Industrial Storm Water Permits The purpose of the Stormwater Industrial program is to provide training, inspections and enforcement to municipal and industrial.

Slides:



Advertisements
Similar presentations
Jamie Petersen Administrative Assistant - Stormwater Front Desk: (402) Michael Crisco Program Specialist – Storm.
Advertisements

Wastewater and Stormwater Discharge from Landfills Rick Pinneo Illinois EPA.
Multi-Sector General Permit Preparing a Stormwater Pollution Prevention Plan DEC Stormwater Section Christy Witters & Christina Hutchinson
Landfill transfer stations
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Alaska Association of Harbormasters and Port Administrators Wrangell, Alaska October 26, 2010 Shane Serrano ADEC.
NDEQ Industrial Storm Water General Discharge Permit Presentation for: Nebraska Aviation Symposium January 27, 2011 By: Bill Imig, Environmental Scientist.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Developing a Stormwater Pollution Prevention Plan (SWPPP)
Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
Storm Water Permit Compliance Susan Murphy. Storm Water: To See or Not To See… We submit a Notice of Intent for Coverage (NOI) Prepare and Implement a.
Spill Prevention Control & Countermeasures Compliance and Planning.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
Stormwater Pollution Prevention Compliance District Department of the Environment.
Collecting a Stormwater Sample Annual CMTA Marine Trades Exposition October 5, 2010.
4/27/2015 Licking County Engineer’s Office MCM#6 Training MCM#6 – Pollution Prevention/Good Housekeeping for Municipal Operations Licking County & Partners.
Central Massachusetts Regional Stormwater Coalition Part 5 Standard Operating Procedures September 26, 2013 Community Innovation Challenge Grant 2013.
What is NPDES? “National Pollutant Discharge Elimination System”
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
MAINTAINING WATER QUALITY CITY OF TULSA PERMIT ENFORCEMENT.
GAR General Storm Water Permit for Industrial Activity
2014 Industrial General Permit Summary of Key Updates Order DWQ Sandy Mathews August 19, 2014.
MCM #6: Pollution Prevention and Good Housekeeping for Municipal Operations What to expect during an MS4 INSPECTION.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
County of San Bernardino Stormwater Program Municipal Activities Pollution Prevention Strategy (MAPPS) Volume II Inspection of Commercial/Industrial Businesses.
Pollution Prevention and Good Housekeeping Activities for Municipal Operations Developing the Storm Water Pollution Prevention Plan Presenter: Keith Noble,
Applying for the VT Multi-Sector General Permit
Inspection Records and Reports NC DWR, Raleigh Regional Office 3800 Barrett Drive Raleigh NC (919)
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Applying for the VT Multi-Sector General Permit Step 3. Claiming No Exposure No Exposure is one of two ways to comply with the MSGP. It is the quickest.
Storm Water Pollution Prevention Training
Creating a Storm Water Pollution Prevention Plan For Industrial Facilities.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
HOW TO DO Pollution Prevention & Good Housekeeping NC STATE UNIVERSITY.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
ILLICIT DISCHARGE DETECTION AND ELIMINATION IDENTIFYING, TREATING AND PREVENTING IT UNDER THE BOROUGH’S STORMWATER MANAGEMENT PROGRAM.
Basic essential training for compliance with Storm Water Pollution Prevention Plans.
Introduction to MS4 Stormwater Requirements (2009)
Purpose of Stormwater Pollution Prevention Plans (SWP3s) for Industries Richard Smith Resource Management Conference Tulsa Garden Center March 26, 2015.
Illicit Discharge Detection and Elimination 6/4/20161 Illicit Discharge Detection and Elimination.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Test Your Storm Water Knowledge!
February 11, 2011 Industrial Stormwater Permit and Annual Report Preparation Instructor: George Caamano.
Stormwater Compliance Training South County Regional Wastewater Authority July 2015 Jack Rosenburg CH2M / Oakland.
An Overview of our Community’s Stormwater Management Program
Part 2 - What is a SWPPP? Preventing Stormwater Pollution at Your Public Works Facility: A 5-Part Workshop Series.
Part 5 - Good Housekeeping
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
Welcome to the Frog Environmental Winery Compliance Association
Stormwater Pollution Prevention Program Compliance
Advanced Environmental Management (AEM) Training Phase I
ILLICIT DISCHARGES– COMMON PROBLEMS
TPDES Construction Management at the City of Laredo
Sacramento County Stormwater Quality Program
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
Taking a Dip in Your SWPPP
MS4 OVERVIEW 2015.
Sacramento County Stormwater Quality Program
Presentation transcript:

Industrial Storm Water Permits The purpose of the Stormwater Industrial program is to provide training, inspections and enforcement to municipal and industrial facility owner/operators and the public so they can be in compliance with their Oklahoma City Stormwater Industrial Discharge permit and to prevent pollution of Oklahoma City community waterways. City of Oklahoma City Public Works Department Storm Water Quality Division

History… OKC Public Works Department obtained ODEQ Permit – 1995, and all City permits were in place. 1 st Focus : Erosion Control & Construction Outreach & Training 2 nd : 1996, began Industrial Inspections 3 rd : 1997, began Cosmetic Cleaning

Are you on the list? Is there a Potential? USEPA identified 11 industrial business facility categories, each with a list of SIC codes, to be evaluated for the permit requirement. 40 CFR (b)(14)(i)-(xi) You must first find your 4-digit SIC code,( Corporate tax returns under Schedule K ), and determine if your on the list.

SIC and/or Risk Assure the facilitys SIC is listed or the activity is worthy of permitting. Evaluate the Potential Pollutant Risk None: No Exposure Certification Yes: Permit Permitted facilities receive: Annual Audits Semi-annual Inspections Complaint Inspections Annual Workshops at no cost

No Exposure Certification NO EXPOSURE…. Means precipitation does not come into contact with any industrial materials and/or activities, and if it does, It will not have a potential to pollute the waterways of the state. NECs are reviewed every 5 years.

Storm-Resistant Shelter Not Required When … Drums, barrels, tanks, & other containers are sealed (never opened outside), and do not have operational taps/valves Are not deteriorated or leaking Have clean exteriors Are off the ground, on a contaminant-free platform, rack or pallet Are regularly inspected

Audit/Inspection Preparation Monthly printouts of inspections due are provided to each Inspector. Each Facilitys Permit File is reviewed, and the pink copy of the last visit is pulled. The inspector may review literature on unfamiliar industrial types. The Inspector may (some prefer not to) then make appointments with each Facility Coordinator/Owner.

Upon Arrival Establish contact with the Coordinator and present credentials. Explain the purpose of the visit, the information to be reviewed, and the exterior inspection to be done. Document initial information on the 3-copy audit form.

Information & Forms Required Include: SWQ Notice of Intent (NOI) SWPPP – Storm Water Pollution Prevention Plan [Materials/Activities Inventory & BMPs] Facility Site Plan or Map Routine Site Inspection Documents with P.M. Employee Training Quarterly Visual Monitoring Documents Annual Comprehensive Site Evaluation Reports

Inventory & Specific BMPs Most important part of the Plan! Documents all outside materials & activities, Perform Risk Assessments on each, and if risk found… Requires a specific BMP to assure no pollutant has the potential to be dis- charged from the property.

Overall Measures & Controls A continuing identification and assessment of potential pollutant sources will require your plan to address, and have a written narrative, on the 12 baseline BMPs: Good housekeeping Minimizing Exposure Preventive Maintenance Program Spill Prevention & Response Plan Training Routine Facility Inspection Quarterly Visual Monitoring Annual Comprehensive Site Compliance Evaluation Report Sediment & Erosion Control Management of Runoff Solid Materials & Floatable Debris Control, etc. Maintenance of Non-structural BMPs

Non-Stormwater Discharges To Certify that your facility has been evaluated, you must: Identify potential non-stormwater discharges (Process water; A/C condensate; Cooling water; Vehicle wash water; Sanitary wastes) Allowable Discharge vs. A Pollutant Describe the method used (visual or analytical), and result of the evaluation Indicate the location of onsite drainage points, if any Provide the date and signature of the certifier.

Allowable Discharge vs. Pollutant If the evaluation test results find the discharge to be contaminated, it must be: Added to the Materials and Activities Inventory and the BMP Development forms, and the BMP implemented to control the discharge

Develop Site Maps (Actual & 1-mi Radius) To include discharge points (outfalls), storm drains, past spills, non- stormwater discharges Drainage patterns (direction of flow) Pollutants likely to be discharged – linked to Inventory Surface receiving waters within 1 mile Structural control measures Location of materials exposed to storm water Location of high-risk, waste- generating areas and industrial activities (fueling stations, loading/unloading areas, etc.)

