SRF Pb/Nb photoinjector; recent results

Slides:



Advertisements
Similar presentations
BERLinPro P. Kuske. P. Kuske, ESLS08 2 BERLinPro: The German ERL Test Facility BERLinPro* (Berlin Energy Recovery Linac Prototype) Proposal for the construction.
Advertisements

Slice emittance measurements at HZDR and Pb cathode SRF gun at HZB | T. Kamps | HZB | WP10.7 Slice emittance measurements at HZDR and Pb cathode SRF gun.
ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
BERLinPro The Berlin Energy Recovery Linac Project Why, How and Status
Progress of SRF and ERL at Peking University Lu Xiangyang Institute of Heavy Ion Physics Peking University.
Institute of Radiation Physics Jochen Teichert Forschungszentrum Dresden-Rossendorf Radiation Source ELBE J. Teichert, A. Arnold, H. Büttig,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
Photocathode 1.5 (1, 3.5) cell superconducting RF gun with electric and magnetic RF focusing Transversal normalized rms emittance (no thermal emittance)
WP10.6 Advanced Photocathodes Developement DESYJacek Sekutowicz HZBThorsten Kamps HZDRJochen Teichert IOE MUTHenryk Fiedorowicz IPJRobert Nietubyć BNLJohn.
Low Emittance RF Gun Developments for PAL-XFEL
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Deposition of Pure Lead Photo-Cathodes by Means of UHV Cathodic Arc
Plasma pulsed irradiation preparation of lead coated photocathodes Robert Nietubyć on behalf of the Collaboration Narodowe Centrum Badań Jądrowych Świerk.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
Institute of Radiation Physics Jochen Teichert Forschungszentrum Dresden-Rossendorf Radiation Source ELBE J. Teichert, A. Arnold, H. Büttig,
Superconducting electron gun for CW operation of superconducting linacs Narodowe Centrum Badań Jądrowych Świerk National Centre for Nuclear Studies Robert.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
SRF Gun Development for BERLinPro | T. Kamps | SRF Gun Development for BERLinPro T. Kamps | Ultra Bright.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
O. Kugeler – TTC Meeting February 28 – March – Milano, Italy TTC-meeting Februar 28 – March – Milano, Italy O. Kugeler (based on talk given.
ELBE SRF Gun Testing Status PeterKneisel (JLAB) For the Rossendorf Team A.Arnold,P.Murcek,J.Teichert,P.Michel,P.Lu, H.Vennekate,R.Xiang T.Kamps (HZB Berlin)
THE ANDRZEJ SOŁTAN INSTITUTE FOR NUCLEAR STUDIES INSTYTUT PROBLEMÓW JADROWYCH im. Andrzeja Sołtana
Photocathode based Electron Sources for Particle Accelerators – Yesterday, Today and Tomorrow B.L. Militsyn STFC ASTeC, UK European Workshop on Photocathodes.
CW and LP operation of the XFEL-type cryomodule Jacek Sekutowicz.
Experience with high loaded Q cavity operation at HZB
J. Lorkiewicz (NCBJ) , R. Nietubyć (NCBJ) et al, DESY, Apr. 2015
Superconducting RF Photoelectron Source -
XFEL beamline loads and HOM coupler for CW
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
E-XFEL Status and First Beam Results
Pb photocathodes in SRF Guns
WG3 Summary High current and CW accelerators
Progress in the Multi-Ion Injector Linac Design
Metallic Photocathodes for Superconducting RF Photo Guns
Cathodes in CW Operation at the Cornell Photoinjector
J. Sekutowicz Topical Workshop on High Repetition-Rate XFEL
Notkestrasse 85, Hamburg, Germany
SRF Gun at ELBE Work package 10, Task 7 Jochen Teichert
Perspectives of SRF gun development for BERLinPro T. Kamps (HZB)
Erdong Wang Brookhaven National Laboratory
CW Operation of XFEL Modules
MIT Compact X-ray Source
CW accelerating module test progress at DESY
The Cornell High Brightness Injector
at Helmholtz-Zentrum Berlin
Overview of the present status of the SRF gun design and construction
Perspectives of SRF gun development for BERLinPro T. Kamps (HZB)
ERL Main-Linac Cryomodule
Beam Dynamics in a Spilt SRF-Gun
Performance of Large Grain TESLA cavities
LCLS Commissioning Parameters
LCLS Commissioning Parameters
Nick Walker (DESY) EU GDE Meeting Oxford
Injector: What is needed to improve the beam quality?
Pulsed Ion Linac for EIC
Superconducting High Brightness RF Photoinjector Design
LCLS Commissioning Parameters
LCLS Commissioning Parameters
DC Photocathode Gun (JLAB)
Update on ERL Cooler Design Studies
Multi-Ion Injector Linac Design – Progress Summary
Axel Neumann SRF Science and Technology Helmholtz-Zentrum Berlin
Presentation transcript:

SRF Pb/Nb photoinjector; recent results Jacek Sekutowicz

Collaboration since 2005 P. Kneisel (JLAB), G. Ciovati (Jlab), Acknowledgments Collaboration since 2005 P. Kneisel (JLAB), G. Ciovati (Jlab), R. Nietubyc, R. Mirowski, J. Witkowski (NCBJ), T. Rao (BNL), J. Smedley (BNL), C. Engling, B. van der Horst, K. Jensch, D. Klinke, D. Kostin, A. Poerschmann, A. Schmidt, X. Singer, W. Singer (DESY). Test at HZB of 1.6-cell in HoBiCaT in 2011 and coming test in 2012 T. Kamps, W. Anders, R. Barday, D. Böhlick, A. Frahm, M. Dirsat, F. Hoffmann, A. Jankowiak, S. Klauke, J. Knobloch, O. Kugeler, P. Kuske, J. Rudolph, A. Matveenko, A. Neumann, T. Quast, M. Schenk, M. Schuster, S. Schubert, J. Völker (HZB), J. Teichert (FZD), V. Volkov (BINP), I. Will (MBI) Jacek Sekutowicz, “SRF Pb/Nb photoinjector; recent results”. TTC, December 2011, Beijing

What has been demonstrated New cavity and its baseline test Outline Pb/Nb SRF injector Parameters What has been demonstrated New cavity and its baseline test New coating setup Jacek Sekutowicz, “SRF Pb/Nb photoinjector; recent results”. TTC, December 2011, Beijing

Nominal Ecath at cathode SRF Injector Our goal is ~ 1 mA – class injector delivering high quality bunches (1 nC @ 1µrad) for the lp and cw operation of the XFEL facility. It is all superconducting gun with superconducting Pb cathode. HOM couplers Input Coupler Laser Light Emitting Pb spot Electron beam Parameter Unit Value Spot radius [mm] 1.5 Nominal Ecath at cathode [MV/m] ~50 QE at 213 nm - 1.4 E -3 QE at 260 nm 3.5 E-4 Jacek Sekutowicz, “SRF Pb/Nb photoinjector; recent results”. TTC, December 2011, Beijing

Parameters Nominal Energy / Eacc GeV / MV/m 17.5 / 23.5 7 / 7.5 Beam pulse length lp and cw ms 100 cw Repetition rate Hz 1 - # bunches/s 25000 250 000 Bunch spacing (an example) ns 4000 Bunch charge nC 0.25 Beam current (an example) mA 0.062 Laser pulse energy / power for 213 nm µJ / W 4 / 0.1 1 / 0.25 Laser pulse energy / power for 260 nm 14 / 0.35 3.5 / 0.88 Jacek Sekutowicz, “SRF Pb/Nb photoinjector; recent results”. TTC, December 2011, Beijing

Pb samples deposited with 10 cm long arc What has been demonstrated Many parameters have been demonstrated or reached values were close to the spec, but not yet all together in the cryogenic test of a 1.6-cell cavity. Parameter Unit Spec Maximum Measured Comment Epeak without Pb MV/m - 61 1.6-cell, DESY#1, August 2008 Epeak with Pb 50+ 45 1.6-cell, DESY#1, December 2008 QE at 213 nm 10-3 1.4 2.7 Pb samples deposited with 10 cm long arc QE at 260 nm 10-4 3.5 4.8 Test results of the BESSY 1.6-cell cavity in HoBiCaT in 2011 The first beam April 21st, 2011 Cathode QEmax 1*10-4 @258 nm (non uniform) Electric peak field 20 MV/m Electron energy 1.8 MeV Bunch charge 6 pC Normalized emittance 2 mm mrad Jacek Sekutowicz, “SRF Pb/Nb photoinjector; recent results”. TTC, December 2011, Beijing

New cavity and baseline test The 2nd cavity was constructed (D. Klinke) and built (P. Kneisel), to test the new coating setup and to learn more about the tuning and LLRF during operation. Very stiff end-plate made of large grain Nb disc. Jacek Sekutowicz, “SRF Pb/Nb photoinjector; recent results”. TTC, December 2011, Beijing

New cavity and baseline test Baseline tests (P. Kneisel and G. Ciovati) Cavity was BCP treated, heat treated at 600 C, HPR, but not baked at 120°C Jacek Sekutowicz, “SRF Pb/Nb photoinjector; recent results”. TTC, December 2011, Beijing

New coating setup Old setup with long distance between the source of Pb ions and the end-plate. 1.6-cell cavity in helium vessel Source of Pb ions Lead deposition setup at NCNR in Swierk / Poland Jacek Sekutowicz, “SRF Pb/Nb photoinjector; recent results”. TTC, December 2011, Beijing

New coating setup New coating setup is placed inside the cavity, very close to the end-plate. The distance is as short as for the best performing samples. 1.6-cell cavity Source of Pb ions Jacek Sekutowicz, “SRF Pb/Nb photoinjector; recent results”. TTC, December 2011, Beijing

Elements of the new setup and the setup assembled for commissioning. New coating setup Elements of the new setup and the setup assembled for commissioning. Jacek Sekutowicz, “SRF Pb/Nb photoinjector; recent results”. TTC, December 2011, Beijing

New coating setup Commissioning of the setup began on November 28th. Example of the coating; Arc parameters : Ucathode = 14.9 V, Iarc = 5 A, coating time t = 30 s The first observation: a. Process is fast-> current and voltage should be lower to avoid droplets. Heating of the mask is too strong -> pulsed deposition 3 x 10s with several minutes break. We will implement a disk-like filter to reduce the amount of droplets. Optimization of the coating parameters will take next 2 weeks. Coating of the new cavity in December. Jacek Sekutowicz, “SRF Pb/Nb photoinjector; recent results”. TTC, December 2011, Beijing