TEST PLANS for HL LHC IT STRING

Slides:



Advertisements
Similar presentations
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
Advertisements

Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CRYOGENICS AND POWERING
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Readiness of test stations for design validation Marta Bajko on behalf of the TE-MSC TF team CERN, 11 th December 2014 QXF design review, CERN.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Reuse of Babar sc.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Teleconf ACS – FREIA 28th March 2017
Task 5: High-Tc superconducting link Summary of work-package
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
HL-LHC IT STRING and Series test of SC link
Roadmap for triplet cryostats
Francois and Lau EATM 17 July 2012
Testing of SC Magnets Status - November 2010
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
Test CERN Marta Bajko CERN
The HL-LHC Circuits: Global View and Open Questions
HFM Test Station Main Cryostat
Cryostat procurement, status and plan, QA/QC
Feasibility and implication of installation of the string test in SM18 with a slope M. Bajko WP16.
EPFL-SPC, 5232 Villigen PSI, Switzerland
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Document Plan & Milestones WP7
SPS cryogenic proximity equipment and SM18 validation
the high-voltage network of CERN ToMORROW
Hollow e- lens, Cryogenic aspects
352MHz Klystron Control for the 3MeV Linac test stand
Lucio Rossi Project Leader
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
From Design to Installation courtesy R. Folch S. Atieh TS / MME
Powering from short circuit tests up to nominal
EN-ICE Technical Committee SM18 activities & projects
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Review Bloc 4 and SM18 facilities and upgrade
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

TEST PLANS for HL LHC IT STRING M Bajko 17th Nov 2015 B. Delille - TE retreat - February 2015

THE SCOPE of the HL LHC STRING MAIN GOAL The HL LHC IT STRING will be a test stand to STUDY and VALIDATE the COLLECTIVE BEHAVIOURE of the different systems of the HL LHC: magnets, magnet protection, cryogenics for magnets and superconducting link, magnet powering, vacuum, and interconnections between magnets and superconducting link, alignment, interlocks. TIMELINE The test is necessary to be performed BEFORE the series equipment will be INSTALLED in the future HL LHC machine. The HL LHC STRING test is planned for a total duration of max. 2 years while it will be operated in alternate with the HL LHC SC LINK test station using the same cryogenic installations and electrical powering systems. HL-LHC C&S Review #1 – March 2015

IT STRING COMPONENTS Cluster E Cluster D Cluster A Cluster B Cluster C Cluster F DFH + CL IR PC IR STRING DSH

TIMLINE : HL LHC STRING 2018 2019 2020 2021 2022 2023 STRING Phase1

Goal of this meeting MAJOR SERVICES needed for the HL LHC STRING In order to respect the constrains given by the TIMELINE and by the eventual major INFRASTRUCTURE UPGRADE needs todays goal is to agree on part of the test plan allowing to define the service needs. MAJOR SERVICES needed for the HL LHC STRING WATER COOLING ELECTRICAL DIUSTRIBUTION HANDELING CRYOGENICS This upgrades ( service) are part of the SM18 UPG project and is also conditioning the magnet test stand upgarde. Therefore it is mandatory to define as soon as possible and allow placing critical contrcats.

STATUS of the SERVICE UPG: water cooling The present demineralized water cooling capacity of SM18 of 48 m3/h is not sufficient to cover the needs of magnet test and therefore nr for magnet test + string. The demineralized water need was estimated based on the Test plan + 2 years operation of HL LHC STRING and an upgrade to a system capable to deliver up to of 160 m3/h was ordered. This upgrade does not imply an upgrade of the primary water system but this will be unavoidable if cryogenics upgrade is required. The demineralized water upgrade is scheduled from February to April 2016. ( 1.5 years between spec, design and installations) Primary water upgarde TO BE STUDIED at the same time as cryogenic upgrade B. Delille - TE retreat - February 2015

STATUS of the SERVICE UPG: electrical power The present distribution of the electrical power in SM18 seems to be sufficient and redundant. The detailed study on how eventually the new connections for the STRING test should be done to preserve the technical network for the most critical items should be. TO BE STUDIED in details not yet critical

STATUS of the SERVICE UPG: handling The present handling equippment does not correspond to the future needs of the test stands . At the firts stage a 16 t overhead crane will be replaced early 2016 ( 1 year betyween spec, design and installation) with a new 25 t overhead crane with capacity to handle magnets to be tested in vertical position. The ROCLA remains the handling equippment of horizontal magnets. The combination of the two 25 t overhead crane is estimated today to be useful EVENTUALLY to install the HL LHC STRING for items of a max. 10 m length and 26-27 t weight. The installation has not been studied and the items weight can vary still as the definitive design is not yet fixed ( or we do not know yet). TO BE STUDIED but not critical yet

STATUS of the SERVICE UPG: cryogenics 2020-2022 The present capacity of cooling and pumping is not sufficient for the magnet test and by consequence nor for the STRING. We did an estimate of needed capacity based on the HL LHC magnet test plan + a proposed STRING test from 2020-2022 starting from estimated consumptions associated to every single test. The outcome of this study is that: The present installations assuring the LHe supply should be increased via an additional equipment (25-35 g/s liquefying capacity) The present pumping to 1.8 K can be reorganised with existing WPUs but on the limit TO BE STUDIED critical TO BE STUDIED : already critical

Why is critical the CRYOGENICS system definition? To have the commissioning of the system in 2018-2019 the order must be placed in 2016 HL-LHC C&S Review #1 – March 2015

HL LHC STRING preliminary TEST PLAN Validation of a layout- integration Validation of installation sequence and procedures Validation of a system (of components) Validation of their collective behaviour Quench: provoked, natural, holding current, propagation, detection, protection, clic, dump, switch Cryogenics: cooling- warming speed ( Nb3Sn), heat load, recovery after quench, pressure, temperature, shielding Integration: layout, interconnections, systems around ( racks, cables trays, control cables et), total weight Powering: bus bar, connections, current leads, power distribution at warm and at cold, converters, water cooled cables Electrical integrity: splice resistance, electrical insulation Interlock: SPA , FPA, CRYO OK, POWER PERMIT ect Vacuum: leak detection, beam screen Instrumentation , DAQ systems, DB , QA, QC: specific or not to string Alignment GOALS in parallel: Develop methods, techniques Develop tooling Develop procedures 4 definition of Installations Test Operation 2 support HWC OP I propose to go trough your ideas and see what this would specifically imply for cryogenics or other services.