Nuclear 1 Environmental Impact Assessment

Slides:



Advertisements
Similar presentations
TM/WSP 5-9 Nov Group D1- Nuclear fuel cycle, nuclear waste QUESTIONS / DIFFICULTIES  Why is the NPP decommissioning required / necessarily?  How.
Advertisements

Environmental Impact Assessment
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Strengthening capacities to implement the GHS in Senegal Progress report Ousmane SOW.
IAEA RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety Regional Workshop on Drafting Regulations.
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Pravin Amar Development Planners 14 July 2005, Assagay Hotel, 5pm Applicant: EnviroServ Waste Management (Pty) Ltd. Environmental Consultants Pravin Amar.
AQUACULTURE DEVELOPMENT ZONES & INLAND FRESHWATER AQUACULTURE
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
0 Tadas Matulionis Lietuvos Energija AB Strategic planning manager Minsk, December 07, 2007 Environmental Impact Assessment of a New Nuclear Power Plant.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
Arctic Marine Strategic Plan Update to the EPPR Working Group Meeting, Ottawa, Canada June 16-17, 2014.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
SEA - National plan Electricity Supply Arend Kolhoff Netherlands Commission for EIA Jordan - September 2003.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
SEA in the Czech Republic Prague, 24 September 2008.
Parliamentary Portfolio Committee Presentation Annual Report 2012.
Managing the Environmental Impacts of Power Canada Europe Roundtable for Business Toronto, 31 May 2005.
THE GOAL CONSERVE BIODIVERSITY. "Remove barriers including a systemic and institutional capacity deficit for wetland management... … needed to guide decision.
1 Integrating Biodiversity Conservation Into Impact Assessment: The Experience of Uganda BERINA UWIMBABAZI.
1 Meeting of Portfolio Committee for Minerals and Energy 25 March 2008, Cape Town Mineral and Petroleum Resources Development Amendment Bill.
Kyrgyzstan & UNFCCC. Adaptation to Climate Change: Strategies & Priorities Zukhra Abaikhanova, Center for Climate Change Workshop The 2 nd Meeting of Working.
Colleen Williams Department of Health Yorkshire and Humber Region 11 January 2008 Health in Strategic Environmental Assessment:
Strategic Environmental Assessment for the Operative Programmes Anita Gulam Ana Kovačević Ministry of Environmental and Nature Protection, Republic of.
LEARNING ABOUT THE NATIONAL ENVIRONMENTAL MANAGEMENT : WASTE ACT (NO. 59 OF 2008) A GUIDE TO MANAGING WASTE WITHIN THE LAW Presented by: Quinton Williams.
IMPLEMENTATION OF THE ONE ENVIRONMENTAL SYSTEM Portfolio Committee on Environmental Affairs Meeting of 14 February 2017 Legal, Authorisations, Compliance.
Anglo Operations (Pty) Ltd Setlabotsha Project Scoping meeting for Mining Right Application 10 November 2016 This title slide contains elements to hide.
IMPLICATIONS OF THE HIGH COURT JUDGMENT IN THE MATTER BETWEEN EARTHLIFE AFRICA JOHANNESBURG V MINISTER OF ENVIRONMENTAL AFFAIRS AND OTHERS IN RESPECT OF.
Regulation of land use and building activities
Policy workstreams Craig Mallett Miriam Eagle.
Allington Waste Management Facility
ENVIRONMENTAL IMPACT ASSESSMENT
Governmental, Legal and Regulatory Framework in Azerbaijan Republic
Legislative and Regulatory Framework
Scoping Meeting April 20th 6:00 pm
Nuclear and Treaty Law Section Office of Legal Affairs
-EL ABBARI Younes, FADIL Najib (CNESTEN) -SADIQ Younes (AMSSNuR)
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
BRIEFING OF THE PARLIAMENTARY PORTFOLIO COMMITTEE
THAILAND Training and Tutoring Feedback
MARINE SPATIAL PLANNING BILL, 2017
MADRID – BOSTON PROPOSAL PHASE 2 OF THE HOPE BAY PROJECT
Environmental assessment system in Finland
Information Seminar 04 December Venue: DEA Auditorium Sibusisiwe Hlela
SECRET INTERVENTIONS TO COMBAT ILLEGAL ACTIVITIES RELATING TO RHINO; AND RECOMMENDATIONS EMANATING FROM THE NATIONAL CONSULTATION PROCESS TO FACILITATE.
Fifth Standard Solar Project Complex
PRESENTATION OUTLINE Introduction and Background
Marc Thauront Brussels 30 June 2008.
Communication and Consultation with Interested Parties by the RB
Severn Tidal Power Feasibility Study
UK Marine Planning and the Ecosystem Based Approach
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
Plant Parameter Envelope for Early Site Permits
Member States information meeting
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
DG Environment, Nature Protection Unit (D3)
Exit Capacity Substitution and Revision
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
Assessment of EIA regime
Report to portfolio committee
Fitness Check of EU Freshwater Policy
Finalisation of study report
EUnetHTA Assembly May 2018.
REPUBLIC OF CROATIA MINISTRY OF ENVIRONMANTAL AND NATURE PROTECTION
Finalisation of study report
Presentation transcript:

Nuclear 1 Environmental Impact Assessment Deidre Herbst Eskom Environmental Manager Doc ID

Background Environmental Impact Assessments (EIA’s) became a legal requirement in South Africa in 1997. It was at this time that Eskom was progressing with plans for additional capacity. The first two EIA’s carried out were for the Ingula pumped storage scheme and the Pebble Bed Modular Reactor. These were followed by EIA’s for coal fired power stations: Medupi, Kusile, a site in the Vaal region, Steelpoort pumped storage scheme, Ankerlig and Gourikwa open cycle gas turbines. The Nuclear 1 EIA was initiated in 2006. The first public meetings and the draft scoping report were published in 2007. Environmental Authorisations were obtained for Medupi, Kusile, Ankerlig, Gourikwa within 1 – 2 years from appointing consultants.

