Propose methodology for updating LandNet list of approved test sites (both removal of non-active sites and inclusion of new sites) Thome IVOS-28 Pending until end of WGCV-42 WGCV- 39-03 Present proposed method for LandNet site update to WGCV plenary Fox WGCV 40 WGCV- 39-04 Provide updated information regarding LandNet to the Cal/Val portal WGCV 40+ 1 week Open

WGCV-39 Action Item Status # Action Item Lead Due Date Status WGCV- 39-08 Draft GSICS/WGCV collaborations based on WGCV-39 Sub-Group presentations provided to GSICS, WGCV, and Sub-Group chairs for comments Vice Chair / Chair July 31, 2015 Open A. Von Bargen has provided a proposed linkage to be forwarded to GSICS and WGCV members by Thome

WGCV-39 Action Item Status # Action Item Lead Due Date Status WGCV- 39-17 Cloud Masking Task work plan including objectives; schedule; and deliverables Bojkov (EUMETSAT) WGCV-42 Open WGCV- 39-18 Global DEM Task work plan including objectives; schedule; and deliverables Muller (UCL) WGCV- 39-19 Add cross-reference on the WGCV web page to GMTED2010 for coarse resolution sensor geometric and radiometric calibration Burini/Bojkov (ESA) WGCV- 39-23 Formulate a draft concept for the use of the Cal/Val portal and CEOS web site by WGCV Chair and Secretariat in cooperation with ESA June 15, 2015 Pending per presentation at WGCV-42

WGCV-40 Action Item Status # Action Item Lead Due Date Status WGCV- 40-01 WGCV Chairs will clarify in accordance with the roles and responsibilities in cooperation with OCR-VC and IOCCG [after having received the answer from IOCCG with respect to the IVOS statements] CEOS WGCV Chair and Vice Chair WGCV-42 Open WGCV- 40-02 An ad-hoc team comprising one member out of the subgroup LPV, IVOS and ACSG and the CEOS WGCV chair shall recap the terminology needed for validation metrics and formulate along the LPV validation metrics a coherent validation metrics for data products applicable in general with the starting point of individual satellite data products. This shall be developed such that the metrics can be extended in a follow-on step to the requirements of time series / climate data records. CEOS WGCV Chair and LPV, IVOS, AC Subgroup Chairs WGCV-41

WGCV-40 Action Item Status # Action Item Lead Due Date Status WGCV- 40-07 CEOS WGCV secretariat is drafting a WGCV work plan as outlined. CEOS WGCV and Secretariat WGCV-41 Pendinng

WGCV-41 Action Item Status # Action Item Lead Due Date Status WGCV-41-01 CEOS WGCV Chair will contact WGCV members and subgroup Chairs by email to solicit information regarding on-going and proposed efforts related to cloud masking studies including definitions, requirements, and methods for cloud masking, and points of contact. The deadline for responses will be two months after the email request and responses will be forwarded to the WGCV Cloud Masking Task Group Chair 15 October 2016 Open

WGCV-41 Action Item Status # Action Item Lead Due Date Status WGCV-41-02 CEOS WGCV Chair will contact WGCV members and subgroup Chairs by email to solicit information regarding on-going and proposed efforts related to DEM studies including definitions, requirements, and methods for DEMs, and points of contact. The deadline for responses will be two months after the email request and responses will be forwarded to the WGCV DEM Task Group Chair 15 October 2016 Open

WGCV-41 Action Item Status # Action Item Lead Due Date Status WGCV-41-03 Interoperability action from IVOS recommendations see IVOS talk Vice-Chair IVOS 29 Open R.2016-1 IVOS shares a vision on the need to establish a community reference for sensor Level 1 TOA interoperability. It will create an umbrella project (in collaboration with appropriate GSICS sub-groups) and set of related sub-projects/activities to achieve that goal.

Closed at WGCV-42 WGCV-41 Action Item Status # Action Item Lead Due Date Status WGCV-41-04 All sub-body leads and WGCV members commenting and amending the website concept All 15 October 2016 Closed at WGCV-42 WGCV-41-05 Chair to meet with GSICS-EP vice chair and discuss GSICS workplan in term of collaboration Chair End of September 2016 WGCV-41-06 Provided draft list of WGCV action in response to Carbon actions Vice-Chair 1 December 2016 Open WGCV-41-04 addressed via Sept. 15, 2016 email from WGCV Secretariat requesting comments from WGCV membership by Oct. 15 WGCV-41-05 addressed during telecon Fall 2016