External Projects related to WG 6

Slides:



Advertisements
Similar presentations
Page 1© Crown copyright 2007SRNWP 8-11 October 2007, Dubrovnik Draft Interoperability Proposal Terry Davies SRNWP Meeting October 8-11, 2007.
Advertisements

© Crown copyright Met Office SRNWP Interoperability Workshop, ECMWF January 2008 SRNWP Interoperability Alan Dickinson Met Office.
ALADIN view of the way forward J.-F. Geleyn, ALADIN PM (also for F. Bouttier, C. Fischer and M. Janoušek) EUMETNET SRNWP Interoperability Workshop, Reading,
© Crown copyright Met Office SRNWP Interoperability Workshop, ECMWF, January 2008 SRNWP Interoperability Terry Davies Met Office.
UPDATING TABLE DRIVEN CODE FORMS 18 April 2006 (Joël Martellet, WMO, World Weather Watch, Data Processing and Forecasting Systems)
Deutscher Wetterdienst Status of the Support Activities and WG 6 Activities COSMO Working Group 6: Reference Version and Implementation Working Group Coordinator:
Expert Team on System Aspects and Interoperability Programme Glenn Greed, UKMO, Project Manager Interoperability Ulrich Schättler, DWD, Chairman of the.
Interoperability between the European NWP modelling systems Ulrich Schättler, François Bouttier, Xiaohua Yang, Radmila Brozkova, Alan Radford A Report.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Parametrization of Subgrid-Scale Orographic Drag in the.
Science Plan and SPM report COSMO General Meeting, 9 September 2010.
Pursuing Faster I/O in COSMO POMPA Workshop May 3rd 2010.
Page 1© Crown copyright 2007SRNWP 8-11 October 2007, Dubrovnik SRNWP – Revised Verification Proposal Clive Wilson Presented by Terry Davies at SRNWP Meeting.
Page 1© Crown copyright 2005 SRNWP – Revised Verification Proposal Clive Wilson, COSMO Annual Meeting September 18-21, 2007.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Report from the Scientific.
Experience with COSMO MPI/OpenMP hybrid parallelization Matthew Cordery, William Sawyer Swiss National Supercomputing Centre Ulrich Schättler Deutscher.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Operational COSMO Demonstrator OPCODE André Walser and.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss News from COSMO COSMO User Workshop 2010.
Status of COSMO Software and Documentation Ulrich Schättler Deutscher Wetterdienst COSMO Annual Meeting 2003.
Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Deutscher Wetterdienst Status of the Support Activities, and other WG6 Issues COSMO Working Group 6: Reference Version and Implementation Working Group.
9th COSMO General Meeting September 2007 Athens (Greece) Programme Short-Range NWP Report of the Programme Manager.
Soil moisture generation at ECMWF Gisela Seuffert and Pedro Viterbo European Centre for Medium Range Weather Forecasts ELDAS Interim Data Co-ordination.
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Status of the COSMO-Model Package Ulrich Schättler.
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
Deutscher Wetterdienst Consolidation of the software for the generation of External Parameters and extension with new raw data sets Hermann Asensio.
COSMO – 09/2007 STC Report and Presentation by Cosmo Partners DWD, MCH, USAM / ARPA SIM, HNMS, IMGW, NMA, HMC.
Status of the COSMO-Software and Documentation WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache, Bogdan Maco National Meteorological Administration of Romania.
Changes to COSMO Software and Documentation Ulrich Schättler Deutscher Wetterdienst COSMO Annual Meeting 2004.
Interoperability Summary of Key Technical Issues.
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
TIGGE LAM – some issues related to interoperability aspects Tiziana Paccagnella Interoperability – ECMWF Reading January.
Deutscher Wetterdienst COSMO-Standards for Source Code Development A Discussion COSMO Working Group 6: Reference Version and Implementation Working Group.
Vincent N. Sakwa RSMC, Nairobi
Agreements on... Interim ELDAS Data coordination meeting Time schedule for soil moisture production –Submission of results for two month period –Preparation,
Deutscher Wetterdienst Consolidation of software for the generation of External Parameters and extension with new raw data sets Hermann Asensio.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
Deutscher Wetterdienst Implementation of GRIB2 A Discussion COSMO Working Group 6: Reference Version and Implementation Working Group Coordinator: Ulrich.
Data services: Archiving of UERRA data in MARS and dissemination Richard Mládek, Manuel Fuentes, Shahram Najm, Sebastien Villaume, Enrico Fucile (ECMWF)
© Crown copyright Met Office EUMETNET- SRNWP verification programme -Met Office Responsible member Clive Wilson – Project manager 31st EWGLAM/16th SRNWP.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache National Meteorological Administration of Romania.
School on Grid & Cloud Computing International Collaboration for Data Preservation and Long Term Analysis in High Energy Physics.
1 The Interactions of Aerosols, Clouds, and Radiation on the Regional Scale.
Operational COSMO of MeteoSwiss
Overview on the Work of WG 6
The COSMO Coding Standards Some Highlights
Status of the COSMO-Software and Documentation
Summary of WG6 activities
PT Evaluation of the Dycore Parallel Phase (EDP2)
PP POMPA status Xavier Lapillonne.
Overview of the COSMO NWP model
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
DG Environment, Unit D.2 Marine Environment and Water Industry
Discussion HPC Priority project for COSMO consortium
PASC PASCHA Project The next HPC step for the COSMO model
and news about our activities
GRIB2 and ecCodes in the COSMO-Model
IPET-OPSLS/CCl-17 relevant issues before EC-70
X-DIS/XBRL Phase 2 Kick-Off
Ulrich Schättler Source Code Administrator
SRNWP-PEPS COSMO General Meeting September 2005
IPET-DD-1 meeting Feb 2019 Thorsten Busselberg -DWD
IPET-DD-1 meeting Feb 2019 Thorsten Busselberg -DWD
The COSMO Coding Standards Some Highlights
Guidelines for future developments Tiziana Paccagnella, ARPA-SIM
Preparing a new Model Version according to Source Code Management
Support Activities and WG 6 Overview Status Report
Presentation transcript:

