Aging Systems Task Force

Slides:



Advertisements
Similar presentations
Introduction to the Concept of Continuing Airworthiness
Advertisements

EASA operational support to engineering tasks (i.a. processing of STCs) Vincent De Vroey 4 th EASA-Industry Meeting.
Presented by Stephen Slotte FAA Transport Standards Staff
Research and Educational Networking Information Analysis and Sharing Center (REN-ISAC) Mark S. Bruhn, Interim Director University Copyright.
National Transportation Safety Board Robert L. Swaim Systems Engineering National Resources Specialist Speaking at the Aviation Wire and Inert Gas Generator.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Potential Electrical Problems Tennant replaces lighting fittings on their own Tennant adds lighting point Tennant adds socket outlet point Tennant removes.
“Standard for Electrical Safety in the Workplace”
1 Status of ATSRAC presented to White House Wire System Safety Interagency Working Group Meeting Kent V. Hollinger September 11, 2001.
Office of Aviation Safety Bob Swaim Airworthiness ABX Air Ground Fire.
1 EXPERIENCE AND RELIABILITY. 2 Short circuit loop measurements EN EN
TCCA Aircraft Certification
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
China Compulsory Product Certification System- CCC Mark.
1 29 CFR THE CONTROL OF HAZARDOUS ENERGY.
ELECTRICAL HAZARDS Electricity is an essential of modern life Some work directly with electricity (Engineers, circuit assemblers) Some work indirectly.
International Aircraft Materials and Fire Test Working Group Contamination/Aging Task Group Contamination Daniel Slaton Boeing Commercial Airplanes Material.
HWG-10 Presentation to the FAA Aging Aircraft Workshop Presentation By: Jon Haag Chairman of HWG-10.
Aging Aircraft - Systems & Wiring - General 1 SEE5a /01 Nov 01 Aging Aircraft Program Systems & Wiring Presented by René SAVOIE Task 2 Working.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
ATSRAC Task 9 Harmonization Working Group FAA PMI Workshop Seattle November 6, 2001 Presented by Tony Harbottle Airbus.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
System Wiring Policy Greg Dunn FAA, Transport Airplane Directorate, Airplane & Flight Crew Interface Seattle, Washington November 6, 2001.
Presented to: Transport Airplane Metallic and Composite Structures Working Group and Airworthiness Authorities By: Walt Sippel and Mike Gruber Date: Sept.
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
System Wiring Policy Greg Dunn FAA, Transport Airplane Directorate, Airplane & Flight Crew Interface Seattle Washington.
Managing Rotorcraft Safety During Frequently Performed Unique Missions September 28, 2005 AHS International Helicopter Safety Symposium 2005 Philip G.
1 Common Standard Wiring Practices Documents ATSRAC Task 7 Working Group presented by Don Andersen HWG7 Co-chairman.
ATSRAC Task 9 Draft EZAP NPRM and Advisory Circular Presented by: Randy M. Boren Northwest Airlines Chair, ATSRAC T9HWG.
Division of Risk Management State of Florida Loss Prevention Program.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Enhanced Airworthiness Program for Airplane Systems (EAPAS) Presented by: Massoud Sadeghi FAA - Aging Systems Program Manager EAPAS Workshop November 2002.
WAEA Single Focus Workshop – Atlanta, February 17/18, 2000 A/C manufacturer initiative for Seat/IFE Integration Improvement Page 1 AIRCRAFT MANUFACTURER.
Lorenda Ward Investigator-in-Charge
Improvement of Maintenance Criteria - Task 3 1 Improvement of Maintenance Criteria ATSRAC Task 3 presented by T J Harbottle Task 3 Working Group Chairman.
ATSRAC TASK 6 W IRE S YSTEMS H ARMONIZATION W ORKING G ROUP.
1 ATSRAC Overview presented to EAPAS Workshop for FAA Inspectors/Engineers Kent V. Hollinger November 5, 2002.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
The definition of the Earth system or grounding: the electric connection between the work of intentionally electrical device or network devices on the.
Safety and Health Program Don Ebert- Risk Manager (509)
Boeing Support of the Aging Systems Initiative Don Andersen Regulatory and Industry Support Boeing Commercial Aviation Services.
Potential for Global Harmonization of EV Charging
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Task Force 3: Electrolyte leakage
Task Force 3: Electrolyte leakage
ACCEPTANCE PROCEDURE FOR ALL SHIPMENTS
Mild Environment Qualification and Maintenance
PRC Implementation Plan and Summary of Devices
Proactive Incident Reporting
Installation of Non-Required Equipment
NHTSA-ODI-CFR Review with TTMA July 28, 2016
LECTURE 5.
From AS :   Part 4— Commissioning, operation and asset management
Buy all of your electricity and magnetism needs here!
HSE Observation Program – Data Presentation.
Service Array Assessment and Planning Purposes
Tracey Johnson Service Engineering Boeing Commercial Aviation Services
Click anywhere to get started…
Electricity Module 13.
Electrical Construction and Maintenance Program School of Engineering Technology Fall 2016 Assessment Report Curriculum Coordinator: Michael Spearance.
In-service inspection
Development of the 1997 Agreement Rule 1 and Rule 2 for PTI
Education and Training Statistics Working Group, May 2011
Workshop commissioning Installation Coordination at ESS
Task Force on Small and Medium Sized Enterprise Data (SMED)
SAFETY PERFORMANCE TARGETS
CLEPA comments on OBD II GTR 18 Draft
January ̶ September 2017 Electrical Safety Review
Presentation transcript:

Aging Systems Task Force Report for Tasks 1 and 2 - Non-Intrusive Inspection & Service History Review ATSRAC Meeting, January 19, 2000 Randy Pope, Chairman, Aging Systems Task Force ATSRAC January 19, 2000

ASTF Report Results - Non-Intrusive Inspections Work Group - Airframer/FAA/Airlines 82 A/C inspected (8 types) Common reporting form for type/quantity of findings. Agreed on three finding categories/action plans Agreed on format for Working Group Summary Report (Sept. 99) Eight W.G. summaries received ATSRAC January 19, 2000

ASTF Report The intent of the survey of a portion of the fleet using non-intrusive methods was to assess the overall condition of the fleet with regard to wiring, and to identify any airplane model-unique areas of concern. ATSRAC January 19, 2000

ASTF Report For the purposes of this report, and unless specified otherwise, the term wiring will be used to indicate the installation of wires, connectors, clamps, contacts, tie wraps, etc. The term wiring does not refer to individual electrical system components, conduits or circuit protective devices, examination of which is not within the scope of this program ATSRAC January 19, 2000

ASTF Report Findings - Categories and Action Plans 1) Airworthiness Issue - Initiate ATA Spec 111 (Airworthiness concern process - FAA/ATA/Lead airline) 2) Significant Item - Airframer will initiate action and/or investigation 3) Discrepancy - Fix by operator ATSRAC January 19, 2000

No immediate Airworthiness concerns reported. ASTF Report No immediate Airworthiness concerns reported. ATSRAC January 19, 2000

ASTF Report Significant Item Definition A defect, which may require design changes or notification for enhanced inspection, based on: potential hazard (e.g. fire, bundle damage, essential system damage), or Frequency of occurrence at a specific location ATSRAC January 19, 2000

ASTF Report Findings Summary ATSRAC January 19, 2000

Findings Summary - continued ASTF REPORT Findings Summary - continued ATSRAC January 19, 2000 p-f = pax to freighter *S/B upgrades - Cat A only

ASTF Report Future Activities Ad Review Coordinate with OEMs for Significant items and possible SB upgrades Improve consistency in working group reports Encourage Spec. 117 use ATSRAC January 19, 2000