SoLID Magnet - Engineering and Cost

Slides:



Advertisements
Similar presentations
SBS Design Status Robin Wines. SBS Design Transfer in process of yoke steel from BNL, but BNL is having issues with their magnet tagging system – update.
Advertisements

Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Magnet, Support and Infrastructure Robin Wines July 9, 2014.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
IR Magnets for SuperKEKB KEK, Norihito Ohuchi 1.IR Magnets (ES, QCS, QC1) 2.Interference between Magnet-Cryostats and Belle 3.Summary SuperB.WS05.Hawaii.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
1 Design of Solenoid and iron yoke for GLD KEK Hiroshi Yamaoka Ken-ichi Tanaka July 13, ‘05.
Zhiwen Zhao (UVa), Paul Reimer (ANL) SoLID Collboration Meeting 2013/03.
Status of CEPC Detector magnet
Magnet designs for Super-FRS and CR
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
LCWS14 Benoit CURE - CERN/PH Dept.1 International Workshop on Future Linear Colliders October 2014 Organized by the Vinca Institute of Nuclear.
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
Zhiwen Zhao (UVa), Paul Reimer (ANL), Many Thanks to Eugene Chudakov, Xin Qian, Jian-Ping Chen, Whit Seay, Robin Wines, Javier Gomez, Will Oren, Rolf Ent.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Beam line Experiment area SC magnet Pion production target
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
SHMS Spectrometer Update Hall C 2008 Users Meeting Paul Brindza January 18, 2008.
The Cosine Two Theta Quadrupole Magnets for the Jefferson Lab Super High Momentum Spectrometer (SHMS). P.B. Brindza, S.R. Lassiter M. J. Fowler Abstract—
SBS Magnet and Infrastructure Status Robin Wines July 2015.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Gen Magnet Design JLAB MENG Contributors: Supervisor: Butch Dillon-Townes Magnet Engineer: Robin Wines Mechanical Designer: Ron Lassiter Mechanical Engineer:
SoLID magnet and yoke by using CLEO-II Zhiwen Zhao 2012/07.
SBS Magnet and Support Status Robin Wines June 2013.
Reducing the Iron in the Endcap Yoke of CLIC_SiD Benoit Curé, Konrad Elsener, Hubert Gerwig, CERN CERN, June 2014 Linear Collider Detector Magnet Meeting.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Thermal Analysis of the Cold Mass of the 2 T Solenoid for the PANDA Detector at FAIR G. Rolando 1, H. H. J. ten Kate 1, A. Dudarev 1 A. Vodopyanov 2, L.
Design ideas for a cos(2q) magnet
Status of the PANDA Solenoid Magnet Production in BINP
Status of work (cryostat, control Dewar, cooling system)
Update on PANDA solenoid design
CBM magnet overview of the BINP work
Renuka Rajput Ghoshal John Hogan Ruben J. Fair Probir K. Ghoshal
Agenda 9:00  - Welcome ASG speaker 9:10 -  Introduction -       P.Fabbricatore 9:25 - The D2   magnets in HL-LHC   -  E. Todesco.
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
SiD Solenoid Status and Plans
Yingshun Zhu Accelerator Center, Magnet Group
DOE/SC Status Review of 12 GeV SHMS HB Magnet: Update since Oct 2015
Status of the PANDA Solenoid Magnet Production in BINP
HRS at small angles for e+/ e- pair for APEX
BESIII Collaboration Meeting, June 5~6, 2002, Zian Zhu
MQXF coil cross-section status
P.Fabbricatore & S.Farinon
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
CLEO II Magnet in Hall A for SoLID
Updated concept of the CBM dipole magnet
Hall C SHMS & Configuration Status
IR Magnet Layout/Design - JLEIC
Status of the PANDA Solenoid Magnet Production in BINP
Magnet, Support and Infrastructure
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
as a prototype for Super c-tau factory
Hall C SHMS & Configuration Status
Presentation transcript:

SoLID Magnet - Engineering and Cost Robin Wines, JLAB SoLID Director’s Review 2015

Magnet - Engineering & Costs Experiment Requirements CLEO-II Solenoid Magnet Hall A Layout Analysis Magnet Modifications Costs and Project Manpower Status and Strategic Plan

Experiment Requirements SoLID requires a magnet to produce a uniform, symmetric field primarily in the direction of the beam; ideal choice of solenoid. The magnetic field is utilized for tracking and background shielding The spectrometer requires: large acceptance in polar angle of 8° to 24° for SIDIS and 22° to 35° for PVDIS, azimuthal angle of 2π, and momentum resolution of 2% from 1 to 7GeV The Solenoid has integral field requirement of 5 T-m, length of 3-4 meters with outer diameter limit of 3 meters and clear bore diameter of 2.9 meters.  