External Projects related to WG 6 COSMO Working Group 6: Reference Version and Implementation Working Group Coordinator: Ulrich Schättler

Contents Interoperability Priority Project POMPA: Performance On Massively Parallel Architectures 06.09.2010 COSMO General Meeting 2010

Status of the Interoperability Programme Ulrich Schättler DWD Philipp Glatt MeteoSwiss

Idea of Interoperability To support future collaborative effort in European Limited Area Modelling by: Defining a standard output format Providing software tools (adaptors) to convert LAM output to the standard format Enabling European LAMs to run from appropriate alternative model fields To display or use in NMHS post-processing system To provide operational backup 06.09.2010 COSMO General Meeting 2010

Plans for the Adaptor Fieldextra For Parameter List 1: ps, psml, t2m, td2m, … GME UM ARPEGE IFS Fieldextra Read (Write) Grib 2 and transform to COSMO-Model grid: only 2D fields COSMO UM_local ALADIN HIRLAM 06.09.2010 COSMO General Meeting 2010

Plans for the Adaptor GFS? GSM? INT2LM For Parameter List 2: u, v, w, t, p, qx, … GME ARPEGE to be done status unclear GFS? GSM? INT2LM Read (Write) Grib 2 and transform to COSMO-Model grid: 2D fields, full atmosphere, soil parameters COSMO ALADIN HIRLAM 06.09.2010 COSMO General Meeting 2010

lum2lm (Grib1): Temperature (lowest COSMO Level) from GME IFS UM Aemet UM DWD 06.09.2010 COSMO General Meeting 2010

lum2lm (Grib1): PP from reference pressure (lowest level) from GME IFS UM Aemet UM DWD 06.09.2010 COSMO General Meeting 2010

lum2lm (Grib1): Wind speed (lowest level) from GME IFS UM Aemet UM DWD 06.09.2010 COSMO General Meeting 2010

Workshop in Reading In December 2009, the “Interoperability Team” met in Reading for discussing last years work and do some planing for 2010. The first 2 deliverables were finally agreed: The Standard Format shall be the native grid and native parameters Documentation supplied with the standard format should be the minimum required Some Grib 2 Issues were discussed: There is a problem with coding the vertical coordinate / vertical grid of COSMO in Grib 2 (see tomorrows session on Postprocessing) 06.09.2010 COSMO General Meeting 2010

