10- M3200 STD PSA – 250 PSIG Daesung Korea - Job # 8297 Kamal Hatami, Product Engineer Feb 20 th, 2009.

Slides:



Advertisements
Similar presentations
BETTER SOLUTIONS KMS : PRESS Transport/Installation
Advertisements

POP 1 1 POP POP PROCESS ( ) 6. ERP INTERFACE ( ) 10. CONFIGURATION
© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
My AmeriCorps AmeriCorps and VISTA Programs Create and Manage an eGrants Account Presentation developed for the Corporation for National and Community.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Air Permitting : Process Improvement Kaizen Event June 4 – 8, 2007 Transforming Government- the challenge and opportunity of the 21st century.
Prime and Composite Numbers. These are numbers that have only two factors – themselves and one. These are numbers that have only two factors – themselves.
1 1  1 =.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Modern Systems Analyst and as a Project Manager
© Tally Solutions Pvt. Ltd. All Rights Reserved Shoper 9 License Management December 09.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Chapter 5 Product and Service Costing: Job-Order System
B2B Solutions Study Summary Charts June – September 2013.
Chapter 6: Integrated Processes
Electric Bus Management System
1 Dr. Ashraf El-Farghly SECC. 2 Level 3 focus on the organization - Best practices are gathered across the organization. - Processes are tailored depending.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
HAZARD COMMUNICATION REQUIREMENTS Site Specific Written Program Chemical Inventory MSDSs/SDSs Labeling Non-routine Tasks Contractors Training.
Essentials of project management Lecture 8. Targets of Lecture Introduction to project management –Understanding the target process in typical projects.
Customer Service.
Look at This PowerPoint for help on you times tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Multiplication Tables Test 3 and 5 Times Tables 3 and 5 times tables There are 10 questions. Each one will stay on the screen for 15 seconds. Write down.
Server Technology Confidential Page 1, June 22,2009 Server Technology Global Services.
Seoul,South Korea February  Scope of high technology-based industry  Fact and Figures  Business opportunity  Closing Remarks.
VOORBLAD.
NIMS Communications and Information Management IS-700.A – January 2009 Visual 4.1 NIMS Resource Management Unit 4.
UNIT 2: SOLVING EQUATIONS AND INEQUALITIES SOLVE EACH OF THE FOLLOWING EQUATIONS FOR y. # x + 5 y = x 5 y = 2 x y = 2 x y.
1 How Do I Order From.decimal? Rev 05/04/09 This instructional training document may be updated at anytime. Please visit and check the.
Strategy Review Meeting Strategy Review Meeting
Welcome to the world of Baccara. is a proud manufacturer of high quality solenoid valves and system solutions with operations in the USA, Israel, Spain,
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
Addition 1’s to 20.
25 seconds left…...
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Week 1.
Page 1 of 36 The Public Offering functionality in Posting allows users to submit requests for public offerings of Petroleum and Natural Gas(PNG) and Oil.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
12 January 2009SDS batch generation, distribution and web interface 1 ExESS IT tool for SDS batch generation, distribution and web interface ExESS IT tool.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
PSSA Preparation.
FINAL EXAMINATION SCHEDULE SPRING 2009 MAY 15 – MAY 22 NOTE: A class that meets at more than one of the times on this final examination schedule will take.
Cost-Revenue Analysis for Decision Making
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Development and Quality Plans
ConsultingProcedure 1 Plan 3 Process Analysis 4 Implementation 5 Delivery 2 ProERP Concept.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Innovative Testing & Engineering Solutions for the Industry
Consulting Procedure
Presentation transcript:

10- M3200 STD PSA – 250 PSIG Daesung Korea - Job # 8297 Kamal Hatami, Product Engineer Feb 20 th, 2009

22 Overview 1.Job Overview 2.Project Team 3.Project Schedule 4. Project Man-hours 5.Budget 6.Communication Plan 7.Risk Elements

– Daesung Korea 1. Job Overview Customer: Daesung End User: Daesung Industrial Gases Co. Korea Application: Biogas Site Location: Seoul, South Korea Job Number: 8297 Gas Specification 1. Feed Flow: 200 NCMH 2. Feed Pressure: 123 PSIG 3. Product Flow: 106 NCMH 4. Product Pressure: 108 PSIG 5. Expected Recovery: 81% (Not Guaranteed) Product 1. M vessels, ASME, 250 MAWP 3. Automatic isolation on feed, product, manual isolation on exhaust 4. Slow pressurization and filter bypass on the feed line 5. Motor and control panel 380V/3 ph/60 Hz and speed 0.5 RPM

– Daesung Korea Time 1. Project Start Date: Feb 11, Project Duration: 12 weeks 3. Shipment Date: May 11, Commissioning Date: TBD Scope of Supply 1. Manufacturing and Assembly 1.1 Mechanical: QuestAir: Supply Valve assembly to IPI IPI: Supply fully assembled system ( beds, skid, piping) and assembles valves into system 1.2 Electrical: QuestAir: Supply Electrical panel and Motor IPI: Junction boxes and cabling inter-connections

– Daesung Korea 2. Testing QuestAir: Test the Valve & Electrical Panel Assembly IPI: System EOL Testing 3. Shipping (Ocean/Air/Road) QuestAir: Ship the Valve & Electrical Panel to IPI QuestAir: Arrange final shipment to the client site

– Daesung Korea 2.Project Contacts and QA Team Members 2.1SKS Project Lead 1.Project Manager: Ho-Jong LEE 2. Address: 2.2 QA Project Team 1. Product Engineer: Kamal Hatami, brad Moores 2. Mechanical Design: Kamal Hatami 3. Electrical Design: Joel Lancaster 4. Purchasing: Sandeep Sahota 5. Manufacturing: Mike Sayer

– Daesung Korea 3. Project Schedule Note: This is a STD 10 - M3200 with a complete Fabrication and valve design. Tasks Start Date End Date Ownership 1.App spec., P&ID,CIL, GA 12-Feb Mar-2009 KH 2.Design approved by Client 10-Mar Mar-2009 Lee 3.Electrical Design 16-Mar Mar-2009 JL 4.Electrical Panel build 19-Apr Apr-2009 WC 5.Valve build and test 19-Mar Mar-2009 MS 6.Fabrication and EOL test 27-Feb April-2009 IPI 7.Shipping 11-May-2009 IPI

– Daesung Korea 4. Project Man-hours Project Hour Breakdown Project Management: 60 hours-KH Mechanical Design: 16 hours-KH Electrical Design: 16 hours-JL Process P&ID: 4 hours-KH

– Daesung Korea 5. Budget Costs: $98,000 CAD (according to cost model) Sale Price: $185,000 CAD Contribution Margin: 47%

8297 – Daesung Korea 6.Communication Plan Date 2.1External 1. Technical Document Review (system) (Mar 10 th ) 2. Design Complete (modules) (Mar 19 th ) 3. Manufacturing Start (Feb 27 th ) 4. Purchasing Complete (Apr 18 th ) 5. Skid Leak Test (Apr 27 th ) 6. Ready to ship (May11 th ) 2.2 Internal 1. Design review and freeze (system) (Mar 10 th ) 2. All BOMs completed and uploaded (Mar 19 th ) 3. Customer change request/order (if required) 4. OTD updates/issues (weekly)

8297 – Daesung Korea 7. Risk Elements Design Basis ( Compositions, flow rate and recovery) Confirm process conditions with the customer, KH Lack of Korean certification knowledge Review old jobs and what was done. Confirm requirements with customer, KH. Electrical requirements not understood Confirm requirements with customer, KH. Start-up and PSA Integration not clear Review requirements with customer, GV.