CLEO-II Solenoid Considered several magnets for SoLID. The CLEO-II from Cornell found to be the best solution CLEO-II is a superconducting solenoid magnet fabricated in 1989 and operated through 2008. The magnet remains housed in the Cornell facility. Jlab magnet and cryo engineers visited Cornell in 2014 to discuss operational history and transport of CLEO-II. Agreement in place to begin disassembly and transport of the magnet with oversight by Jlab in 2016. The magnet has good stability, low cryogenic heat load, passive cooling, and passive protection. Operational History: Cryostat has remained sealed from fabrication, 4 noted quenches with no change in functionality, only modification in cryogen controls and new power supply

CLEO-II Solenoid Magnet Type Solenoid Number of turns in coil 1281 PARAMETER DESIGN VALUE Magnet Type Solenoid Number of turns in coil 1281 Coil Structure 3 sections of 2 layer helical wound in 8 welded lengths Conductor 5 mm x 16 mm Aluminum stabilized, 11 strand Cu-Nb-Ti Nominal Current (A) 3266 Current Density (MA/m) 1.2 Operating Field (Tesla) 1.5T Field Integral BdL (T-m) 5 Outer Diameter (m) 3 Clear Bore (m) 2.9 Length (m) Coil = 3.5, Cryostat = 3.8 Inductance (H) 4.6 Stored Energy (MJ) 25 Cooling Mode 700 liter liquid Helium dewar using thermal-syphon circulation Insulation high vacuum, liquid Nitrogen cooled radiation shield, superinsulation

CLEO-II Solenoid Cryostat sealed by o-rings between coil collars. Coil forces and coil collars balanced with 4 rods. Return Yoke constructed of 3 layers of 36 cm thick iron, pieced in 8 sectors each.

CLEO-II in Hall A Hall A truck ramp - 1st verified cryostat fits down truck ramp into Hall A 17’ height (5.2m) 6” rollers

CLEO-II in Hall A HRS Target Pivot SoLID HRS Pivot to target -115 cm Target to center of Solenoid – 350 cm SoLID Spectrometer – 730 cm

CLEO-II in Hall A HRS-L SoLID 28’ 58’ HRS-R 82’ Truck Ramp

SoLID Solenoid Return Yoke End cap Donut Coil End cap Bottom Front Cap Coil Collar End cap Nose Coil Collar

SoLID Solenoid Analyzed magnet in 2D POISSON Added End cap, design optimized to function as field clamp, shielding and support for detectors. Kept 8 to 15cm clearance of acceptance from End cap Acceptance angle requirements define need for modification to downstream coil collar Only 2 of 3 yoke return layers needed, allowing fit into Hall A beam line PVDIS 36o PVDIS 21o SIDIS 26o SIDIS 14.7o SIDIS 8o SIDIS 2o PVDIS 3.5o

SoLID Solenoid – Field Data Bz is 1.4 T at center and 0.8 T at exit of coil End cap Donut Collar Upstream Return Yoke End cap Bottom Collar Downstream Coil Front Cap shield End cap Nose

SoLID Solenoid - Field Data B at nominal Cerenkov photon sensor location are around 120G and 50G B at SIDIS forward angle EC photon sensor location is below 100G B at PVDIS forward angle EC photon sensor location is below 500G B > 100G

SoLID Solenoid - Forces Modifications change resultant forces on coil Force direction changes at circled areas Net force on yoke and coils balanced by adjusting location of Front Piece where force varies from 3-5 t/cm (axial force) Radial force acceptable as 30 MPa on Aluminum cryostat, yield of Aluminum at 100 MPa -20.3 171.2 122.9.4 -269.0 8.1 0.7 -238.4 110.2 108.6 -119.2 305.4 6.3 -316.5 -79.6 0.008 0.2 165.5 0.7 0.2 38.9 0.04

