Cost Optimization Models for SRF Linacs

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
12 GeV Upgrade of Cryogenics at Jefferson Laboratory (Jlab) Dana Arenius Engineering Division Cryogenic Systems ILC08 Nov This work is supported.
LEP3 RF System: gradient and power considerations Andy Butterworth BE/RF Thanks to R. Calaga, E. Ciapala.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Rong-Li Geng Jefferson Lab High Efficiency High Gradient Cavities - Toward Cutting Down ILC Dynamic Heat Load by Factor of Four R.L. Geng, ALCW2015,
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
Proposed machine parameters Andrei Seryi July 23, 2010.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
2 K cryogenic plant turn-down Two slides from a talk by Laurent Tavian (CERN) Presented at Fermilab (27 Sep 2012) With introduction from Tom Peterson (Fermilab)
BIA’s Director Review, September Accelerator Improvements FY11-16 Fulvia Pilat.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Operated by the Southeastern Universities Research Association for the U. S. Department of Energy Thomas Jefferson National Accelerator Facility 6 March.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Jonathan Creel Electrical / Cryogenics Engineer Cryogenics.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
SRF Operating Experience at JLab
Cost Optimization Models for SRF Linacs
ILC Power and Cooling VM Workshop
Process Simulation for the LCLS-II Cryogenic Systems
Requirements for Efficient CW SRF Cryomodules
ILC Accelerator Update
FRIB Cryogenic Support
Cryogenic Heater Controls in C100 Cryomodules
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Summary of WG2 :CFS for staging
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Project X: Cryogenic Segmentation Issues
BDS Cryogenic System RDR Status and EDR Plans
Jefferson Lab, Newport News, U.S.A.
Hosting Orsay Walid KAABI
Joint Accelerator Research JGU & HZB
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
High Gradient Cavities: Cost and Operational Considerations
ESS RF Development at Uppsala University
BriXS – MariX WG 8,9 LASA December 13, 2017.
Notkestrasse 85, Hamburg, Germany
ILC GDE meeting Cryogenics
High Q Cavity Operation in the Cornell Horizontal Test Cryomodule
V. Veshcherevich Cornell University
Introduction to Jefferson Lab
C75 Risk Assessment Geoff Krafft
CEPC RF Power Sources System
Operations Department
ADS Accelerator Program in China
Mathew C. Wright January 26, 2009
SCRF for cw operating XFEL
Matthias Liepe Zachary Conway CLASSE, Cornell University June 1, 2009
Operations Department
Thoughts on Energy Reach
Update on Dark current generation in ILC Main Linac
ILC Cryogenics -- Technical Design Report Planning
Performance Recovery at CEBAF
Accelerator Physics Particle Acceleration
Accelerator Physics Particle Acceleration
Accelerator Physics Particle Acceleration
V. Veshcherevich Cornell University
ERL Director’s Review Main Linac
Tom Peterson, Fermilab 6 December 2011
Comparison between 4K and 2K operation performance of CEBAF injector cryomodules Grigory Eremeev Monday, August 19, 2019.
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

Cost Optimization Models for SRF Linacs TTC Workshop June 2013 Final Cost Optimization Models for SRF Linacs Tom Powers

Overall Cost Calculation How Many Cryomodules? Include Inner Cryomdule Girders And Controls Determine Qo At E and F Calculate Loaded-Q’s Including Variance Calculate Heat Load w/Margin Calculate Linac Civil Costs Number of Plants? Permutations on RF Power Calculate Cryo Plant Costs Calculate Cost Calculate Linac Hardware Costs Calculate Cryo Infrastructure Costs Calculate AC Power Overhead And 10 Year Costs Determine Linac AC PWR Calculate AC Efficiency

Cryogenic Plant Considerations A 2 K liquid helium cold box is limited by transportation infrastructure to about 18 kW at 4 K which equates to 5 kW at 2 K, and 3.8 kW at 1.8 K.* It is beneficial from a design and maintenance standpoint to build mulitple copies of the same plant. For these reasons in the model, any time that the plant exceeds a multiple of 5kW @ 2K the plant was split into two identical plants and the efficiency will come from the following curve. The cost of a cryo plant doubles (at least) if you buy it turn key rather than buying the components, (compressors, coldboxes, oil removal systems, etc.) seperately.* For this model we used $25M for the cost of a 5 kW@2K plant and $5M for civil and infrastructure costs (based on the CEBAF 12 GeV project). The costs were escalated and the efficiency reduced by 30% at 1.8K. These factors can be adjusted by the user. *Dana Arenius, Jefferson Lab, Personal Communication

Cryo Plant Efficiency as a Function of Heat Load Ganni, R., et. al., “Cryogenic Systems Improvements,” JLAB Science and Technology Review, May, 2008.

