Role of Site Plan Review in Erosion Prevention The City of Spartanburg Site Plan Review Process Bob Klute, Community Enhancement Manager September 23,

Slides:



Advertisements
Similar presentations
Adobe 5 Collaborative Proposed Project Plan February 23, 2004.
Advertisements

NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
West Virginia Conservation Agency. Section 319 Non Point Source Program WVCA is the primary entity responsible for the implementation of the: Agriculture.
Session 4 Outline Overview of regulations needed. What should regulations address? What to look for in model regulations? Participation discussion on current.
Water Law and Institutions – rights and binding agreements U.S. water rights traditionally based on common law: Riparian doctrine in East – land owners.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Project Background and Objectives
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Welcome to Wingfield. …a new vision for Lake Murray living Wingfield.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
Upper Merion Township’s New Storm Water Management Program
Best Local Land Use Practices A Project of the Ohio Lake Erie Commission The Countryside Program, Levin College of Urban Affairs Kirby Date, AICP Coordinator.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
G OOSE & C ROOKED C REEK L OCAL W ATERSHED P LAN Watershed Technical Team Phase IV-Implementation 1 st Meeting August 5, 2013.
U.S. Department of the Interior U.S. Geological Survey USGS National Hydrography Dataset Stewardship in West Virginia George Heleine USGS NHD POC Region.
Permits. The Process Plans are developed by an Architect or Engineer and presented to the Municipality – State Environmental Quality Review (SEQR) declaration.
Platting Update Orange County BCC January 27, 2015.
Community-based Education K-12 students serving as a resource for meeting community needs.
Neighborhood Preservation & Enhancement Workshop ~ Workshop Overview~ Discuss a range of possible tools and initiatives to enhance City’s ability to preserve.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
City of Westlake P ublic I nvolvement & P ublic E ducation Program.
Integrating LID Into the Development Planning Process.
Integration Of Stormwater Master Plans with Watershed Plans The Link between Flooding and Development September 23, 2008 Bob Murdock, P.E., CFM.
We Are All The Webmasters: New Models for Building a Library Website Christopher Stewart Sohair W. Elbaz Illinois Institute of Technology June 2002.
Protective Regulations Ohio Lake Erie Commission Best Local Land Use Practices January, 2007 Kirby Date, Countryside Program Coordinator.
 Part 2: Community Design: Respect and Care for the Natural Environment Joe Duggan 1.
Roles and Responsibilities in Municipal Land Use.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
Public Hearing Modifications to the Gated Community Ordinance Board of County Commissioners Presented by the Orange County Public Works Department February.
Transit Revitalization Investment Districts Planning and Implementation of Act 238 of 2004 July 2006 Getting to TRID Lynn Colosi Clear View Strategies.
Watercourse DPA District of North Vancouver Streamside DPA Development Permit Area for the Protection of the Natural Environment: Streamside Areas Public.
Stormwater Treatment and Flow Control Dan Cloak Presentation to the Citizens Advisory Committee November 13, 2006 Options for implementing new Phase II.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
The ABC ’ s of the Development Review Process: Navigating the Bureaucratic Maze 2007 GPA Fall Conference.
1 Accommodating Utilities in Highway Rights-of-Way Federal Agency Update IRWA/AI Conference Las Vegas, NV January 13, 2009.
Overview of the 401 WQC Process. Main Topics Relationship between Clean Water Act Sections 404 and 401 State permitting processes Specifics of Kentucky’s.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Stanton Energy Center Solar Facility Presentation to the Board of County Commissioners February 22,
Streamlining – The Need: Costs Saved and Lessons Learned Facilitating Disaster Preparedness, Response & Recovery.
Best Local Land Use Practices A Project of the Ohio Lake Erie Commission The Countryside Program, Levin College of Urban Affairs Kirby Date, AICP Coordinator.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Babes-Bolyai University Faculty of Political, Administrative and Communication Science The need for Planning Diana Apostol NGO Management 1 st Year.
Interlocal Agreement with Flagler County related to Airport Development September 16, 2014 City Council Meeting.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
The Rezoning Process CHARLOTTE-MECKLENBURG PLANNING.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
Growing Smarter Pennsylvania’s Land Use Agenda. Percent of Land Developed in Pennsylvania Source: Natural Resources Conservation Service, U.S. Department.
Comprehensive Thinking and Planning
Irrigation with AMR Proposition 84 Drought Round Grant Irrigation with Automated Meter Reading Project Grant Agreement with Association of Bay Area Governments.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Response to an Emergency Training for 211 Staff in Ontario Updated September
The Crash Course for Municipal Planning Commission Members in Cumberland County 1.
CONTEXT-SENSITIVE DESIGN 2002 Texas Department of Transportation Design Conference.
The Oregon Watershed Council Model, USA
Low Impact Development: Stumbling Blocks or Stepping Stones?
Sacramento County Stormwater Quality Program
Water Quality Protection Zones
Chapter 12 – Local Government
City Council Meeting November 14, 2016
Reasons for Developing a Cooperative Plan to Expand the Village
FIRE UPGRADES OF EXISTING BUILDINGS
Sacramento County Stormwater Quality Program
Presentation transcript:

