+ 1 Introduce of Anti-Piracy Solution First Dimension : No approach

Slides:



Advertisements
Similar presentations
OSHA Most Frequently Cited Serious Violations
Advertisements

SAVE OF LIFE AT SEA (S.O.L.A.S)
0 - 0.
Disability Fire Evacuation Procedure. Essential Information from you If you have a disability that effects your ability to evacuate from a building or.
Lesson 9 Design & Construction of Food Premises & Equipment
OSHA Office of Training and Education
Facilities Management and Design Chapter 4 Safety and Security systems.
A Survivals Guide. Anytime the bell rings while students are outside, this will signal that students will need to come into the building (possible reasons.
REACH Partnership MIDDLE/ HIGH SCHOOL #341 EMERGENCY SAFETY PLAN
Closed Area Construction
INTRUSION ALARM TECHNOLOGY
2.01 Understand safety procedures Environmental Safety Fire Safety 2.01 Understand safety procedures 1.
S ECURITY A LARM S YSTEM. I NTRODUCTION Security alarms are electronic alarms designed to alert the user to a specific danger. Security alarms have become.
Secure-Marine A Partner in Maritime Security Secure-Waters Event Friday, 18 th of September, 2009 Fax: Tel:
Regulations (Standards - 29 CFR) Flammable and Combustible liquids
Let’s watch a DVD… DVD Instructor Notes
1 Maritime Law Enforcement. 2 INTRODUCTION Naval Forces as economic & effective law enforcement units Risk of Excessive Use of Force Avoided by –law enforcement.
1 BASIC COAL FIRED BOILER ATTENDANCE TRAINING COURSE.
MARITIME SURVEILLANCE MISSIONS
State Fire Marshal Question and Answer Session with the Louisiana Automatic Fire Alarm Association March 19, 1999.
Boilers Dept. of Mech & Mfg. Engg..
There are three types of emergencies:  Internal  External  Natural disasters.
SPC-LE SPEC’S NAV & PILOTING SPC-LE.
United States Fire Administration Chief Officer Training Curriculum Operations Module 13: Enclosed Mall Simulation Exercise.
How Electronic Security Solutions can Help the Government in Securing its Assets and Reduce Energy expenditure Presented By- Nimish Vishnoi Manager-Product.
SPANOS NIKOLAOS COMMANDER H.C.G. EXPERT P.S.C.O
Safety & Your Vehicle and Safety Margins
Motorcycle product sheets
Ship Profiles.
Secure-Ship The Ship Protection System Technical Description Fax: Tel:
Copyright 2004 Foreman Architects Engineers School Security From Common Sense to High Tech.
Environmental Health & Safety Fire Safety for MSO, Medical Students and Nursing Students.
Cancer Center Training 2012 Cancer Center Training 2012 “Defend in Place” Strategy for Fire Alarm Activations Cancer Center Building #7559.
UNIT 3 THE VEHICLE AND ITS COMPONENTS USE OF BASIC VEHICLE COMPONENTS
Fire Safety in Burnside Hall
SHIP SURVEILLANCE AND GUARD SYSTEM
PIRACY. What is the threat. Where is it happening. What action can be taken onboard the ship.
Emergency Planning. An emergency is any unplanned event that can cause death or significant injury to employees, customers, or the public. Emergencies.
Prevent False Alarms Eugene A. Cable, P.E., M.S.F.P.E. Life Safety Consultants NEHES Honorary Member 412 Horse Heaven Road Averill Park, New York
How to create... A Fire Evacuation Plan.
Module 2: General Working Conditions 2.5 Confined Space Entry Susan Harwood Grant Number SH F-23.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
BUILDING SECURITY ALARM SYSTEM. BUILDING SECURITY ALARM SYSTEM Any electrical or mechanical device which is designed or used for the detection of an unauthorized.
1. 1.Define Systems Approach 2.List selection criteria for selecting at- risk neighborhoods. 3.Define neighborhood boundaries. 4.List assessment team.
Safety Unit Lesson 4 Demonstrate area safety by identifying safety hazards and implementing and using safe procedures.
1. KEY FEATURES VESSEL IS OCCUPIED WITH FULLY AUTOMATIC SYSTEM IN SUCH A WAY THAT 4 CREW CAN OPERATE THE VESSEL MANEUVERING AND CARGO LOADING/DISCHARGING.
Lesson 17 KEEPING WATCH. WATCHKEEPING 4 STCW 1978 (1995) 4 Watch (1) time period; (2) personnel 4 Personnel: Engineer officer in charge (watchstanding.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
Health & Safety at Craighall Campus. This brief introduction provides details of our safety and emergency arrangements at Craighall Campus.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
United States Power Squadrons ® B Definitions  Dead Reckoning  Calculating a boat’s position based on its course, speed, and time run from a.
Power Distribution System General Location. Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties.
Internal Communications Systems
3 Areas of a Ship (For our discussion purposes).
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Company Presentation 2016 A short introduction to I&C Services BV.
 Is the room or platform from which the ship can be commanded. When a ship is underway the bridge is manned by an OWO (officer of the watch) aided usually.
Fire Safety. FIRE SAFETY Know location of fire alarm pull stations. Know at least two evacuation routes. Familiarize yourself with location of fire extinguishers.
West Cambridge Data Centre Ian Tasker Information Services.
Safety Rule #1 Open flames are not allowed without first obtaining a permit. The exception to this rule is during a period of closely supervised instructions,
Presentation of equipment.
Lesson 4 Manning of Vessels.
Residence life Safety Training
Personal Protective Equipment
February 2019.
Firefighting equipment
Fire Safety Training 1.
HarborGuard-Pro© Offshore Early Detection and Warning System
LIFT,ESCALATOR AND MOVING WALKS
Presentation transcript:

+ 1 Introduce of Anti-Piracy Solution First Dimension : No approach Second Dimension : No aboard Third Dimension : No contact + Long & short distance Defense (1st defense) To prevent of approaching and obstruct with 2nd defense method when piracy trying to attack 2nd Defense to prevent of aboard It also operates during 1st defense Impregnable Passive Defense Proving safe citadel during 3~5days

2 Sequential Evacuation Scenario Searching Defense Blockade 1st Evacuation 2nd Evacuation Considering the approaching speed of piracy, Evacuation should be done within 5~7min.

Automatic Detection of UFO 2 Sequential Evacuation Scenario A. Stage I : Searching Searching for piracy - Radar system (BNWAS, SSAS, LRIT) Call for help(Coast guard / Navy) Announcement of caution(LQ and work area) BNWAS : Bridge Navigational Watch & Alarm System SSAS : Ship Security Alert System LRIT : Long Range Identification and Tracking Automatic Detection of UFO

Automatic Detection of 2 Sequential Evacuation Scenario B. Stage II : Defense Automatic Detection of UFO Active Defense 1 : LRAD(Long Range Acoustic Device), Water Cannon, Laser, Steam Rail, Water Jet Spray Sweep the pirate and delay of approaching time Control at W/H & wing with CCTV

2 Sequential Evacuation Scenario C. Stage III : Blockade Fasten of Accommodation, E/R, S/G room doors & hatches - Entrance / Control / other important room(including store) - To prevent hijacking and protect of LQ Blockade staff - Steering Gear Room : 1P - Engine room locking : 2P - Accommodation locking : 1st evacuation crew

2 Sequential Evacuation Scenario D. Stage IV : 1st Evacuation COT, LNGC & Container vessel without Dummy container Fasten of LQ entrance door  fasten of LQ inside E/R Door  Evacuate to the Citadel  Fasten of Citadel door  Check of emergency equipment  Communication with W/H & outside Single island container vessel with Dummy container (As a citadel) Fasten of LQ entrance door & E/R Door  Evacuate through passage way(Dummy container)  Fasten of Citadel door  Check of emergency equipment  Communication with W/H & outside E. Stage V : 2nd Evacuation (Citadel or container) Evacuation of remain crew and fasten of Citadel Check the Piracy through CCTV and communicate with outside (Coast guard or Navy)

