Status of the PANDA Solenoid Magnet Production in BINP

Slides:



Advertisements
Similar presentations
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Advertisements

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
1 A Joint Proposal for US-Japan Cooperation Program Proposal to JSPS US-Japan collaboration fund R&D of superconducting magnet technology for high intensity.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Status of CEPC Detector magnet
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
Magnet designs for Super-FRS and CR
IHEP participation in SIS300 production UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Institute for High Energy Physics Protvino, Russia FAIR meeting.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
1.  YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm (0,-0.5)  Fasteners =
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
Linear Collider Detector Magnet Project R&D activity on a new superconducting cable for a 5T, 6m bore coil. B. Curé - A. Gaddi / CERN Physics Dept.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting Racetrack Coil Fabrication
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Status of work on the project # (VNIINM) Team leader -V.Pantsyrny June 20071INTAS-GSI Meeting, Darmstadt.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
EXTRUSION BASIC CONCEPTS
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
Status of the PANDA Solenoid Magnet Production in BINP
High energy beam transport.
LINEAR COLLIDER WORKSHOP SiD Solenoid Status
Status of the PANDA Solenoid Magnet Production in BINP
Superconductng cable for CBM magnet
FCC Conductor Development at KAT-Korea
Update on PANDA solenoid design
Some Design Considerations and R &D of CEPCB Dipole Magnet
Solenoidal magnet. The status of manufacture, forthcoming works
CSP 25th November 2010 Technical agreement number 3: overview
6th BINP-FAIR-GSI Workshop,
HFM Test Station Main Cryostat
PANDA Yoke of the Magnet
The CMS magnet superconducting coil
Agenda 9:00  - Welcome ASG speaker 9:10 -  Introduction -       P.Fabbricatore 9:25 - The D2   magnets in HL-LHC   -  E. Todesco.
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
CERN Conductor and Cable Development for the 11T Dipole
(Procurement, testing of magnets)
Status of the PANDA Magnet
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Far Detector Activities Late 2017 – Early 2018
the MDP High Field Dipole Demonstrator
Analytical Cost Model (16 T dipole)
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
MQXF updates P. Ferracin October 9th, 2014.
Chapter 5 Power Estimation in Extrusion and Wire-rod Drawing
I. Bogdanov, S. Kozub, V. Pokrovsky, L. Shirshov,
BESIII Collaboration Meeting, June 5~6, 2002, Zian Zhu
HIE-LINAC status report
P.Fabbricatore & S.Farinon
The superconducting solenoids for the Super Charm-Tau Factory detector
Status of the PANDA Solenoid Magnet Production in BINP
PANDA The conceptual design of the control Dewar
as a prototype for Super c-tau factory
Crab – RFD prototype: Fabrication Status Update
Budker Institute of Nuclear Physics,
PANDA Cryostat and Yoke
Mechanical Properties of Metals - I
Budker Institute of Nuclear Physics,
Qingjin XU Institute of High Energy Physics (IHEP),
Presentation transcript:

Status of the PANDA Solenoid Magnet Production in BINP

Assembling and tests at the FAIR site The main milestones of production of the PANDA solenoid magnet The scope of delivery includes: Magnetic and engineering design of the magnet including tools and support; Production and delivery of the magnet (consisting of yoke, cold mass and cryostat, alignment components, proximity cryogenics, support frame and platform beams) and all tools; Power converter and quench protection and instrumentation. Item Date Start contract 03/2017 Control assembling of the Yoke of solenoid at the BINP site 09/2019 Magnetic tests of the PANDA solenoid including safety system and electrical components at BINP (additional contract) 07/2020 - 05/2021 Assembling and tests at the FAIR site Assembling of the Yoke at Darmstadt 11/2021 Acceptant tests at FAIR 08/2022 Installation of the PANDA solenoid magnet at worked position and start final acceptance tests 05/2023 Table 1. The main milestones. 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Power supply and energy extraction system PANDA solenoid magnet, BINP responsibility Power supply and energy extraction system Control Dewar box Cable channel Figure 1. Arrangement of the components of the PANDA solenoid. Solenoid and yoke Frame of solenoid 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Development of the PANDA solenoid magnet Name of item Status of work Yoke and frame Design is ready, start production Cryostat of solenoid Design is ready, FDR 11/ 2018, Technology works, design tools Cold mass Design is ready, PDR 11/ 2018 Technology works, design tools Conductor purchasing Development work Control Dewar box Design in progress Cable channel Start design Power supply and energy extraction system Design in progress, FDR 17/ 2018 Magnet safety system Start discussing 11th week 2018 Table 2. Status of work of the PANDA solenoid production. 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm The main milestones of the yoke production Name of milestone Date 2017/10 Memorandum BINP/ plant SibElectroTherm (SET) 05/2017 Presentation design of the yoke after technological work of drawings in FAIR 20-25/07/2017 PDR of the yoke 04-07/10/2017 FDR of the yoke 20-25/11/2017 Contract with SibMash (SET), signed 2/11/2017 Purchasing raw materials (1st batch, 60 t) 26/12/2017 Start of production of the 1st octant 01/2018 Status production Manufacturing parts of tooling for assembly of octants ready Welding and machining tooling Cutting sheets of the 1st octant Start assembling of the 1st octant 24-27 may 2018 Control of the 1st octant End of June 2018 Delivery raw material to SibMash (SET) 04 - 08/2018 In progress Table 3. The main milestones of the yoke production. 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Upper octant assembling scheme Manufacturing of the first octant in Sibmash. Upper octant Upper octant assembling scheme 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm The main milestones of the yoke production Name of milestone Date 2017/10 Production of the all barrel octants 12/2018 Production of the frame and beams 11/2018 Production of the doors 03/2019 Control assembling at SET 04/2019 Finalization of the parts 05/2019 Assembling of the Yoke at BINP 09/2019 Table3. The main milestones of the yoke production. 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Status of the PANDA conductor development/ procurement 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm Main risks Purchasing super conductive conductor - lack of a manufacturers Rutherford cable, 8 strands, extruded in Al matrix 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Figure 4. Longitudinal section of the cryostat with cold mass. Main risks Purchasing super conductive conductor - lack of a manufacturers Rutherford cable, 8 strands, extruded in Al matrix Thickness (after cold work) at 300 K mm 7.93 ± 0.03 Width (after cold work) at 300 K 10.95 Critical current (at 4.2 K, 5 T) A > 14690   Critical current (at 4.5 K, 3 T) > 16750 Overall Al/Cu/sc ratio 10.5/1.0/1.0 Aluminum RRR (at 4.2 K, 0 T) > 1000 Al 0.2% yield strength at 300 K MPa > 30 Table 4. Conductor mechanical and electrical parameters. Figure 4. Longitudinal section of the cryostat with cold mass. Figure 6. Drawing of the conductor. Figure 5. Cold mass cross-section. 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Figure 4. Longitudinal section of the cryostat with cold mass. Main risks Purchasing super conductive conductor - lack of a manufacturers. Development technology production of the PANDA conductor. Rutherford cable, 8 strands, extruded in Al matrix Thickness (after cold work) at 300 K mm 7.93 ± 0.03 Width (after cold work) at 300 K 10.95 Critical current (at 4.2 K, 5 T) A > 14690   Critical current (at 4.5 K, 3 T) > 16750 Overall Al/Cu/sc ratio 10.5/1.0/1.0 Aluminum RRR (at 4.2 K, 0 T) > 1000 Al 0.2% yield strength at 300 K MPa > 30 Table 4. Conductor mechanical and electrical parameters. Figure 4. Longitudinal section of the cryostat with cold mass. Figure 6. Drawing of the conductor. Figure 5. Cold mass cross-section. 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