Resultant Cost and Efficiency Curves for the Cryo Plant

Different Approaches for Optimization. Non causal cryomodules. Smooth curves of frequency dependence by. Using a fixed active length per cryomodule and thus a fixed number of cryomodules, Using fractional number of cavities within each cryomodule. Variable number of cells per cavity and cavities per cryomodule. Scale shunt impedance as 1/f. Provides curves that have steps as you change cavity parameters and number of cryomodules Variable gradient for specific cavity/cryomodule designs Effectively optimizes on the number of cryomodules to reach the design energy gain. Provides smooth results with steps for cryo plant configurations.

Qo Calculations Q0 as a function of frequency and temperature at 16 MV/m. All frequencies scaled from CEBAF C100 upgrade cavity. Q0 is calculated for each data point, and is based on a compilation of historic data. This historical data is a compilation from measurements taken in the vertical test area at Jefferson Lab.* *Ciovati, G., et. al., “Residual Resistance Data from Cavity Production Projects at Jefferson Lab,” IEEE Transactions on Applied Superconductivity, Vol 21, No. 3, June 2011

SRF Parameters Variables Includes General cavity parameters Beam current and phase Detune allowance for microphonics, helium pressure variations, tuning uncertainty, etc. RF power margin Maximum allowed loaded-Q Material type and treatment Linac energy Linac Packing factor (Total L / Active L) ERL? Uses resultant current and tune up beam for RF Power calculations

Baseline Costs Variables Cryomodule fixed cost includes installation and testing. RF power costs includes transmission, circulators, etc. Inner cryomodule girder includes magnets, controls, valves, viewers, etc. Tunnel civil costs includes service buildings, AC power, LCW, etc. Cryo plant is based on CEBAF upgrade costs assumes you buy the major components double or triple the cost if you buy a turn-key plant. Linac R&D costs includes prototype cryomodule as well as remainder of electronics.

Other Inputs/Controls Ability to what if Qo improvements by adjusting scale and slope. ERL parameters to adjust resultant current and tune beam. Temperature array allows one to change the parameter. Cryomodule type allows one to select between several types with one being user defined. This is only used on the sweep gradient module. Beam current slider. Also have buttons to pause, save results, save and restore set up parameters.

Output Parameters Costs of different components of the overall costs. 10 year AC power costs Linac Length Match Loaded Q Qo at E and F RF power per cavity All output parameters during a sweep can be written to a file or viewed on live graphs.

Summary Executable files (Windows 32 Bit and Windows 64 bit) will be available by the end of next week at: https://userweb.jlab.org/~powers/ Demonstration to follow Comments and suggestions welcome.

Backup Slides

Jlab Cryomodule Cost History A. McEwen Data taken from closed projects, C100 is estimated Engineering costs included Overhead Rates lowered for C100,SNS,CEBAF projects XFEL estimate ~$1.7M? ILC estimate ~$1M?

QL Optimization for Minimum Power Depending on the application (injector/LINAC or ERL) the cavity QL must be optimized for minimum power. Beam Loaded Cavity Lightly-non beam loaded Cavity Cavity Detuning Beam loading pushes the QL lower …..less susceptible to microphonics. Lightly loaded cavities, like and ERL, may have QLs closer to 5e7 I = 10 mA I = 1 mA

Allow for Transient Beam Loading? Measured and predicted RF drive amplitude and phase due to CW beam loading in an ERL where the effective current is approximately 7% of the single pass beam at 75º. Tune Beam Transient, 600 uA, Phase  0° 1 Measured gradient 2 Measured phase 3 Magnitude drive 4 Phase drive No Transient Loading