LLRF and Beam-based Longitudinal Feedback Readiness

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Ron Akre, Dayle Kotturi LCLS February 8, 2006 Linac Coherent.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Overview of the LLRF Activities at SLAC
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View.
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
Anders Sunesson RF Group ESS Accelerator Division
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
The recent history and current state of the linac control system Tom Himel Dec 1,
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
RF Control Electronics for Linacs Overview of activities at Electronics Division, BARC RF control electronics for: 1.Super-conducting Heavy Ion Linacs.
ELENA installation progress F. Butin / ELENA collaboration.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
LCLS MD Downtime William Colocho June 2014 to June 2016.
LLRF development of SSRF RF Group and Linac Group
Areal RF Station A. Vardanyan
CC LLRF SM18 test plan and BA6 infrastructure
RF acceleration and transverse damper systems
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ILC LLRF Status Ruben Carcagno, Brian Chase
352MHz Klystron Control for the 3MeV Linac test stand
LLRF Controls Outline Requirements External Interfaces Schedule Design
LLRF and feedback Outline Scope LLRF Requirements
WP02 PRR: Master Oscillator and RF Reference Distribution
Electronics requirements for special diagnostics for the XFEL
HYCOM CONSORTIUM Data and Product Servers
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Low Level RF Status Outline LLRF controls system overview
4Laser RF Diagram.
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
LLRF Control System Outline Scope Requirements Design Considerations
LCLS Injector Commissioning Dates ( )
Advanced Research Electron Accelerator Laboratory
Low Level RF Status Outline LLRF controls system overview
Linac/BC1 Commissioning P
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
LLRF Control System Outline Scope Requirements Options considered
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Design Outline Scope Requirements Options considered
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Status Outline Overview showing hardware instances
Linac Coherent Light Source (LCLS) Low Level RF System Injector Turn-on December 2006 February 8, 2006.
Beam Position & Charge Monitors LCLS Lehman Review July 11, 2007
LCLS Control System Personnel Linac & BC2 Controls progress
Injector/Linac RF Status
Presentation transcript:

LLRF and Beam-based Longitudinal Feedback Readiness Outline Overview of the system December 2006 readiness requirements Dependencies Activities to get there – past/present/future Conclusion

Overview of the system The low level RF controls system consists of RF phase and amplitude controls at these locations: Laser Gun (Klystron 20-6) L0-A, a.k.a. L0-1 (Klystron 20-7) L0-B, a.k.a. L0-2 (Klystron 20-8) L0 Transverse cavity (Klystron 20-5) L1-S (Klystron 21-1) L1-X (Klystron 21-2) L2 - (Klystrons 24-1,24-2,24-3) to control avg phase/ampl of L2 L3 Transverse cavity (Klystron 24-8) L3 - 2 sectors of klystrons, S29+S30 The feedback system consists of a VME chassis connected to LLRF IOCs via private ethernet

Dec 2006 readiness requirements RF phase and amplitude controls at these locations: Laser Gun (Klystron 20-6) L0-A, a.k.a. L0-1 (Klystron 20-7) L0-B, a.k.a. L0-2 (Klystron 20-8) L0 Transverse cavity (Klystron 20-5) L1-S (Klystron 21-1) Longitudinal beam-based feedback controls as far as BC1

Dependencies Use of current downtime to proceed with installation at LINAC Sector 0 RF hut readiness with racks, AC power, cables and water by July2006 (downtime)

Activities to get there past/present/future Five categories of hardware Low level RF chassis (in-house) Monitor chassis (in-house with COTS timing) Fast control chassis (in-house with COTS timing) Slow control chassis (in-house) Feedback control chassis (COTS products)

Low level RF chassis (in-house) What for? Low level RF distribution where EPICS is not required Where? LINAC Sector 0, the RF hut and klystron stations Status now: 119, 476, 2856, 2830.5 MHz – 16 way distributions complete Steps to complete: by Oct2005: PEP-II master phase shifter by Nov2005: IQPAU by Nov2005: 476 MHz master amplifier by Jan2006: LO chassis

RF Distribution

PEP-II master phase shifter 476 MHz master amplifier PEP-II master phase shifter

LLRF Phase Reference System 2830.5 to 2856MHz Divide by 16 Chassis

LLRF Phase Reference System 119 to 476MHz Divide by 16 Chassis

Monitor chassis (in-house with COTS timing) What for? Local RF phase/amplitude monitoring Where? Laser, gun, L0-A, L0-B, L1-S Status now: Evaluating ADCs Steps to complete: by Dec2005: evaluation of ADCs (1chan) by Mar2006: board prototype (4 chan, thermo) by May2006: final board by Sep2006: chassis (15 dual channel) by Oct2006: injector install

Fast control chassis (in-house with COTS timing) What for? Local RF phase/amplitude control Where? Laser, gun, L0-A, L0-B, L1-S Status now: board design Steps to complete: by Jan2006: board prototype by Mar2006: final board by Sep2006: chassis (6 single channel) by end of 2006 downtime: injector install

Slow control chassis (in-house) What for? Phase and amplitude control of the reference Where? Sector 20 RF hut Status now: not started Steps to complete: by Feb2006: start design by Mar2006: board prototype by May2006: final board by Sep2006: chassis (6 single channel) by Nov2006: injector install

RF crate What for? Local feedback control and timing for RF systems Where? Sector 20 RF hut Status now: testing EVR Steps to complete: evaluate number of signals and processor load to determine number of crates design and write software test with simulation and later hardware during 2006 downtime: install

Feedback control crate (COTS products) What for? beam-based longitudinal feedback Where? At sector 20, in RF hut Status now: software design Steps to complete: purchase network switch module if IOC has insufficient ports by Dec2006: software by Dec2006: installation

Conclusion The low level RF system and the global feedback system will be ready for commissioning by December 2006, based on the plan presented.