Role of Site Plan Review in Erosion Prevention The City of Spartanburg Site Plan Review Process Bob Klute, Community Enhancement Manager September 23, 2004

Previous Review Problems In the City of Spartanburg, the challenges of increasing urbanism and increasing Federal regulations have changed the way the City reviews development issues, including storm water and erosion control. In the City of Spartanburg, the challenges of increasing urbanism and increasing Federal regulations have changed the way the City reviews development issues, including storm water and erosion control. Until recently, City ordinances affecting development, including the storm water and erosion control ordinance, were administered by various City agencies with only occasional interaction between them. Usually the interaction was driven by a problem created by the lack of initial communication. Until recently, City ordinances affecting development, including the storm water and erosion control ordinance, were administered by various City agencies with only occasional interaction between them. Usually the interaction was driven by a problem created by the lack of initial communication.

Examples of Lack of Coordination For instance, in the review of a major new shopping center (Dorman Centre), lack of coordination between city engineering and city planning resulted in confusion in terms of the placement of required detention ponds relative to a natural area to be preserved and a natural buffer. For instance, in the review of a major new shopping center (Dorman Centre), lack of coordination between city engineering and city planning resulted in confusion in terms of the placement of required detention ponds relative to a natural area to be preserved and a natural buffer. Confusion resulted in costly delays for the developer and a number of ad hoc changes during both review and construction. Confusion resulted in costly delays for the developer and a number of ad hoc changes during both review and construction. Initial coordination and agreement on objectives to be met would have resulted in a better (more functional and aesthetic) system for both aesthetic buffering and storm water control. Initial coordination and agreement on objectives to be met would have resulted in a better (more functional and aesthetic) system for both aesthetic buffering and storm water control.

Current Review Process An interdisciplinary review is now in place including representatives of all City agencies involved in development review: building official; planning and zoning; engineering; public works; fire marshal. An interdisciplinary review is now in place including representatives of all City agencies involved in development review: building official; planning and zoning; engineering; public works; fire marshal.

Two Step Process This is a two step process: This is a two step process: First, the City Managers Development Team (which consists of the City Manager and senior City staff) meets once a week and provides a forum for developers to present and discuss conceptual plans for development projects. This part of the process acquaints the developers team with the City team, City regulations and expectations and identifies possible issue areas to work on through the review process. First, the City Managers Development Team (which consists of the City Manager and senior City staff) meets once a week and provides a forum for developers to present and discuss conceptual plans for development projects. This part of the process acquaints the developers team with the City team, City regulations and expectations and identifies possible issue areas to work on through the review process.

Coordination Second, once projects are filed: the Site Plan Review Team (consists of a subset of the Development Team) meets once a week and reviews formal filings for technical issues. Second, once projects are filed: the Site Plan Review Team (consists of a subset of the Development Team) meets once a week and reviews formal filings for technical issues. Planning staff coordinates the site plan review: serves as clearinghouse for comments back to the developer and distributes revised drawings and developer responses to the Site Plan Review Team. The Site Plan Review is intended to be a fast track process, with review and approval possible within a one week time frame. Planning staff coordinates the site plan review: serves as clearinghouse for comments back to the developer and distributes revised drawings and developer responses to the Site Plan Review Team. The Site Plan Review is intended to be a fast track process, with review and approval possible within a one week time frame.