Magnet Modifications RETURN YOKE 2 of 3 layers of return yoke needed, keeping saturation under 2 T, allows fit of magnet on Hall A beam line Sectors to be machined to shorten them by 75cm to allow fit of downstream coil collar and endcap. $360k for diamond wire cutting of 24 pieces Return Yoke

Magnet Modifications Coil Collars Upstream coil collar reused from CLEO-II Downstream coil collar to be modified or replaced to allow acceptance angle clearance $500k to replace downstream coil collar and hardware Coil Collar

Magnet Modifications FRONT CAP New pieces to balance forces , provide shielding and field clamp Front cap consists of 16’ diameter x 1.3’ thick plate plus 1.5” plates adjustable for shielding $677k for new fabrication based on 75 tons of steel Front Cap

Magnet Modifications END CAP New pieces required to support detectors, provide field clamp and shielding Fabrication in parts; donut, bottom and nose Parts to split vertically to allow access to detectors 19’ diameter x 0.5’ thickness $1535k for machining 6 parts, based on 152 tons of thick steel and hardware End cap donut End cap bottom End cap nose

Magnet Cost and Labor K$ & FTE Estimates based on volume of material, size machines to handle and Hall D experience

CLEO-II Transport Plan Items available from Cornell: Superconducting magnet, Octagonal iron shielding, Magnet transport frame/cradle, Dynapower DC power supply, Valve control box, Cryogenic bayonets, Data acquisition, Rotation/turning jigs, Steel mounting blocks, Third iron layer steel, plate to support the 700 liter dewar,700 liter dewar, Transfer lines, Readout boxes for strain gauge Disassembled and loaded on trucks for shipping by the Cornell personnel with oversight by Jefferson Lab. It will require 52 trucks to transport the magnet and related equipment. We have identified all of the parts of the CLEO magnet, with sizes and weights, anticipating a need for storage of these parts at Jefferson Lab starting Summer 2016, total weight of 860 tons. The cryostat (16 tons) and power supply will need to be stored in an environment-controlled area of approximately 400 square feet. Jefferson Lab projects the use of the CMSA site for storage of all parts.

Magnet Status 2D POISSON analysis gives preliminary solution of modifications to allow use of CLEO-II Solenoid for SoLID. 3D analysis to be completed in FY15-FY16 to verify design of new parts and quantify the performance parameters of the magnet. Inspection of CLEO-II Solenoid indicates magnet is functional and suitable for use in Hall A. Agreement with Cornell to transfer magnet to JLAB. JLAB preparing for transport to begin in Summer of 2016. Hall A Engineering continues collaboration on magnet and detectors in bi-weekly meetings.

Backup

Cost and Labor Currently, Hall A has manpower of : 2 engineers, 3 designers, 2 engineering associates and 4 technicians. Additional resources to be available within Jlab and through contracting. Hall D magnet and installation similar to SoLID requirements. Hall D labor experience over 3-4 years: Magnet- 5FTE/year Infrastructure- 4FTE/year, Platforms and Supports – 1FTE/year Control System – 2FTE, $400k Steel machining estimated as $4/lb to $6 /lb based on material weight, size and amount of machining. Values taken from recent procurements. Additional $240k plus 5 FTE is costed for disassembly and transport of CLEO-II to Jlab. Cornell to provide labor with oversight by Jlab. Preliminary installation estimate requires 1.5 years for full installation and 14.2 FTE of labor

Hall A Floor Loading 500 ton 500 ton 250 ton SoLID magnet and detectors encompass an area of 5.8 meters in diameter and 7.3 meters long. Clearance to the Hall floor ranges from 10 to 38 cm, sufficient for support. Weight of the CLEO-II magnet, detector hut and detectors is 1300 tons. The floor in this installation region is designed for 250 tons for a 12 square foot pad. SoLID footprint 500 ton 28’ 250 ton 82’ 58’

Magnet Interactions and Field Uniformity A TOSCA calculation was done to study SoLID + Polarized target magnets interactions Forces between magnets are manageable About ~7.7 ton on iron plate in front of SoLID due to 5T coils About ~0.25 ton on the target coil due to SoLID Target and SoLID support structure design will take this into consideration Recent experience with g2p/GEp experiment: Used 5 T polarized target + pair of septum magnets close to target No major problem due to magnet forces Courtesy, R. Wines Field uniformity along the 3 cm target

Cost and Labor for Detector Supports and Hall Infrastructure

CLEO II in Hall A