Chapter 7 Capacity Planning and Management

Slides:



Advertisements
Similar presentations
Manufacturing Planning and Control
Advertisements

Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Chapter 7. Capacity Planning and Management
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Manufacturing’s Objectives
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Perencanaan Kapasitas Produksi
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Supplement D Master Scheduling and Rough-cut Capacity Planning
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Production and Service Systems Operations
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Material Requirements Planning
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
Production Planning and Control Introduction
Manufacturing Planning and Control
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Aggregate Planning and Resource Planning Chapters 13 and 14.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Production Activity Control
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
Aggregate Planning and Resource Planning Chapters 13 and 14.
CAPACITY MANAGEMENT Nyoman Pujawan.
Activity Scheduling and Control
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
Capacity Planning and Utilization
AXUG Partner Showcase – Introducing Preactor
Master Production Scheduling (MPS)
Manufacturing Planning and Control
FDFPLSCP4A Manage and schedule production
Facility Inventory Old Facilities Modern Facilities Classroom Size
COMPUTER INTEGRATED MANUFACTURING
Capacity: Matching Productive Resource to Demand
Chapter 14 Aggregate Planning.
PRODUCTION ACTIVITY CONTROL (PAC)
Cost Accounting and Reporting Systems
Synchronous Manufacturing and Theory of Constraints
Constraint Management
Introduction to Materials Management
Chapter 5 Master Production Scheduling
13 Aggregate Planning.
PRODUCTION ACTIVITY CONTROL (PAC)
Manufacturing Planning and Control
Material Requirements Planning (MRP)
MRP and ERP.
OUTLINE Questions? Quiz Discuss homework New Homework Start MRP.
14 MRP and ERP.
Capacity Planning.
Operations Management
Incorporating lot sizing into MRP
Manufacturing Planning and Control
Capacity and Aggregate Planning
Theory of Constraints Part II: TOC Concepts
Manufacturing’s Objectives
Aggregate Production Planning (APP)
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Synchronous Manufacturing and Theory of Constraints
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Chapter 7 Capacity Planning and Management

Capacity Planning and Management Capacity planning and management addresses two managerial problems: Matching capacity to plans–by either providing sufficient capacity to execute the plan or adjusting the plan to meet available capacity. Consider the marketplace implications of faster throughput times–at the expense of reduced capacity utilization.

Role of Capacity Planning in MPC The primary objective of capacity planning techniques is to estimate capacity requirements early enough to be able to meet those requirements Flawless execution of the capacity plan allows the firm to avoid unpleasant surprises Insufficient capacity leads to deteriorating delivery performance Excess capacity may be a needless expense

Capacity Planning in the MPC System Resource planning Sales and operations planning Demand management Long Range Resource planning Master production scheduling Rough-cut capacity planning Medium Range Detailed material planning Capacity requirement planning Material and capacity plans Short Range Finite Loading Shop-floor systems Supplier systems Input/output analysis

Links to other MPC System Modules Resource Planning Linked to sales and operations planning (SOP) Converts SOP data to aggregate resource units Rough-Cut Planning Linked to Master Production Schedule (MPS) Estimates capacity requirements of MPS Capacity Requirements Planning Linked to material requirements planning (MRP) Prepares detailed capacity plan based on time-phased material plans Finite Loading Linked to material planning and shop floor control Considers adjustment of plans due to capacity utilization Input/output Analysis Linked to shop floor control Monitors actual consumption of capacity during execution of detailed material planning

Capacity Planning Using Overall Factors (CPOF) Capacity Bills Resource Profiles Capacity Requirements Planning Capacity Planning and Control

Capacity Planning Using Overall Factors (CPOF) Simplest rough-cut capacity planning approach Data inputs from master production schedule Based on planning factors from historical data (work center utilization, production standards) Overall labor- or machine-hour capacity requirements are estimated from MPS data Estimate is allocated to work centers based on historical workloads Inherent inaccuracies may limit usefulness

CPOF Example Total required capacity = (33*0.95)+(17*1.85) = 62.80 Work center capacity = Historical percentage*Total required capacity

Capacity Bills Rough-cut capacity planning method that provides more direct link to individual end products Bill of capacity indicates total standard time to produce one unit of an end product (by work center) Master production schedule data is then used to estimate capacity requirements for each work center Requires more data than CPOF procedure

Capacity Bill Example Total hours include both std. run time and std. setup time Std. Setup hours are spread over the standard lot size

Capacity Bill Example MPS quantities are multiplied by bill of capacity to determine work center capacity requirements by period

Resource Profiles Rough-cut capacity planning technique that includes production lead time information Provides time-phased projections of capacity requirements for individual work centers More sophisticated approach but requires tracking of relatively short time periods (< 1 week)

