S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th.

Slides:



Advertisements
Similar presentations
Day 1, Wednesday, 1 st August :00 Discuss charge and agenda, organization 13:30 Joint Session with UCN Working Goup 13:15 UCN Sources Worldwide.
Advertisements

$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
ESLS 04 Daresbury Laboratory
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Blank Jeopardy. Category #1 Category #2 Category #3 Category #4 Category #
Making Numbers Two-digit numbers Three-digit numbers Click on the HOME button to return to this page at any time.
US Particle Accelerator School The Challenges of a Storage Ring-based Higgs Factory William A. Barletta Director, US Particle Accelerator School Dept.
FEL and linac plans at MAX IV laboratory
The BESSY Soft X-Ray SASE FEL (Free Electron Laser)
New 135-MeV injector energy requires minor changes to linac operating point…
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Cryogenik waste heat utilization for DESY and European XFEL 2nd Workshop on Energy for Sustainable Science at Research Infrastructurs Jens-Peter Jensen,
F Project X Overview Dave McGinnis October 12, 2007.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
A.Variola Motivations…from D.Hitlin Talk The polarized positron source.
Vibration Stability Studies of a Superconducting XFEL/ILC Accelerating Module at Room Temperature and at 4.5K R. Amirikas, A. Bertolini, W. Bialowons.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
DESY Deutsches Electron Synchrotron Shima Bayesteh.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
WP8-HGA High Gradient Acceleration M. Biagini (INFN-LNF) WP8 coordinator Tiara Kickoff Meeting, CERN, Feb , 2011.
Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University.
Prospect for an high energy factory at LNF P. Raimondi LNF Apr-10,2008.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
1 st TIARA Steering Committee A. Gallo – INFN Frascati deputy of TIARA WP8 leader STATUS OF TIARA WP8.
Heung-Sik Kang Pohang Accelerator Laboratory
S UPER B SITE OVERVIEW S. Tomassini, INFN-LNF On behalf of SuperB Collaboration.
B u d k e r I N P VEPP-4M tunnel view BINP accelerator facilities J/  and  physics  - lepton precise mass measurement  - physics 5 GeV collider.
Dr Mark Boland Principal Scientist Accelerator Physics AXXS Australian X-band XFEL Source at the Australian Synchrotron On behalf of the Accelerator Science.
SUPERB site status report
SUPERB SITE OVERVIEW C. Sanelli, F. Sgamma, S. Tomassini, INFN-LNF
SUPERB site status report for layout v12
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
SuperB Synchrotron Radiation Source Issues
S. Bartalucci, R. Bedogni , B. Buonomo, A. Esposito , G. Mazzitelli, L
Uppsala Commitment to ESS and FREIA Planning
Status and Interest of the X-ray FEL SINAP
Plans for a Superconducting Proton Linac at CERN
(Potential) Site and Utilities
INJECTION SYSTEM UPDATE
SuperB Injection, RF stations, Vibration and Operations
SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04
SuperB Experimental Hall
Tango status at Elettra
WP 9: Beam-driven plasma acc.
Two color FEL experiment
Measurements, ideas, curiosities
Accelerator Layout and Parameters
Muon Acceleration using 8 GeV Proton Driver Linac
Superbeams with SPL at CERN
XFEL Project (accelerator) Overview and recent developments
Status of the CLIC Injector studies
A Superconducting Proton/Electron Linac
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Maintenance at ALBA facility: Strategy for the conventional services
Overview of Day One – 29 Feb 2016
ATF project meeting, Feb KEK, Junji Urakawa Contents :
AC Power for a Super-B Factory
Super-B Accelerator Overview
Super-B Factory in a “4400m” Tunnel
Polarization at the Super-B Factory
J. Seeman Perugia Super-B Meeting June 2009
Jiquan Guo, Haipeng Wang
Presentation transcript:

S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th

Outline The Torvergata Site Preliminary Geological Analysis SPARX project SuperB project SPARX-SuperB synergy Conclusions

The TORVERGATA Site Torvergata AREA for the SuperB and SPARX Projects

Roman Villa Sport City University Campus CNR SPARX & SuperB

SPARX 1 st stage SuperB LINAC SPARX future

S.1 S.2 S.3 S.4 S.5 Formed by the Colli Albani volcano more than years ago Very Stable volcanic rock Geological analysis Soil Sea Level Altitude (m) Brown Pyroclastic Rock Gray Pyroclastic Rock Preliminary

Seismic map ngv.it/documenti/mapp a_opcm3519.pdfhttp://zonesismiche.mi.i ngv.it/documenti/mapp a_opcm3519.pdf Maximum ground acceleration, with a 10% probability of exceeding it in 50 years.

SPARX-FEL SOURCE PULSED SELF AMPLIFIED RADIATION X Composed by: One LINAC at 1.2 GeV and 2.4 GeV Three Undulators Lines Six Experimental Lines

SPARX-FEL: mid energy LINAC Emergency Exit Electrical Substation Room for Cooling plant Room for Air conditioning

SPARX-FEL: undulator hall

SPARX-FEL: experimental hall

SPARX SuperB: LINAC Tunnel Ground Level Modulators & Klystrons Tunnel LINAC Tunnel 400 m 5 m 4 m 5 m 600 m 500 m

SuperB: Damping Ring Damping Ring 200 m 20 m 18 m

SuperB: Storage Rings Tunnel 600 m 500 m 5.8 m It will be tunneled by means of a tunneling machine, the same that is now tunneling the C-line subway in Rome

SuperB: Storage Rings Tunnel Occupancy 4.5 m 2 m 0.7 m0.4 m 0.7 m

SuperB: Electrical Substations 9 electrical substations for SuperB 2 electrical substations for SparX about 40 Mw total electrical power needed

SuperB: Experimental Hall & Transfer Line - +

SPARX future

Conclusions The feasibility study of the SuperB project on the Torvergata site has been done. A preliminary geological study of the area has given excellent results on the stability of the site. A strong synergy with the SPARX-FEL project exists, giving the possibility of using the SuperB LINAC as the injector of the fel.