Work in 2010 Vertical coordinate / vertical grid of the COSMO-Model A COSMO-internal discussion about coding the vertical grid in Grib2 has been initiated early 2010 For the Gal-Chen height based hybrid coordinate it is possible to code the grid with typeOfLevel=118, the corresponding orography (as a 2D field) and vertical coordinate parameters This is NOT possible for e.g. the SLEVE coordinate The COSMO discussion led to a proposal to the WMO Commission for Basic Systems (IPET-DRC: Inter-Programme Expert Team on Data Representation and Codes). A new vertical coordinate type is proposed, where no vertical coordinate parameters together with a 2D field are given, but a full 3D field with the heights of every grid point is specified. The proposal has been discussed also with Enrico Fucile (ECMWF) 06.09.2010 COSMO General Meeting 2010

Work in 2010 grib_api grib_api has been established at some COSMO centres to be the official Grib(2) library (DWD, MeteoSwiss, ARPA-SIM Bologna) Work is in progress to improve performance on NEC machines (together with NEC, MeteoFrance and ECMWF) It has been implemented in FieldExtra for reading and writing. FieldExtra therefore can now produce the parameters of the standard output format list directly Work is in progress, to implement it into INT2LM 06.09.2010 COSMO General Meeting 2010

Work in 2010 New Grib 2 test data set and documentation A new Grib2 test data set, which has been produced by FieldExtra, has been provided. This still has the old (Grib1-style) coding of the vertical coordinate No Grib2 test data has been provided with typeOfLevel=118, because this might not be the default case any more (if proposal is accepted) No surface test data (according to the guidelines from the ET on Surface Aspects) has been provided up to now The minimum required level documentation has not been updated according to the plans from last workshop describe native grids describe fields in the standard output list: what field is it, what does it represent in the generating model 06.09.2010 COSMO General Meeting 2010

06.09.2010 COSMO General Meeting 2010

06.09.2010 COSMO General Meeting 2010

Priority Project POMPA Performance on Massively Parallel Architectures (To be confirmed by STC) Project Leader Oliver Fuhrer MeteoSwiss

Background: Future Computer Architectures Computer architectures are about to change. Multi-core, many-core systems are on their way. Many people talk about General Purpose GPUs. But first: Identify the problems of the COSMO-Model on existing machines! NEC SX-9 8 Procs IBM pwr6 256 procs Computations Dynamics 729.59 570.44 Computations Physics 506.18 220.45 Communications 115.61 207.69 I/O 124.43 108.40 % of I/O and Comm. 15 25 06.09.2010 COSMO General Meeting 2010

Investigations from Fraunhofer / SCAI on BlueGene with RAPS 4.1 Fraunhofer / SCAI investigated LM_RAPS_4.0 on IBM BlueGene The RAPS code is not as optimized on NEC SX-9 as the current operational model is Timings for COSMO-DE 421  461  50 grid points, dt=25 s Modern architectures surely are more similar to BlueGene than they are to SX-9 There are problems in the I/O and the overall scalability! 06.09.2010 COSMO General Meeting 2010

Scalability of COSMO-EU: 665  657  40, 24h 06.09.2010 COSMO General Meeting 2010

Scalability of COSMO-DE: 421  461  50, 21h 06.09.2010 COSMO General Meeting 2010

Scalability of COSMO-Europe: 1500 1500  50, 2.8 km, 3 h, no output 06.09.2010 COSMO General Meeting 2010

The Problems of the COSMO-Code … I/O: Accessing the disks and the global communication involved disturbes scalability heavily. Although the communications besides I/O are almost all local, the speedup degrades when using many processors. What cannot be seen on the pictures before: Although the speedup of the computations is not bad, the efficiency of the code is not satisfying: NEC SX-9: 13 % of peak IBM pwr6: about 5-6 % of peak Cray XT4: about 3-4 % of peak (?) 06.09.2010 COSMO General Meeting 2010

More Background Swiss national initiative HP2C High Performance High Productivity Computing Plan: Enable software to run efficiently on new computer architectures (multi-core, many-core, GP-GPUs, etc.) ETH Zürich is taking part with the COSMO-CLM: HP2C-CCLM This project has 3 subtasks Cloud-resolving climate-change scenarios Preparing the CCLM and existing model extensions for future computers Refactoring CCLM components for emerging architectures HP2C-CCLM runs from Spring 2010 to December 2012 06.09.2010 COSMO General Meeting 2010

Finally: PP POMPA POMPA is the „missing link“ between the Swiss national initiative and our consortium POMPA gives additional resources in the optimization of the COSMO-Model for future computer architectures POMPA can ensure that the operational COSMO-Model really benefits from the outcomes of HP2C-CCLM 06.09.2010 COSMO General Meeting 2010

Thank you very much for your attention 06.09.2010 COSMO General Meeting 2010