Resource Profile Example Production of one unit of product A in period 5 requires production activity in periods 3, 4, and 5 and in work centers 100, 200, and 300

Resource Profile Example Requirements (by work center and period) for one unit of end product are multiplied by the MPS plan to determine capacity requirements These requirements are then summed over all periods to finalize the process

Capacity Requirements Planning (CRP) Capacity requirements planning differs from the rough-cut planning procedures Utilizes time-phased material plan from MRP Takes into account materials in inventory Accounts for the current status of work-in-process Accounts for service parts and other demands not accounted for in the MPS Requires more inputs and more computational resources

Capacity Requirements Planning Example Detailed MRP Data Scheduled/planned quantity multiplied by processing time for work center This process is repeated for each work center to complete the plan

Scheduling Capacity and Materials Simultaneously Capacity requirements planning doesn’t consider capacity when planning materials Assumes that capacity can be adjusted, given sufficient warning Planning capacity and materials at the same time allows construction of a plan that works within current capacity constraints

Finite Capacity Scheduling Simulates job order start and finish times in each work center Establishes a detailed schedule for each job in each work center When a work center’s capacity is not sufficient for all planned jobs, prioritization rules determine which jobs will be shifted to later times

Finite Capacity Scheduling Product A does not consume all available capacity Combination of all products consumes all available capacity in several periods Planned orders are shifted to stay within capacity limitations

Work Center Scheduling Vertical Loading–each work center is scheduled job by job without consideration of other work centers Increases capacity utilization but may result in more partial job completion Horizontal Loading–jobs are scheduled through all work centers in order of priority Lower capacity utilization but generally a higher proportion of jobs are completed in a shorter time span (higher customer service levels)

Finite Capacity Scheduling The FCS plan is a simulation Randomness leads to actual times that don’t match scheduled times Should the work center wait for a job that isn’t available on time (idleness = lost capacity) Over time, the accuracy of the plan deteriorates Frequent rescheduling may be needed to maintain accuracy Rescheduling process is computationally expensive

Advanced Production Scheduling (APS) Expands Finite Capacity Scheduling to the entire product structure (end products and sub-assemblies) Can lead to a significant reduction in lead times Requires accurate scheduling parameters, flawless execution, and prompt recovery from any problems

Management and Capacity Planning/Utilization Capacity Management Management and Capacity Planning/Utilization Capacity monitoring with input/output control Managing bottleneck capacity Capacity planning in the MPC system Choosing the measure of capacity Choice of specific techniques Using the capacity plan

Capacity Monitoring with Input/Output Control Planned inputs are determined by the capacity planning process Planned outputs depend upon the nature of the work center Capacity-constrained–planned output is determined by the processing rate of the work center Non-capacity-constrained–planned outputs match planned inputs Differences between plan and actual must be addressed (management by exception)

Capacity Planning in the MPC System Short-term capacity planning problems can be reduced by well-executed production and resource planning Efficient use of sufficient capacity by a good shop-floor system reduces capacity issues

Choosing the Measure of Capacity Capacity can be measured in many ways Labor hours, machine hours, physical units, monetary units The firm’s needs and constraints should determine the capacity measure Trends Shrinking portion of direct labor Less clear distinctions between direct and indirect labor Reduced ability to change labor capacity Outsourcing Flexible automation/cellular technologies

Choice of a Specific Planning Technique Rough-cut methods CPOF Capacity bills Resource profiles Most general Widely applicable Easier to implement but less powerful Useful in JIT situations Capacity requirements planning Requires more data and computational effort Only applicable in conjunction with MRP Unnecessary under JIT APS Systems Highest levels of effort High levels of accuracy possible with good data and flawless execution

Using the Capacity Plan Two broad choices are available when actual capacity and plan are mismatched Change capacity–reduce or increase capacity as indicated (within constraints) Revise material plan–change requirements and/or timing to match available capacity The amount of material that can be produced is limited by the available capacity, regardless of the material plan

Principles Capacity plans must be developed concurrently with material plans if the material plans are to be realized. Capacity planning techniques must match the level of detail and actual company circumstances. Capacity planning can be simplified in JIT environments. Better resource and production planning processes lead to less difficult capacity planning processes. Better shop-floor systems reduce the need for short-term capacity planning.

Principles More detailed capacity planning systems demand more data and database maintenance. When capacity does not match the requirements, it isn’t always capacity that should change. Capacity must be planned, but use of capacity must also be monitored and controlled. Capacity planning techniques can be applied to selected key resources. Capacity measures should reflect reasonable levels of output from key resources.