Operational Feedback DEX Status Jan 04

Slides:



Advertisements
Similar presentations
Application of the Benefits Analysis Tools for MRC population health studies Professor Dipak Kalra Centre for Health Informatics and Multiprofessional.
Advertisements

Slide 1 Presentation of the example business concept – DNV Exchange architecture - DNV Summary / issues from last workshop - DNV Presentation of Swedish.
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Principles of Project Management Case Study - Programme Management: Developing a Blueprint Graham Collins University College London (UCL)
Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
TENCompetence Assessment Model, Related Tools and their Evaluation Milen Petrov, Adelina Aleksieva-Petrova, Krassen Stefanov, Judith Schoonenboom, Yongwu.
1 Proposed PLCS TC Organization and Functional Responsibilities Revision
Dr Rob Bodington Eurostep
Product Life Cycle Support (PLCS) The Information Backbone to transform the Logistics Enterprise PLCSlib status PLCS OASIS TOG Filton, UK Rob.
Welcome ISO9001:2000 Foundation Workshop.
Rolls-Royce & Ministry of Defence Pilot for Early Implementation of PLCS Marine Olympus/Tyne Summary 3 Feb 04.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
1 Proposed PLCS TC Organization and Functional Responsibilities Revision
Introduction to ISO New and modified requirements.
ETICS2 All Hands Meeting VEGA GmbH INFSOM-RI Uwe Mueller-Wilm Palermo, Oct ETICS Service Management Framework Business Objectives and “Best.
1 Synchronize work on DEXs and reference data between PLCS pilots and OASIS/PLCS - Proposed PLCS TC Organization and Functional Responsibilities.
SQI © T.P. Rout and Griffith University, 1996 A Unified Reference Model for the Processes of Software and System Life Cycles Terry Rout Software Quality.
ISO edition 2 Publication plan R. Bodington Eurostep Limited ISO edition 2.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
CISB444 - Strategic Information Systems Planning Chapter 3 : Developing an IS/IT Strategy: Establishing Effective Processes Part 2.
- Sponsored by UK MOD ISO edition 2 Rob Bodington, Phil Spiby.
EVA Workshop, 26 March 2003, Florence, Italy1 COINE Cultural Objects In Networked Environments Anthi Baliou University of Macedonia,Library Thessaloniki,
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
PLCS DEXs Trine Hansen DNV 20 April Content OASIS / PLCS Organization PLCS DEXs DEX architecture Process – define and verify capabilities Way forward.
UK MoD Initiatives TLSS (Through Life Support Standard) PLCS is being used as the basis for both the Information and Activity models. This will require.
DC 15 February 2006 Exploiting Product Life-Cycle Support (PLCS) Commander Tor Arne Irgens Chief Data Model & Information Management Norwegian Defence.
Mantid Stakeholder Review Nick Draper 01/11/2007.
Diploma in Procurement & Supply Business needs in Procurement & Supply Session 1 Business Needs and Procurement Decisions.
© Nano Time Limited – October 2008 Source Planning What –Analytical process that for creating procurement and supply strategies for key categories Wh y.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
The common structure and ISO 9001:2015 additions
DEX 7 – Operational Feedback Business Need Introduction This exchange enables the transmission of information on the condition and usage of a supported.
1 ILE Project Integrated Logistics Environment Kickoff Meeting NPDI Project & SCIM Summary & Status Presented by: Rick Lobsitz (NGTS)
Recommendations from PLCS TOG Meeting Filton, UK Aug 2011.
DEX Publication Project OASIS PLCS TC Face to Face meeting 10 March 2008 Trine Hansen.
Synchronize work on DEXs and reference data between PLCS pilots and OASIS/PLCS - Background, Lessons learned, Conclusions, Recommendations, Plan forward.
1 Industry Specifications and their importance in Product Lifecycle Management (Dr Michael Day & Deborah Jane Ham) (September-2012)
Slide 1 Copyright, Norwegian Defence Logistics Organization PLCS staging area Support for data exchange Jochen Haenisch
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Diploma in Procurement & Supply
OSLC PLM Reference model February Summary of the OSLC PLM Reference Model V0.2 February 22 nd 2011 Gray Bachelor Mike Loeffler OSLC PLM Workgroup.
International User Group Information Delivery Manuals: Exchange Requirements Courtesy:This presentation is based on material provided by AEC3. Contact.
Discussion Topics for Exploring OMG UPDM Way-ahead
Make-to-Stock Scenario Overview
Agenda – Morning Session
ISO/IEC
support task records, including product data collected by the task;
PLCS - Delivering the Promise
Status DEX Publication Project
It’s not all about the tool!
Make-to-Stock Scenario Overview
Integrating Asset Registers
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Z26 Project Management The Effectiveness of Workshops Graham Collins University College London (UCL)
DoD PLCS Meeting Arlington, USA 15 February 2006
Engineering Processes
Principles of Project Management Case Study - Programme Management: Developing a Blueprint Graham Collins University College London (UCL)
Alignment of COBIT to Botswana IT Audit Methodology
Integrating Asset Registers
LO2 - Be Able to Design IT Systems to Meet Business Needs
Definition of Project and Project Cycle
X-DIS/XBRL Phase 2 Kick-Off
Rob Bodington, Phil Spiby
AICT5 – eProject Project Planning for ICT
Business Process Management and Semantic Technologies
FrAmework for Multi-agency Environments
Proposed PLCS TC Organization
Introduction to Project Management
UIG Task Force Progress Report
Presentation transcript:

Operational Feedback DEX Status Jan 04 Mike Newton MOD

Operational Feedback Capabilities The UK MoD has funded the development of the following 11 core DEX 007 capabilities which are complete to level 1 C047 Product_change C068 Referencing_product_as_realized_configuration C032 Representing_activity C048 Representing_condition_evaluated C044 Representing _environment_actual C043 Representing_ environment_typical C049 Representing_product_location C041 Representing_state_observed C064 Representing_work_done C065 Representing_work_order C066 Representing_work_request . As reported in London the capabilities shown are complete to level 1 but they still require: a peer review of all capabilities. · and the development of business reference data; Since London we have had the joint modellers meeting which took the development of a number of capabilities forward and we were briefed on the detail at the 21 Jan conference call - Additional work is now required in order to further develop DEX 007 to a point were it is suitable for implementation. To this end the MOD have recently funded Rob Bodington to carry out a package of work that will take DEX 7 forward and this will inevitably mean there will be a good spin off for other DEXs .

Additional Work Contracted by MOD in Support of DEX 7 Ensure that all capabilities required by DEX 007 are completed and accepted (including those required by DEX 007 but yet to be allocated or completed by other teams). Generate and validate the long form EXPRESS for DEX 007 Develop Business reference data for DEX 007 Test DEX 007 Populate the DEX with example test data Investigate the RDL infrastructure The work we have tasked Rob with can be covered under the following bullets Bullet 1. This involves Review Work (review and correct)on some 15 Capabilities, the fixing of some 4 capabilities (developed by non-modellers) and taking responsibility for a further 8 capabilities that have been identified but not yet developed (TAF). Bullets 2 &3. Self explanatory Bullet 4. This might well involve extending the bike test set as required to cover the needs of DEX 7 - but in turn an extended data set will clearly benefit other DEX teams. Rob will also investigate the procurement of real data for testing purposes and establish the requirements (for using it for test purposes). Bullet 6. This work will include; investigating the use of OWL for representing the RDL Investigating the publicly available tools (Protégé and JENA) that can be used for the creation and management of the RDL Developing a POC demonstrator illustrating how the RDL can be created / managed/accessed. The target date for all of the above is 31 Mar 04 Additionally it is important to ensure that ISO 10303/239 achieves formal publication and we have set aside some funding to cover this contingency. But this is not just a MOD issue and it is hoped that their will be support for this by all the organisations represented here.

Issues The sharing of software tools The management of the development of capabilities now that modellers work often spans many DEXs. Input from Rob Bullet 1. We intend to put the tool being developed by Rob (to automate the process of generating a long form) onto Dexlib. Are all other organisations doing the same? Bullet 2. The MOD are funding the development of 8 capabilities that are with other DEX teams?

MOD Early Implementations UMMS - Single interface from a Work Package Management System to several dockyards SDD / VMP Configuration Management interface CTS - Logistics Proof of Concept WSA Enterprise Application Integration pilot LSC is leading on the development all MOD Early Implementations and Nigel will give a detailed brief. But a quick overview of implementations being sponsored by the MOD are: Bullet 1 Unit Maintenance Management System. A new system was needed to interface with 3 different shoreside IT systems (Dev /Ports/Clyde). In order to prevent the development of 3 separate interfaces it was decided to export data in PLCS format. For Devonport Naval Base, the preparatory mapping work is complete and the system is due to go live any time now. UMMS was the core for DEX 4 and 9 development and the MOD have recently let a contract for implementation guides to be produced. Bullet 2 Sm Definition Data Base (ex MRC) / Vessel Material Planning. There was an existing interface between the two systems which has been successfully mapped to PLCS. The WSA have now committed to implementing a PLCS based replacement utilising DEX 8 (Product as Individual). No timescale. Bullet 3 The aim of the POC is to use PLCS to exploit engineering asset management and supply systems to extract extract management information through the use of a Data Warehouse and a collaborative working environment. The preliminary governence work (business case etc) is almost complete and work will commence in Apr 04 and will hopefully be complete by end of year. Bullet 4 The WSA Enterprise Application Integration pilot is similar to the POC and will essentially extract data from 5 systems: CRISP (RN logistics), SSDD (Config Management), UMMMS (RN WM) ,PEPS (DML WM), SSCWE (Su Sh CWE). No time scale available.

Summary Review / Completion of all capabilities required by DEX 7. Level 2 / 3 completion of DEX 007 including The development of initial business reference data for DEX 007 The testing of DEX 007 through extension of existing PLCS test data suite “Bike data” to cover scope of DEX 007 Produce a proof of concept demonstrator showing how the RDL can be created, managed and accessed by applications Provision of support to enable publication of ISO 10303/239 Presentation on requirements for publishing a DEX as an OASIS standard Extension of DEXlib to incorporate XML Schema (Part 28) view of the DEX Providing we do not encounter unforeseen difficulties funding is in place to complete the following work with a target date of 31 Mar 04.