PANDA conductor cross-section 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Manpower; BINP Extra money. Status of the PANDA conductor production Collaborators and BINP as coordinator of R&D work VNIINM - A.A. BOCHVAR HIGH-TECHNOLOGY SCIENTIFIC RESEARCH INSTITUTE FOR INORGANIC MATERIALS; VNIIKP - Russian Scientific Research Design and Technological Institute of Cable Industry; SARCO – Saransk cable optic. Manpower; Extra money. BINP 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

production strands - according to CERN specification Status of the PANDA conductor production A.A. BOCHVAR HIGH-TECHNOLOGY SCIENTIFIC RESEARCH INSTITUTE FOR INORGANIC MATERIALS (VNIINM) production strands - according to CERN specification For development 1. Manufactured strand: Diameter – 1,4 mm; Length - 1700 m. Strand is produced and shipped to VNIIKP 2. Machine for production pure Al rods diameter 9,5 mm – yes Weight loss pure Al 5N5 - 10-20% 3. Measurement RRR of samples pure Al of a different melts Preparation Contract between VNIINM and BINP for production in progress 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm Status of the PANDA conductor production Weight loss production rod Ø48-53 - 53-48 % Contract between VNIINM and BINP for production rods Ø9,5mm in progress. 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Status of the PANDA conductor production BINP BINP received pure Al 5N5 of three different melts. Weight loss production rod Ø48-53 - 53-48 % Contract between VNIINM and BINP for production rods Ø9,5mm in progress. 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Status of the PANDA conductor production VNIIKP Russian Scientific Research Design and Technological Institute of Cable Industry Adjustment and fitting machine to produce a Rutherford cable - according to CERN specification Samples of the Rutherford cable from copper wires 200m length and NbTi/Cu strand about 120m length are ready. Contract for development work is signed from VNIIKP side and in agreement BINP side 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Sarco - Pure Al co-extrusion/ plating Status of the PANDA conductor production Sarco - Pure Al co-extrusion/ plating Two lines (China and England production) about 100 m length are working on today. Two additional lines are in process of shipping and preparation for montage. 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Sarco - Pure Al co-extrusion/ plating Status of the PANDA conductor production Sarco - Pure Al co-extrusion/ plating The development of parameters of extrusion is our aims at the present time. Lines work in automatic conditions with control temperatures, pressures and velocities of steel pipe/wire and  Al rod moving. The parameters possible to regulate in the ranges: temperatures of steel pipe/wire - 300-450 degrees temperatures of extrusion volume - 300-450 degrees Celsius heating medium - N2 pressures of extrusion volume -     20-50 bars diameter Al rod - 9.5 mm quantity of inlet of Al rods – 2 velocity of pipe/wire - 30-100 m/min velocity of pipe/wire - depend. Used centering tooling, tolerance of non-centers smaller than 0.04 mm for standard process, for Rutherford cable - ? 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Sarco - Pure Al co-extrusion/ plating Status of the PANDA conductor production Sarco - Pure Al co-extrusion/ plating Dies for centering the cable and forming the shape of the conductor. 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Status of the PANDA conductor production Schedule Item Date Experience Cu cable and Al95 (4N5) 06/2018 Study mechanical properties conductor and quality process 07/2018 Production pure Al wire Ø9,5mm 08/2018 Experience Cu-Al 5N5 conductor Study mechanical properties conductor, quality process and RRR pure Al after process 09/2018 Experience NbTi/Cu-Al 5N5 conductor Study of properties of a conductor 10-11/2018 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm

Thank you for your attention 12.11.2018 E.Pyata, BINP, PANDA Collaboration Meeting, Stockholm