Problem 2: Moe Rd/Route 146 Intersection

Slides:



Advertisements
Similar presentations
PEDESTRIANS Osama Tabash Khaled El-Yazory Dr. Essam Almasri
Advertisements

Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
CE 2710: Transportation Engineering Traffic Signals April 3, 2009 Nicholas Lownes, Ph.D.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Lec 16, Ch16, pp : Intersection delay (Objectives)
Transportation Engineering
INTRODUCTION TO TRANSPORT Lecture 3 Introduction to Transport Lecture 4: Traffic Signal.
City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road.
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
Case Study 4 New York State Alternate Route 7. Key Issues to Explore: Capacity of the mainline sections of NYS-7 Adequacy of the weaving sections Performance.
Chapter 221 Chapter 22: Fundamentals of Signal Timing: Actuated Signals Explain terms related to actuated signals Explain why and where actuated signals.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
INTRODUCTION TO TRANSPORT Lecture 4 Introduction to Transport Lecture 4: Signal Timing.
CTC-340 Signals - Basics. Terms & Definitions (review) Cycle - Cycle Length - Interval -. change interval - clearance interval- change + clearance = Yi.
Lec 15, Ch.8, pp : Signal Timing (Objective)
Introduction to Transport
PASSER II SOFTWARE.
Signals. Laneage Coding Examples.
Traffic Signal Warrants
Chapter 17: Basic principles of intersection signalization (objectives) Chapter objectives: By the end of this chapter the student will be able to: Explain.
CEE – Spring 2005 Lectures 10 to 11 (Chapters 21, 22) Analysis of Signalized Intersections.
Signalized Intersections
Transportation Engineering
Transportation Engineering
CEE 320 Fall 2008 Course Logistics HW7 due today (9 total) Midterm next Friday (Wednesday review) Signalized Intersections (Chapter 7 of text) Last material.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
INTERSECTION SAFETY PERFORMANCE AND AUDIT Andy Loonan Basak Aldemir-Bektas Intersection: Welch Avenue & Lincoln Way.
Alternative Solution ONE Changes Phases from 4 to 6 based on the traffic demand of different movements; Optimizes Timing accordingly to minimize the overall.
Ralston & El Camino lane reassignment proposal John Boykin , The Belmont traffic safety commission considered a proposal to reassign.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Chapter 20: Actuated Signal Control and Detection
Introduction to Transport
Park & Kevin LANE USE FACTOR ESTIMATION FOR INTERSECTIONS WITH LANE DROP.
Traffic Signal Timing Design Part I. Slide 2 Steps in Designing a Traffic Signal Timing Plan (1/2) 1. Determine lane configurations and lane volumes 2.
Traffic Signal Timing Design Part II. Slide 2 What to do?  Distribute volume among lanes to Identify lane utilization Determine need for lane adjustment.
Problem 4: Okeechobee Road Stopped Control Analysis.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
 Warn drivers about dangerous situations  The are for road conditions that need caution for specific hazards that may be encountered.
Problem 6: Route 146 Arterial Study We’re going to look at 7 intersections simultaneously: the Shenendehowa Campus entrance, Moe Road, Maxwell Drive, Clifton.
Signal timing CTC-340. Key Elements Development of safe and effective phase plan and sequence Determination of vehicle signal needs –Timing of yellow.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Rules of the Road. I. Traffic Lights – must be obeyed unless a police officer directs otherwise.
Case Study 4 New York State Alternate Route 7 Problem 2.
Signals, pavement markings, and proper turns QUIZ
MD 30 (Hanover Pike) at Mt. Gilead Road
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Case Study 4 New York State Alternate Route 7 Problem 4
The Simulation of Traffic Patterns and Optimizing Traffic Lights
Evaluation and Re-Design Haifa and Yafa Streets.
Traffic System Management for “Tulkarem”
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
2a. Fully actuated signal - Improved T intersection
* Topic 7 Field Operations
Signalized Intersections
Highway capacity and Level of Service Analysis
Evaluation and Analysis of Nablus Entrances
Problem 5: Interstate 87 Interchange
CE 3500 Transportation Engineering Saturation flow and signal LOS
Problem 3: Shenendehowa Campus
Case Study 1 Problem 4 Styner/Lauder Intersection Moscow, Idaho
Problem 5: Network Simulation
CE 3500 Transportation Engineering Elements of Traffic Signals
HERO UNIT Training Module
Case Study 1 Problem 2 Styner/Lauder Intersection Moscow, Idaho
Road Sign Bingo- Bell Ringer
Transportation Engineering Calculating Signal Delay February 23, 2011
Signal Design CTC-340.
Presentation transcript:

Problem 2: Moe Rd/Route 146 Intersection Analysis Plans 2a: AM Existing: pedestrian effects 2b: PM With-site: lane utilization considerations Examine issues related to pedestrians & lane utilization in addition to with-site conditions analyses.