3 Anti-Piracy System ※ Location of Citadel each ship type Twin Island Container Vessel (Large ~ Ultra Large Size) Protection Area Citadel Single Island Container Vessel (Small ~ Medium Size) and COT, LNG, etc Protection Area Citadel Or Citadel(container)

3 Anti-Piracy System Crude Oil Tanker / Shuttle Tanker LNG Carrier Secondary Area Citadel LNG Carrier Secondary Area Citadel

3 Anti-Piracy System 1. General Introduction The System is including Early detection system, Fast warning & Rescue signal release and active defense system as well as Anti-pirate construction with Closed deckhouse and No sunken deck. RADAR Early Detection High performance radar Motion detection CCTV Hull structure No Sunken Deck Enhanced Accommodation Enclosed deckhouse, door locking PA system Fast internal warning Active defense LRAD, Water cannon, Laser MF/HF or VHF and Inmarsat-C Fast warning & rescue signal

3 Anti-Piracy System 2. Early detection and pre-warning system : Early detection of suspected targets to be the first line of defense Under developing 1-1) High performance RADAR scanner : To detect small and fast multi-targets in long range 1-2) Multi-Tracking and motion detection CCTV : To analyze the suspected targets and to transfer real time image to shore

1 Anti-Piracy System 2) Internal warning and external rescue signal release : Most effective way to avoid pirate attacks PA speaker 2-1) Internal warning : Through PA system MF/HF/ VHF/Sat-C 2-2) External rescue signal release : Through GMDSS(MF/HF, VHF DSC or Sat-C) system

3 Anti-Piracy System 3. Active defense system 1) LRAD (Long Range Acoustic Device) : To deter and delay by high decibel and automatic targeting and remote control 2) Water cannon : To deter and delay by high water pressure and remote control 3) Laser : To deter and delay by a high-powered laser beam designed to disorient and temporarily blind

3 Anti-Piracy System 4) Steam Rail: To deter and delay by spreading of hot steam via spray nozzle to Prevent aboard of piracy Piracy 5) Water jet Spray : To deter and delay by making hull surface smooth and vision interception to make embarkation of pirate difficult

Fire Main or Fire Hydrant 3 Anti-Piracy System ※ Water Cannon General Lay-out Abt. 60M Fire Main or Fire Hydrant LOA 250m ~ 270m Crude Oil Tanker : 9ea of water cannon Aft mooring deck : dedicated water cannon 1ea

3 Anti-Piracy System ※ Steam Rail General Lay-out Steam Boiler or Economizer in Engine room F.W Tank Steam spray area Spray steam at embarkation area / 2 area simultaneously - expectation temp : min 140℃ (6bar) Segregate spraying area considering steam consumption - A-max COT : 16 block Using of steam generate from Engine room boiler / Economizer - Considering the open circuit : check the Boiler, Economizer performance Control : Control panel connected with valve remote control system at W/H

3 Anti-Piracy System 4. Stronghold Deckhouse Anti-pirate construction and facilities for deckhouse and ER space shall be designed/constructed to protect or delay for deckhouse and ER space trespass by non-authorized persons or armed pirates. Facilities : - Enclosed traffic way in deckhouse - Anti-grappling arrangement on deckhouse outside platform. - Steel structured lobby and steel doors with lockable crossbar at entrance - Steel cover on easy accessible windows and safety film on all windows. Anti-grappling facility Window safety film Window steel cover Steel door with crossbar Enclosed traffic

5. Refuge Space(citadel) 3 Anti-Piracy System 5. Refuge Space(citadel) The hidden refuge space (citadel) shall be provided for refuge of crew members during the pirates trespass in vessel. In the refuge space shall be fitted with storage of rations and first aid kits. Facilities : 1) Protection facilities - Sound insulation for inside sound reduction - Steel Door with Additional locking (Bar Type) - Double steel door with lobby. 2) Crew facilities - One(1) public toilet - Shelf for first aid kits, rations, water and etc such as crew survival - Portable fire extinguisher - VHF telephone, I-sat telephone - GPS, SSAS push button - Emergency lighting, UPS - Overriding ER emergency stop & quick closing valves