recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA Orsay 06/05/2014 (updated Feb. 6th, 2015) ACS, Orsay 06/05/2014 Tomas JUNQUERA
installation at IncubAlliance : beginning of 2010 History: creation of ACS : July 17 2009 installation at IncubAlliance : beginning of 2010 Cooperation agreement with CNRS - Univ. Paris Sud Orsay: April 8 2011 CNRS agreement for Scientific associates in the board of ACS: April 8 2011 Our expertise: General accelerators and cryogenics systems conceptual studies SC cavities and ancillary equipment design (e.m. and thermo-mechanical) Cryogenic systems detailed studies (thermal and mechanical) Engineering FE studies (structural, EM, RF) Prototyping (follow-up, controls, tests, …) First contracts: CIEMAT Madrid ESS Bilbao GANIL Caen EU-FP7 (MAX) (more …) ACS, Orsay 06/05/2014 Tomas JUNQUERA
Technofusion Facility Contracts 2010 - 2011 Feasibility Study of a Multi-ion Cyclotron for the Technofusion Facility Technical Support for the establishment of Technical Specifications for the TechnoFusion Facility Cyclotron study ACS, Orsay 06/05/2014 Tomas JUNQUERA
for the study and construction of the first cryomodule Contracts 2010 Technical Support contract with the ESS-Bilbao laboratory for the study and construction of the first cryomodule ACS, Orsay 06/05/2014 Tomas JUNQUERA
Design of 352 MHz Double-Spoke Resonator (DSR) Contracts 2011- 2012 Design of 352 MHz Double-Spoke Resonator (DSR) prototypes Call for Tenders: September 2011 Contract Signature: December 2011 Kick off meeting: Bilbao 19/12/2011 Duration : 6 months Electromagnetic and mechanical design. Specifications of Niobium material Proposals for prototyping and new test facility ACS, Orsay 06/05/2014 Tomas JUNQUERA
MYRRHA Accelerator eXperiment, research and development program (MAX) Contracts 2011 MYRRHA Accelerator eXperiment, research and development program (MAX) Projet Leader: CNRS (IN2P3) Jean Luc Biarrotte Participants: 11 partners (laboratories and industry) Project kick-off: 01/02/2011 Project duration: 36 months Total Budget : 4 869 000 € EU Contribution : 2 926 000 € ACS, Orsay 06/05/2014 Tomas JUNQUERA
MYRRHA Accelerator eXperiment, research and development programme Contracts 2011 ACS Activities: WP4 (Task 4.1): Analysis of the optimal temperature of the MYRRHA superconducting linac (report: 1/02/2012) WP4 (Task 4.2): Reliability model of an existing accelerator. WP4 (Task 4.4): Preliminary reliability study of the MYRRHA accelerator WP1 (Task 1.3): Preliminary buildings and infrastructures definition → Contributions to Reports in 2013 ACS, Orsay 06/05/2014 Tomas JUNQUERA
Technical Support to the MYRRHA project Contracts 2012 Technical Support to the MYRRHA project (SCK CEN, Mol, Belgium) Preliminary study of the MYRRHA Linac cryogenic systems. Buildings interfaces and installation, cryofluids distribution. Contract signature: 04/2012 Deliverables: 2012 Followed by new contract in 2014: costs and planning studies and preparation of technical reviews ACS, Orsay 06/05/2014 Tomas JUNQUERA
Preliminary LINAC Tunnel Dimensions Preliminary design of MYRRHA Cryogenic distribution, buildings and tunnel 240 m Preliminary LINAC Tunnel Dimensions ACS, Orsay 06/05/2014 Tomas JUNQUERA
Superconducting Cavities, Contract: Sept 2012:University of Uppsala FREIA facility: Design of a Test Cryostat and associated cryogenic systems FREIA facility (cryostat bunker) Test of High Intensity Linear Accelerators components: Superconducting Cavities, RF couplers, RF amplifiers complete cryomodules, Test of spoke cryomodules for the European Spallation Source, to be constructed in Lund, Sweden) will be tested in a final configuration, prior to be installed into the final accelerator ACS, Orsay 06/05/2014 Tomas JUNQUERA
Contract (2013-2014): construction follow up and commissioning Contract (2012-2013): detailed study and preparation of call for tenders Contract (2013-2014): construction follow up and commissioning 2K Tank cooldown 4K mode JT coupler cavity 4K Tank SHe 5K He 250K HXa HXb ACS, Orsay 06/05/2014 Tomas JUNQUERA
Construction contractor Magnetic shield at MecaMagnetics, 16/04/2014 Vacuum test at Sominex, 24/03/2014 Controls and instrumentation Isii-Tech, 22/04/2014 Installation at Uppsala University: August – November 2014 Commissioning tests : December 2014 – January 2015 ACS, Orsay 06/05/2014 Tomas JUNQUERA
Electromagnetic analysis Call No F4E-OFC-433 December 2012 INTEGRATION DESIGN OF DIAGNOSTICS INTO ITER PORTS framework contract (attributed to IDOM Spain in January 2014) 4 years – 4 specific contracts Instituto Fusion Nuclear (Spain) Nuclear analysis Electromagnetic analysis Activity started in Sept. 2014 Culham Centre for Fusion Energy (UK) Remote Handling ACS, Orsay 06/05/2014 Tomas JUNQUERA