Characteristics of Moe Rd Intersection Signalized & fully actuated EB & WB approaches are both 3 lanes wide The WB lane tapers to a single lane after the intersection NB & SB approaches are both 1 lane wide

Arrival Patterns EB traffic arrives in platoons, discharged from the upstream intersection at the entrance to the Shenendehowa campus WB traffic arrives in platoons, discharged by the Maxwell Drive intersection The platoons tend to arrive on red The NB & SB traffic arrives randomly EB & WB = Arrival Type 2 NB & SB = Arrival Type 3 What Arrival Type would be most appropriate for each approach?

Observations? Factors that should be considered for this intersection: - Pedestrians - Lane Utilization The signal phasing is shown in Exhibit 2-22. There are three phases: 1) westbound protected left; 2) east-west green with permitted lefts; and 3) north-south green with permitted lefts. Exhibit 2-23 shows some signal timing data collected on a recent weekday morning. Variations in the platoon arrivals on the eastbound and westbound approaches make the cycle length fluctuate significantly. Also, as the data show, the first phase is skipped if neither the eastbound or westbound left-turn lane is occupied. Lefts that arrive during Phase 2 can turn permissively.

Sub-problem 2a: Moe Road AM peak hour - Existing Conditions What effects do pedestrians generally have on intersection analyses and operational requirements? They usually conflict with the coincident right-turning vehicles They sometimes require insertion of an all-walk phase with no vehicular movements Consideration of them generally requires modifications to the signal timing We will start our analysis with the signal timings. The pedestrian times tend to be distributed exactly opposite to the vehicle times. For the vehicles, the largest green time is usually needed for the main street and much less time is needed for the side street. It’s the other way around for pedestrians, where the street widths dictate the green times, not the pedestrian volumes. Most often, the street that’s widest to cross is the main street. And since the pedestrians cross the main street concurrent with the side street throughs-and-rights, the side street green time is boosted considerably. Similarly, the pedestrian time requirements for the main street are often shorter than the vehicular times because the width of the side street is typically less. In an intersection where vehicular greens are 30 seconds for the main street and 10 seconds for the side street, pedestrian timings need to be quite different. The pedestrian greens might be 20 seconds for the main street (7 seconds of walk plus 13 seconds of flashing don’t walk, based on a 40-foot wide street) and 28 seconds for the side street (7 seconds of walk plus 21 seconds of flashing don’t walk, based on a 70-foot wide street). In this situation, the usual solution is to boost the vehicular signal timings so that 1) the 24-second minimum for the side street is met, and 2) the 30:10 ratio for the vehicular times still pertains. Thus, the main street green would have to be 72 seconds to satisfy the 30:10 ratio, given the 24-second green on the side street. Assuming 4 seconds for the yellow and all red, the 48-second cycle without the pedestrians (30+4+10+4) becomes a 104-second cycle with pedestrians (72+4+24+4). At Moe Road, pedestrians are important during the AM Peak hour. Students cross Route 146 going south on their way to school. Consequently, for an AM peak hour analysis, we have to take into account the pedestrians on the north-south phase. Observations? How do each of these factors affect the Moe Road intersection analysis?

Moe Road Pedestrian Considerations What are the effects of boosting the # of pedestrians to the 1700 ped/hr (HCM Max)? Almost Nothing!!! In the base case, with pedestrians included, the cycle length is 72 seconds and the delays are between 12.6 and 25.6 seconds per vehicle (dataset 15). Interestingly, even if you boost the southbound pedestrian volume crossing the west approach to the maximum limit allowed by the HCM methodology (1,700 pedestrians per hour), the delays change very little. The southbound delay increases from 19.5 seconds per vehicle to 19.6 and the northbound delay increases from 22.8 to 23.6 (dataset 16). So in this instance, the interference between the pedestrians and the vehicular traffic is not significant. The more significant story relates to what the situation would be without pedestrians. As the third run shows, the delays would drop to 12.2 seconds per vehicle overall, 33% less than the base case. The delays by movement drop from a range of 12.6-25.6 seconds per vehicle to 7.4-16.5 seconds per vehicle (dataset 17). That’s as much as a 35% difference. This happens because we can now use phase times that don’t meet the pedestrian minimums. Instead of using 8, 33, and 21 seconds for phases 1, 2, and 3 (to meet the 21-second minimum for phase 2, given the pedestrians), we can use 3, 20, and 11. How would the intersection perform if there were no pedestrians? Delays by movement drop by 12.6 – 25.6 sec/veh Make sure to account for pedestrians if they are present at an intersection!!! What has been learned?