Continuous Commitment The coordination is continuous and very time consuming but helps ensure that conflicts are resolved jointly and not in isolation. The coordination is continuous and very time consuming but helps ensure that conflicts are resolved jointly and not in isolation. Have gotten a good response from local development community. Have gotten a good response from local development community.

Examples of the benefits: Allows developers and staff to think outside the typical review box, seek solutions that cut across professional lines Allows developers and staff to think outside the typical review box, seek solutions that cut across professional lines (for instance: currently working with two groups of doctors who will share a storm water detention pond and incorporate it into a landscaped buffer next to a single family neighborhood; a third property owner now wishes to join the first two and utilize the proposed detention pond which is being redesigned to accommodate a greater capacity. (for instance: currently working with two groups of doctors who will share a storm water detention pond and incorporate it into a landscaped buffer next to a single family neighborhood; a third property owner now wishes to join the first two and utilize the proposed detention pond which is being redesigned to accommodate a greater capacity. The advantages to the property owners: less cost and hassle; the advantages to the community: only need one well designed pond where otherwise would have three. The advantages to the property owners: less cost and hassle; the advantages to the community: only need one well designed pond where otherwise would have three.

Example This example came out of a presentation to the Development Team by the architect for the first group of doctors, and is an example of the staff working with the architect to broaden the scope as well as staff contacting the third property owner to explain the benefits of a joint approach to development. This example came out of a presentation to the Development Team by the architect for the first group of doctors, and is an example of the staff working with the architect to broaden the scope as well as staff contacting the third property owner to explain the benefits of a joint approach to development.

Benefits Other benefits: the staff gets used to working together as team, becomes aware of each others perspectives and issues. Other benefits: the staff gets used to working together as team, becomes aware of each others perspectives and issues. Benefits to developers: a process that they can count on, but that has some flexibility and is supportive of innovative solutions. Also, the developer does not have to go shopping for the answer to an issue; the developer knows that the answer back from the City on an issue does represent the entire City position and wont be countermanded by another agency. Benefits to developers: a process that they can count on, but that has some flexibility and is supportive of innovative solutions. Also, the developer does not have to go shopping for the answer to an issue; the developer knows that the answer back from the City on an issue does represent the entire City position and wont be countermanded by another agency.

Federal Requirements As federally mandated regulations for storm water and erosion control become more pervasive and complex, this type of approach will be necessary for the City of Spartanburg to ensure that these requirements are met, not at the expense of other issues. As federally mandated regulations for storm water and erosion control become more pervasive and complex, this type of approach will be necessary for the City of Spartanburg to ensure that these requirements are met, not at the expense of other issues.

Riparian Buffer Ordinance City Council passed last year a Riparian Buffer Ordinance which staff is currently administering, as part of the storm water management system required in response to the Federal Post Construction Runoff Control Measures required for Small Municipal Separate Storm Sewer Systems (MS4). The staff review process was used to develop and review the ordinance. City Council passed last year a Riparian Buffer Ordinance which staff is currently administering, as part of the storm water management system required in response to the Federal Post Construction Runoff Control Measures required for Small Municipal Separate Storm Sewer Systems (MS4). The staff review process was used to develop and review the ordinance. This ordinance prohibits removal of existing vegetation within buffers associated with major streams within the City and provides for a Revegetation Standard for replacement where vegetation is removed in violation of the ordinance. This ordinance prohibits removal of existing vegetation within buffers associated with major streams within the City and provides for a Revegetation Standard for replacement where vegetation is removed in violation of the ordinance.

Typical Riparian Buffer

Revegetation Standard

Riparian Buffers: City of Spartanburg

Future Challenges The City of Spartanburg represents only a small portion of the total watershed comprising Spartanburg County; The City of Spartanburg represents only a small portion of the total watershed comprising Spartanburg County; Also, the Revegetation Standard in the Riparian Buffer should ideally be extended to retrofit existing sites to add vegetation to stream banks where there currently is none; Also, the Revegetation Standard in the Riparian Buffer should ideally be extended to retrofit existing sites to add vegetation to stream banks where there currently is none; A great deal of work to be done in public education; linking natural areas with public open space needs; A great deal of work to be done in public education; linking natural areas with public open space needs; Increase functional open space to avoid construction of costly storm water control facilities. Increase functional open space to avoid construction of costly storm water control facilities.