Visual Monitoring You must perform and document a quarterly visual examination of a storm water discharge from each outfall identified on your site map. The sample(s) must be taken within the first 30 minutes, not later than 1 hour of when the runoff begins discharging from your facility, preferably during regular working hours. The rain event must be greater than 0.1 inches in magnitude and at least 72 hours from the last measurable rainfall. While your facility, or a site, is temporarily inactive and unstaffed, you may exercise a waiver of the monitoring requirement. To do this, you must sign and certify the waiver in your SWPPP, stating that the site is inactive or unstaffed and that performing visual examinations during a qualifying rainfall is not feasible.

Visual Monitoring Data ParameterMethodResults ColorVisualClear, yellow, red, brown, milky, etc. OdorSmellNone, earthy, sewage, musky, rotten eggs, petroleum, etc. ClarityVisual(look through the container) 1.) Cant see through the bottle 2.) Can see through, but cant read newsprint 3.) Can see through, and can read newsprint 4.) Pretty clear, but not as clear as bottled water 5.) As clear as bottled water Floating SolidsVisualYes / No Describe Suspended SolidsVisual(look through the container) Yes / No Describe Oil / Fuel SheenVisualColor and amount FoamVisualYes / No Describe thickness, color, how much surface it covers Other obvious indicators of storm water pollution VisualTell it like you see it Settled SolidsVisual(after settling for 24 hours) Measure solids that have settled out Sample to be collected in a wide-mouth, clear glass or plastic container, 500 ml or 1 qt in size.

Annual Audit Inspection Goal is to assure all industrial materials or activities, and their locations, which are exposed to storm water and have a potential to pollute, are addressed in the SWPPP. Proof is through Quarterly Visual Monitoring, Routine Facility Inspections, Employee Training and other required documentation.

What To Look For….. Areas where spills and leaks from equipment, drums, tanks, or other containers have occurred within the past 3 years Raw, final or waste materials; residue; trash; or sediment; that could contaminate, blow or wash away Offsite vehicle tracking of materials or sediment Evidence of, or potential for, pollutants to enter the Drainage System

Correct Storage of drums?

Illicit Discharge …any discharge to an MS4 that is not composed entirely of storm water…

Paint Spill Identify minor spills

Vs. Significant spills …a spill of a chemical from the Title III List of Lists: EPA. Consolidated List of Chemicals… …a sheen upon the water ways of the state….

Evaluate the facility… All industrial processes and disposal methods that has a potential to contaminate rain water runoff Outside storage areas and supplies Loading and unloading areas Chemical storage and spill control (ASTs) Waste storage, treatment and disposal Facilitys storm drain connections and ditches BMPs in use Maintenance of Records – 3 years

Floatable debris

Dumpsters without plugs, cause leakage & staining

Cosmetic Cleaning… Any commercial washing, requires a permit. In accordance with Chapter 57 of our Municipal Codes: Any system, machine, or substance used to remove undesirable substances from ANY surface or facade creating free foreign matter.

Closing The Audit Review findings during the walk around inspection. Initiate Notice of Violation if necessary. Agree upon compliance measures, and a follow up audit date if needed. Signatures; leave white copy. Semi-annual Visit done in 6 months.

Office Paper Flow Audit forms (yellow and pink copies) (and any pictures) are filed in the individual Facilitys Permit File. Information is entered into the Industrial database.

Enforcement All Industrial inspectors are commissioned Environmental Enforcement Officers, capable of shutting down or stopping any activity that is breaking city ordinances or a facilities requirement per their SWPPP. First offense: Warning possible Notice of Violation (NOV) Second offense: NOV and stopping activity or facility Third offense: NOV, stopping facility, fine/s On some occasions, in cooperation with the Departmental of Environmental Quality, felony arrests have been made.

Safety An Inspector shall not attempt to do an audit when the safety of the Inspector could be compromised in anyway, or If during an audit the Inspector feels that their safety is in danger in anyway, The inspector shall immediately stop the audit and leave the facility.

City of Oklahoma City Stormwater Quality Forms City Departments Public Works Storm Water Quality Forms