Lane Utilization ~ 250’ from the intersection the 2 WB lanes merge into 1 What would you expect the driver tendencies to be? Many will desire to pre-position themselves in the lane that does not end (inner lane) Another issue that we can address at this intersection is lane utilization. When the lane use isn’t balanced, i.e., there isn’t equal traffic in each lane, the performance analysis needs to account for that fact. At the Moe Road intersection, this situation exists for the westbound approach. The two lanes merge into one about 250 feet downstream of the intersection (click here to see a photo). The right-hand lane ends and its traffic must merge left. This creates a tendency for drivers to use the innermost lane, especially when the flows are light to moderate. The day we collected data, 57% of the westbound traffic was in the inner lane. At other times, that number can be as high as 75%. From an HCM perspective, the lane utilization factor, fLU, is defined as the ratio of the average volume per lane to the volume in the heaviest-used lane. Therefore, if the total volume is 1,000 vehicles per hour and there are two lanes, the average volume per lane is 500 vph. If the heaviest-used lane sees 750 vehicles per hour, the lane utilization coefficient is 0.67 = 500/750. If the lane utilizations are given in percents, the lane utilization coefficient is given by the ratio of the average percentage of traffic per lane, in this case 50% divided by the maximum percentage per lane, or 75%. The day we collected data, 57% of the westbound traffic was in the inner lane, so the lane utilization coefficient on that day was 0.81 = 50%/57%. We used this value in all the analyses. At other times, we indicated that the percentage of traffic in the inner lane can reach as high as 75%. We’re going to use that value for comparison purposes. HCM lane utilization factor, fLU, is defined as the ratio of the average volume per lane to the volume in the heaviest-used lane

What are the 3 critical movements? What if you had forgotten to take account of the lane utilization factor? What would happen if you didn’t enter the correct values of 0.81 for the westbound throughs and 0.88 for the eastbound throughs? What results would you get in the second run? As the third run shows in Exhibit 2-25, the average delay would have been 20.1 seconds instead of 23.9; the eastbound through would have shown a delay of 21.4 seconds instead of 28.2. That’s a difference of 25%. The westbound through would have shown a delay of 11.7 seconds instead of 14.7, which is a difference of 20%. This demonstrates the importance of using the lane utilization factor. What if the lane utilization was actually worse than what we saw on the day we observed the traffic? What would be the intersection’s performance if the westbound lane utilization were (75%, 25%) instead of (57%, 43%)? As the fourth run shows, the answer is that the westbound delay would be 29.0 seconds instead of 18.3, (58% larger) and the average delay would be 29.5 seconds instead of 23.9 (17% larger). What are the 3 critical movements? What are the effects of uncertainty? EB thru, WB left, NB approach EB and NB approaches see a larger amount of delay

Findings and Additional Observations We’ve seen that to allow for these pedestrian times, the cycle length gets longer and the vehicular delays get larger. Pedestrian push-buttons are particularly valuable where the pedestrian volumes are light. On the cycles when the pedestrian timings aren’t invoked, the delays will be shorter and the signal will be more responsive to the vehicular flows. For lane utilization, we’ve seen what effect it can have on estimates of delays and queue lengths. We’ve seen that as the lane utilization gets poorer (i.e., more traffic in just one lane), delays and queue lengths increase. Not accounting for lane utilization, and using the defaults, can lead to overly optimistic assessments of intersection performance. In the case of pedestrians, we’ve learned a little about how pedestrian timings are defined: an initial walk time plus an increment of flashing don’t walk time that allows a person to walk across the street. We’ve learned that these pedestrian timings are often in conflict with the vehicular timings in that the longer pedestrian timings tend to be associated with the side street, which typically has the shorter vehicular green. We’ve seen that to allow for these pedestrian times, the cycle length gets longer and the vehicular delays get larger. Or to put it another way, if the pedestrians weren’t present, the cycle length could be shorter and the vehicular delays smaller. pedestrian push-buttons are particularly valuable where the pedestrian volumes are light. When pedestrian timings aren’t needed (that is, when the controller does not receive a call for pedestrian service), the vehicular-based timings can be used. That means that on those cycles when the pedestrian timings aren’t invoked, the delays will be shorter and the signal will be more responsive to the vehicular flows. Hence, pedestrian push buttons have great value. In the case of lane utilization, we’ve seen what effect it can have on estimates of delays and queue lengths. We’ve seen that as the lane utilization gets poorer (i.e., more traffic in just one lane), delays and queue lengths increase. Not accounting for lane utilization, and using the defaults, can lead to overly optimistic assessments of intersection performance.