Challenges in obtaining an Environmental Authorisation Ingula Pumped Storage Scheme is situated on the escarpment. The upper dam is situated in sensitive high altitude grasslands and impacted on an extensive wetland. The Environmental authorisation was appealed and the appeal upheld by the Minister of Environmental Affairs An application was made to the Court, the Minister reviewed his decision based on the strategic importance of new generating capacity. EA was granted in 2004 (EIA process of 6 years)

Challenges Continued Pebble Bed Modular Reactor there were two EIA processes First EIA, Environmental Authorisation received within 3 years (2000-2003) but taken on court review. Court decision determined additional stakeholder engagement was required. Design changes – new EIA required. Second EIA was never completed due to discontinuation of the project. The preferred site for PMBR was the Koeberg site.

Nuclear 1: EIA Process Eskom appointed an independent Environmental Assessment Practitioner, Arcus Gibb, to carry out the Environmental Impact Assessment (EIA) The EIA process, which commenced in 2007, has been extensive with more than 60 public interventions (public meetings, key stakeholder workshops, focus group meetings, open days) in 4 separate public comment periods. The duration of the public comment periods was more than 60 days, with 106 days for the draft impact report. (the norm is 45 days for complex EIA’s) The application is for one power station of up to 4000MW installed capacity, on one site Five sites were selected and evaluated during the scoping phase Three sites were taken forward into the Environmental Impact Assessment phase (subsequent to DEA approval to remove the Northern Cape Sites): 2018/11/13

Identified Sites

Transmission Lines associated with alternative sites 2018/11/132018/11/132018/11/132018/11/13

Thyspunt has been proposed as the preferred site.

Nuclear 1 history and potential challenges The scoping phase: 2006 to 2008 approval of final scoping report. The DEA approved the Plan of Study for EIA in January 2010 The Draft EIR was prepared and provided for public comment from 6 March 2010. The period for comment on the Draft EIR was lengthened twice, and the end of the lengthened comment period was 30 June 2010 Due to comments received during this period, the EIA team decided to revise selected specialist reports and provided a Revised Draft EIR (Version 1) for public review from 6 March to 07 August 2011

Project Challenges - New Issues from the DEA The DEA after a lengthy review process requested additional studies hence the Revised Draft EIR Version 2 was prepared Site selection methodology Biodiversity offsets Duynefontein regarded as a greenfield site Independent review of all specialist studies required Cumulative assessment considering Transmission EIA for each site Infrastructure assessment relating to each site Radiological safety assessment Design basis accidents assessment with specific reference to Fukushima The Revised Draft EIR version 2 will be made available for public comment in 2015.

Specialist Studies 1). Geology and geological risk 2). Seismological risk 3). Geotechnical suitability 4). Hydrological 5). Geo-hydrological 6). Freshwater supply 7). Air quality and climate 8). Dune geomorphology 9). Botanical 10). Freshwater ecology (wetland) 11). Terrestrial vertebrate fauna 12). Terrestrial invertebrate fauna 13). Marine biology (Revised) 14). Economic impact 15). Social impact 16). Visual impact 17). Heritage impact (Revised) 18). Agricultural impact 19). Tourism impact 20). Noise impact 21). Human health risk 22). Transportation (Revised) 23). Emergency response 24). Site control and access 25). Nuclear waste disposal 26). Integration with the transmission network 27). Estimating the 1:100 year flood line from the sea 28). Oceanographic impact assessment 29) Town planning 30) Radiological 31)Biodiversity (considering offsets)

Main Issues of Concern for the Public Technology – Gen III, Perception around safety, Radioactive waste management, Emergency planning, Roads Infrastructure, Impact on squid industry, Construction camps/ villages, Impact on Spatial Planning, Conservation Value, Agricultural impacts from radiation, Seismic design, etc Heritage Resources 2018/11/13

Concluding remarks Since Fukishima there has been an increase in the anti nuclear lobby and this is visible given the increased participation of organisations such as Greenpeace in the last rounds of public participation. While the content of the EIA is comprehensive and complete, legal challenges are often made in terms of process and not in terms of environmental impacts. Any changes in the technology envelope may result in the authorities requiring a new EIA to be initiated. Reliance is placed on the DEA to review the Final Environmental Impact Report within legislated timeframes. New appeal regulations provide legislated timelines of between 3 – 4 months. The decision can be challenged in a Court of law, this process could result in lengthy delays.

Timelines and Way Forward The following timelines are anticipated: April 2015 – avail the Draft EIR version 2 for public review May June 2015 – conduct public meetings September 2015 – submit final report to the DEA These timelines are depended on the methodology workshop to be held with the DEA in March 2015.

Thank You Thyspunt Dunes after summer rainfall 2011