Contamination Control

Slides:



Advertisements
Similar presentations
IAEA Training in Emergency Preparedness and Response Module L-051 General Concepts of Exercises to Test Preparedness Lecture.
Advertisements

Radioisotope Laboratory Techniques Day 2 Environmental Health & Safety Radiation Control & Radiological Services UNIVERSITY OF FLORIDA RADIATION SAFETY.
Radiation Safety Training Lab Survey Program Washington State University Radiation Safety Office.
Radiological Emergency Procedures FOR ALL ISOTOPES 1.Prevent others from entering the affected area or coming into contact with the potentially radioactive.
Radiation Protection Technology Respiratory Protection Air Sampling Radiological Safety and Response RPT-243-PE-6.
SUR 111 Establishing the Sterile Field. Skill Assessments Continue with the following skill assessments from Lab #4: 12-1 Surgical Hand Scrub Dry, Gown,
Critical Task Based Job Hazard Analysis Example Step 1: As part of the Walkdown Start with the major work activities and list them as tasks in the JHA.
Intermediate SFFMA Objectives: – Hrs received.
Radiation Protection Technology Posting Radiological Safety and Response RPT-243-PE-4.
Shop Safety How to work safely.
Welcome to Gen Chem Lab This entire presentation will be posted on the Gen Chem Website!
Fall Protection and Ladder Safety Training
DRAFT Annual Industrial Fire School Site/Class Safety Plan Discussion.
Fall Protection and Ladder Safety Training. Course Outline  Introduction  Fall Protection  Ladder Safety  Wrap-up.
Environmental Health and Safety Radiation Control and Radiological Services.
Intervention for Chronic and Emergency Exposure Situations Basic Concepts of Emergency Preparedness Personal Protective Equipment, Devices and Procedures.
Radioisotope Laboratory Techniques Day 1 Environmental Health & Safety Radiation Control & Radiological Services UNIVERSITY OF FLORIDA RADIATION SAFETY.
October Module 8: Training Non-Certified Renovation Workers Certified Renovators are responsible for teaching lead-safe work practices to non-certified.
Radiation Survey & Frisking
Environmental Safety Plans
Hospital Management of RAM Contaminated Patients René Michel, M.S., RSO VA San Diego Healthcare System, La Jolla, CA
Radiation Protection Technology High Radiation Area Access and Control Radiological Safety and Response RPT-243-PE-7.
Safety in the Science Classroom Science teachers have a unique, added classroom management responsibility. We encourage students to purposely use and manipulate.
October Module 7: Training Non-Certified Renovators Certified Renovators are responsible for teaching lead-safe work practices to non- certified.
Laboratory Safety and Laboratory Equipment.
Student Safety Orientation. Origin of Safety Rules School Rules Classroom/Laboratory Rules Lab Safety Rule Agreement National Science Education Standards.
PERSONAL PROTECTIVE EQUPMENT  To define personal protective equipment requirements and indications for use in patient care PURPOSE.
Radiation Survey & Frisking
Posting Radiological Safety and Response RPT-243-PE-4.
BCCO PCT #4 PowerPoint Texas Commission On Law Enforcement ADVANCED INSTRUCTOR COURSE # 1017 UNIT THREE.
Elements of Effective Behavior Based Safety Programs
1 [CMP001 Computer Orientation I] Course Guide Ms. Wesal Abdalfattah office#: 357 Ext#: 8612 Prince Sultan University,
TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1.
Controlled Zones and Limits. Upon completion of this lesson, the participants will demonstrate their knowledge and understanding of the information by.
Range Exercise Schematics Layout / Description. Preparation of the Student Deliver briefing on each exercise to be performed and learning outcomes. Establish.
Classroom Procedures: In accordance to our school policy, please follow the procedures to maximize below classroom productivity.   1. Remain in your assigned.
Procedure Writing ALARA Radiological Safety and Response RPT-243-PE-2.
Program Objectives n Define “Decontamination”. n Identify the steps in the decon process. n Demonstrate, by building, a decontamination reduction zone.
Radiation Protection Technology Contamination Control Radiological Safety and Response RPT-243-PE-5.
Advanced Instructor Course. Task Analysis Presented By.
Environmental Cleaning Tool Kit
Doffing PPE Level One Will need a second donned associate that is a trained observer. This associate will monitor and help by reading each step.
RPT Competencies Radiological Safety and Response RPT-243-PE-9.
Contamination Control Radiological Safety and Response RPT-243-PE-5.
Mold Awareness Training
CO249 Risk Register is found by the entry Doors, please read and familiarise yourself with the Risks and Controls required in this Room Risks in this Room.
Lecture (13): Hazardous Waste Management
Don’t Get Flushed – Proper Toileting/Diapering Procedures
PUASAR015A Crew small powercraft in a rescue operation.
Program Objectives Define “Decontamination”.
Occupational Radiation Protection during High Exposure Operations
Safety A top priority!.
AM218 Risk Register is found by the entry Doors, please read and familiarise yourself with the Risks and Controls required in this Room Risks in this Room.
CO239 Risk Register is found by the entry Doors, please read and familiarise yourself with the Risks and Controls required in this Room Risks in this Room.
Radiological Work Planning
Safety Stuff.
STEM SAFETY.
Section 26 General Safety
Personal Protective Equipment
Safety is part of our culture at Halliburton
Instructions for Wipe Testing for Radioactive Material Contamination
Oleh : Ir. Sjaifuddin Thahir, MSc.
Provide Job Coverage for Radiography RP03.09
SAFETY STANDARDS FINAL JEOPARDY
Radiological Work Planning
Sterile Technique.
Disaster Site Worker Safety
ONTARIO COUNCIL FOR TECHNOLOGY EDUCATION
CO249 Risk Register is found by the entry Doors, please read and familiarise yourself with the Risks and Controls required in this Room Risks in this Room.
AM409/CO250 Risk Register is found by the entry Doors, please read and familiarise yourself with the Risks and Controls required in this Room Risks in.
Presentation transcript:

Contamination Control Radiological Safety and Response RPT-243-PE-5 Contamination Control RPT-243-PE-5 Contamination Control ACAD-08-006: none DOE: none Duration: 2.5 hour Material Resources Needed: Count Down ALARM Clock PPT; Access to Room 508 and 509; 1 copy of the Previous General Area Survey of 509 for each team; 1 copy of RWP-201X-243-5; 1 copy of Student Guide for each team; one INSTRUCTOR GUIDE for RPT-243-PE-5; TEAM Dose Tracking Form; Equipment/Supplies: Overhead display for PowerPoint; Survey meter for each team; Frisker set-up at RCS exit; dosimetry and badge for each team member going into RCA; stanchions, rope, posting material, side-cutters. Assessment/Evaluation: Performance tasks will be assessed here – cognitive objectives will be assessed in examination number 2. Formal performance assessment is completed at the conclusion of the course. References Used in Development: Basic Radiation Protection Technology, 5th edition, Gollnick; ISBN 0-916339-11-4 Nuclides and Isotopes/Chart of the Nuclides, 16th edition, Baum, Knox, Miller; ASIN: B000BUNFS8 10CFR20 10CFR835

11/12/2018 Learning Outcomes Upon completion of this lesson, the student will be able to (cont’d): Demonstrate the ability to perform a radiological survey including: Pre-survey preparations Operational checks on survey instruments General area radiation and contamination surveys Work area radiation and contamination surveys Counting loose surface contamination surveys using a GM frisking instrument converting cpm to dpm/100 cm2 and dpm/LAS

11/12/2018 Learning Outcomes Upon completion of this lesson, the student will be able to (cont’d): Demonstrate the ability to perform a radiological survey including: Surveying items for contamination with a GM frisking instrument Documenting the results Recommendations of posting adjustments based on the results

11/12/2018 Learning Outcomes Upon completion of this lesson, the student will be able to (cont’d): Demonstrate acceptable behaviors when in and upon exiting a contamination area, including: Proper wearing and removal of appropriate contamination control clothing Proper contamination control techniques that minimize cross contamination Proper use of the step-off pad for exiting and for removal of material Demonstrate the proper use of personnel dosimetry

Outline Explanation Mini-Lecture Dress-Out and Bagging Techniques Section 1 – Contaminated Area Entry and Survey Section 2 – Investigation for Contamination Control Problems Time should not be as critical; however, you must still ensure that teams do not prolong the tasks. Use the PPT timer alarm. It will help keep you on track to ensure the PE can be completed. It also permits the illustration of time pressure on task performance. However, ensure you stress that time pressure should never take priority over doing the job safely.

Explanation The same team assignments made in PE-1 will continue into this PE. This PE has two sections. The first section involves the teams entering a contaminated area and performing a contamination survey. The second section involves the teams visually inspection an area to determine contamination control problems. Because all RPT Lab periods are limited to 18 students, for a full lab period, you should have a maximum of 4 – 4 person teams and 1 – 2 person team.

Explanation The teams will be held accountable for the use of proper three-part communication and human performance tools during the PE. The exercise will start with a mini-lecture on proper PC use and bagging techniques for contamination control. A short briefing for the scenario. At the conclusion of the practical portion, a team debrief may be held if time permits.

PC Techniques

In General… Each station issues procedures that describe the details of their personal protective clothing standards. Other techniques may be stipulated through training, department policy or “standing orders” such as: When disposable PCs are required or Alternate dressing and undressing techniques developed locally The use of tape vs. launderable items

The ATC-RPT Standard For the purposes of our PEs, the PC standards that will be used are shown in the following pictures and as described here: Unless specifically directed, joints are not taped The wet paint technique is observed for SOP barrier ropes and tape All items leaving a posted contaminated area must be surveyed clean or bagged – except an individual’s EAD. Cuff all bags for transferring at SOPs.

The ATC-RPT Standard For the purposes of our PEs, the PC standards that will be used are shown in the following pictures and as described here: The EAD is to be worn in a whirl pack in the chest pocket of the PC coveralls The TLD and security badge are worn under the coveralls but within one hand’s breadth of the EAD.

The ATC-RPT Standard For the purposes of our PEs, the PC standards that will be used are shown in the following pictures and as described here: Upon exiting the Contaminated Area: Before removing the gloves, squeeze the EAD out of the whirl-pack onto the edge of the SOP Upon stepping on the SOP, place the EAD on the lanyard with the TLD Frisk the combo when a hand, foot, and face frisk is done

The ATC-RPT Standard Portable instrumentation taken into posted Contaminated Areas shall be wrapped or bagged in clear plastic to prevent cross contamination. The Instrument wrapping may be wiped with a Maslin upon removal from the CA.

Overlap Joints Use tape only as directed by the Instructor

Dosimetry

Dosimetry

Transfer Across Boundary

Cuff the Bag

Extend Across the Boundary Tape

Place Item into the Bag From Inside the Area

Close the Bag

Close the Bag

Protect the Instruments

Section 1 Contaminated Area Entry and Survey

Instructions Timed Follow the Student Guide as a procedure.

Section 2 Investigate Low Level Shoe Contaminations

Instructions Follow the Student Guide as your instruction.

Section 3 Frisk, Complete Documentation

Instructions Follow the directions in the Student Guide

What Are Your Questions ?