recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA

Slides:



Advertisements
Similar presentations
RF Development for ESS at Uppsala University
Advertisements

ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
ESS – SPL Collaboration Meeting Infrastructure at ESS Report on WP3 J. Eguia, Fundación TEKNIKER ESS – SPL, Lund, 1st of July 2010.
Requirements Structure and Status for NCFE
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
H. Danared | Sw/Fr Coordination Committee | Page 1 Swedish/French Coordination Committee Håkan Danared Saclay, 13 January 2015.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
TIARA PP TIARA Final Meeting 27 th November 2013 – Daresbury TIARA-PP WP 9 : TIHPAC TIARA-PP WP 9 : TIHPAC Test Infrastructure for High Power Accelerator.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
ESS The INFN in-kind contribution to the accelerator of the European Spallation Source.
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
ESS WP4 Strategy for series production ESS TAC10 – 5th to 6th November Lund Sébastien Bousson WP 4 leader.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Status of the French-Swedish Cooperation Agreement 10 th Oct, 2012 Christine Darve.
AMICI WP1 – Management, coordination and dissemination
FREIA Division for Accelerator and Instrumentation Development
AMICI WP5.2: Harmonization - Material and Component Reference
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Plans towards CC in the LHC a US – centric perspective
WP5 Elliptical cavities
Proton Driver Initiatives
T5.2: Harmonization - Material and Component Reference
Uppsala Commitment to ESS and FREIA Planning
WG-1 Session Cavity Performance Cryomodule Performance
Accelerator Research and Innovation for European Science and Society
Hosting Orsay Walid KAABI
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
ESS RF Development at Uppsala University
Cryogenic C&C Scope of work
Teleconference ACS – FREIA 20th February 2018
HIE-LINAC status report
Olivier Napoly, coordinator CEA/Irfu
AMICI WP1 – Management, coordination and dissemination
INFN and the ILC S. Bertolucci, INFN.
Cryomodules Challenges for PERLE
Status of the CNRS Contribution to the ESS Accelerator
WP11: CDS-SL CDR Overview
CNRS contribution to ESS – 01/02/17
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Teleconference ACS – FREIA 19th June 2017
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
Status of the ESS High Power RF Systems
RF introduction Anders Sunesson RF group leader
Roger Ruber for the FREIA team 11 June 2013, Uppsala
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA Orsay 06/05/2014 (updated Feb. 6th, 2015) ACS, Orsay 06/05/2014 Tomas JUNQUERA

installation at IncubAlliance : beginning of 2010 History: creation of ACS : July 17 2009 installation at IncubAlliance : beginning of 2010 Cooperation agreement with CNRS - Univ. Paris Sud Orsay: April 8 2011 CNRS agreement for Scientific associates in the board of ACS: April 8 2011 Our expertise: General accelerators and cryogenics systems conceptual studies SC cavities and ancillary equipment design (e.m. and thermo-mechanical) Cryogenic systems detailed studies (thermal and mechanical) Engineering FE studies (structural, EM, RF) Prototyping (follow-up, controls, tests, …) First contracts: CIEMAT Madrid ESS Bilbao GANIL Caen EU-FP7 (MAX) (more …) ACS, Orsay 06/05/2014 Tomas JUNQUERA

Technofusion Facility Contracts 2010 - 2011 Feasibility Study of a Multi-ion Cyclotron for the Technofusion Facility Technical Support for the establishment of Technical Specifications for the TechnoFusion Facility Cyclotron study ACS, Orsay 06/05/2014 Tomas JUNQUERA

for the study and construction of the first cryomodule Contracts 2010 Technical Support contract with the ESS-Bilbao laboratory for the study and construction of the first cryomodule ACS, Orsay 06/05/2014 Tomas JUNQUERA

Design of 352 MHz Double-Spoke Resonator (DSR) Contracts 2011- 2012 Design of 352 MHz Double-Spoke Resonator (DSR) prototypes Call for Tenders: September 2011 Contract Signature: December 2011 Kick off meeting: Bilbao 19/12/2011 Duration : 6 months Electromagnetic and mechanical design. Specifications of Niobium material Proposals for prototyping and new test facility ACS, Orsay 06/05/2014 Tomas JUNQUERA

MYRRHA Accelerator eXperiment, research and development program (MAX) Contracts 2011 MYRRHA Accelerator eXperiment, research and development program (MAX) Projet Leader: CNRS (IN2P3) Jean Luc Biarrotte Participants: 11 partners (laboratories and industry) Project kick-off: 01/02/2011 Project duration: 36 months Total Budget : 4 869 000 € EU Contribution : 2 926 000 € ACS, Orsay 06/05/2014 Tomas JUNQUERA

MYRRHA Accelerator eXperiment, research and development programme Contracts 2011 ACS Activities: WP4 (Task 4.1): Analysis of the optimal temperature of the MYRRHA superconducting linac (report: 1/02/2012) WP4 (Task 4.2): Reliability model of an existing accelerator. WP4 (Task 4.4): Preliminary reliability study of the MYRRHA accelerator WP1 (Task 1.3): Preliminary buildings and infrastructures definition → Contributions to Reports in 2013 ACS, Orsay 06/05/2014 Tomas JUNQUERA

Technical Support to the MYRRHA project Contracts 2012 Technical Support to the MYRRHA project (SCK CEN, Mol, Belgium) Preliminary study of the MYRRHA Linac cryogenic systems. Buildings interfaces and installation, cryofluids distribution. Contract signature: 04/2012 Deliverables: 2012 Followed by new contract in 2014: costs and planning studies and preparation of technical reviews ACS, Orsay 06/05/2014 Tomas JUNQUERA

Preliminary LINAC Tunnel Dimensions Preliminary design of MYRRHA Cryogenic distribution, buildings and tunnel 240 m Preliminary LINAC Tunnel Dimensions ACS, Orsay 06/05/2014 Tomas JUNQUERA

Superconducting Cavities, Contract: Sept 2012:University of Uppsala FREIA facility: Design of a Test Cryostat and associated cryogenic systems FREIA facility (cryostat bunker) Test of High Intensity Linear Accelerators components: Superconducting Cavities, RF couplers, RF amplifiers complete cryomodules, Test of spoke cryomodules for the European Spallation Source, to be constructed in Lund, Sweden) will be tested in a final configuration, prior to be installed into the final accelerator ACS, Orsay 06/05/2014 Tomas JUNQUERA

Contract (2013-2014): construction follow up and commissioning Contract (2012-2013): detailed study and preparation of call for tenders Contract (2013-2014): construction follow up and commissioning 2K Tank cooldown 4K mode JT coupler cavity 4K Tank SHe 5K He 250K HXa HXb ACS, Orsay 06/05/2014 Tomas JUNQUERA

Construction contractor Magnetic shield at MecaMagnetics, 16/04/2014 Vacuum test at Sominex, 24/03/2014 Controls and instrumentation Isii-Tech, 22/04/2014 Installation at Uppsala University: August – November 2014 Commissioning tests : December 2014 – January 2015 ACS, Orsay 06/05/2014 Tomas JUNQUERA

Electromagnetic analysis Call No F4E-OFC-433 December 2012 INTEGRATION DESIGN OF DIAGNOSTICS INTO ITER PORTS framework contract (attributed to IDOM Spain in January 2014) 4 years – 4 specific contracts Instituto Fusion Nuclear (Spain) Nuclear analysis Electromagnetic analysis Activity started in Sept. 2014 Culham Centre for Fusion Energy (UK) Remote Handling ACS, Orsay 06/05/2014 Tomas JUNQUERA