CONTENTS Accuracy of Construction Cost Estimating 00 Abstract
Project Control: Developing the As-Planned S-Curves
Cost Estimation in a Construction Company Under the guidance of Prof. K. Narayanan Department of Humanities and Social Science Indian Institute of Technology,
Creating and Managing Sites Module 7. Overview Creating Standard Sites Customizing Look and Feel Saving Sites as Templates.
1 CHAPTER M2 Classifying Costs © 2007 Pearson Custom Publishing.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Operational Budgeting Chapter 22.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
CAPITAL COST ESTIMATES INSTALLED EQUIPMENT COSTS.
Project Control: Developing the As-Built S-Curves Part #3 June 26, 2002 Hide/Unhide Exercises.
Warm Up Notes What is an Assignment? What’s the objective? When is it due? How much effort? What criteria? protocol Subject: CVEN ??? ???
Construction Project Management
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Warm-Up Rules of Engagement Office hours are in the afternoons, unless you have made other arrangements. If the door is open, I’m in the area come look.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
Configuring Content Navigation Module 8. Overview  Understanding Site Navigation  Customizing Current Site Navigation  Customizing Global Site Navigation.
1 COST ESTIMATING. 2 Time Data Cost Data Performance Data Procurement Data Owner special Data Brainstorming Process Company Needs Market Research. Feasibility.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lect. 1 2 nd Semester 2008/2009 UP Copyrights.
Phase 3: Scheduling and Cost Estimate Provide the following: 1.Detailed Project Schedule: Bar Chart 2.Cost Estimate 3.List of Trades Construction Process.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
IB Business and Management
4/21/2003CVEN Maxwell 1 Project Control: Control of Work and Cost Versus Time Part November 19, 2015.
The Project Development Process: Setting the Context for Project Control Part #1 November 28, 2015.
Unit 2  Topic:  Company organization chart  Company objective.
Budgeting and Cost Estimation Objective: – Introduce some simple concepts regarding developing project budgets and cost projections.
Learning Objective 1 Identify the major differences and similarities between financial and managerial accounting.
Accounting: Introduction Mr. BarryA-level Accounting Year 12.
Project Control: Work and Cost Versus Schedule Module: April 22, 2003.
Costs and Cash Flows Estimation. Engineering Economic Analysis - Seven Steps 1. Recognition and formulation of the problem. 2. Development of the feasible.
Reading literacy. Definition of reading literacy: “Reading literacy is understanding, using and reflecting on written texts, in order to achieve one’s.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Algebra 1 Keystones Eligible Content Test Design Performance Level Indicators.
ENGINEERING n MANAGEMENT n ENVIRONMENTAL
Chapter 3: Cost Estimation Techniques
2016 Alaska Western Workshop Cost Estimating 101
Chapter 16 Overview: Writing Proposals
Chapter 3: Cost Estimation Techniques
Copyright All Rights Reserved by
Systems Analysis and Design in a Changing World, 4th Edition
Cost Estimation and Budgeting
Taking the TEAM Approach: Writing with a Purpose
MANAGEMENT ACCOUNTING
ERP = Enterprise Resource Planning
Managerial Accounting Concepts and Principles
Manajemen Industri Instructor: Rama Oktavian
Project Controls: As-Built S-Curves
Lecture 08.
MAINTENANCE PLANNING AND SCHEDULING
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
Budget I want to plan a project by determining how much money
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Scope management Chapter 5 Copyright ©2016 Pearson Education, Inc.
Regional Architecture Development for Intelligent Transportation
Chapter 3: Cost Estimation Techniques
Chapter 3: Cost Estimation Techniques
Regional Architecture Development for Intelligent Transportation
The Project Development Process:
Traditional Steps Leading To A Bid Document
Activity on Node Approach to CPM Scheduling
Project-X Status Report
CHPE308 Engineering Economy Estimation Of Capital Cost
CTC 475 Review Inflation Inflation rate f is the rate of change in the value of currency (inflation/deflation) Inflation-free rate i represents a gain.
1 CHAPTER M2 Classifying Costs © 2007 Pearson Custom Publishing.
FIVE PROJECT PHASES.
Multi-Family Fourplex Apartment
Chapter 3: Cost Estimation Techniques
Presentation transcript:

Project Estimating Overview Module: 03.1 – PS&E Revised: November 10, 2018 11/10/2018 CVEN-349 Maxwell

Purpose: Illustrate the scope of estimating. Define the types of estimates. Describe the contents of a typical estimate. Begin the description of “how to do” an estimate. 11/10/2018 CVEN-349 Maxwell

Learning Objectives: Students should be able to list the steps in the estimating process. Students should be able to define the cost elements of a simple construction estimate. Students should be able compute the value of these cost elements, given appropriate data. 11/10/2018 CVEN-349 Maxwell

Overview Types of Estimates Estimating Process Cost Components Estimating Resources Work Packages Parametric Estimates 11/10/2018 CVEN-349 Maxwell

Types of Estimates Feasibility Estimate(s) Preliminary or Pre-construction Estimate(s) Unit Cost Estimate – Parametric Estimate – Factor Estimate – Definitive or detailed estimates: CVEN 473 Working drawings and estimates: CVEN 405 11/10/2018 CVEN-349 Maxwell

AACE Classifications Order of Magnitude Estimates Budget Estimates Definitive Estimates 11/10/2018 CVEN-349 Maxwell

Definitive Estimating Process Develop a Work Element Structure CSI Categories Site Work Concrete Etc. Schedule the Work Elements Bar Chart CPM Diagram These should be related processes! 11/10/2018 CVEN-349 Maxwell

Continued Organize Historical Data Rationalize and Scale to Job at Hand Apply Learning Curves Identify Crew Configurations Compute Direct Labor, Material, and Equipment Costs Estimate Indirect and G&A Costs 11/10/2018 CVEN-349 Maxwell

Continued Apply Inflation and Factors Compute Costs Fine Tune Publish in Useful Form 11/10/2018 CVEN-349 Maxwell

In Class Pair Exercise 03.01 Let’s estimate the “order of magnitude” cost of a parking garage at TAMU. How many cars or spaces? Get cost per space from R.S. Means. Arrive at a range, etc. Compute estimate. 11/10/2018 CVEN-349 Maxwell

Definitive Estimate Direct Cost Components Direct Material Costs (30%-50%) Direct Labor Costs (40%-60%) Wage Rates Productivity Direct Equipment Costs (20%-30%) Direct Costs: Those costs that are applied directly to the product in question – This is an important concept. 11/10/2018 CVEN-349 Maxwell

Cont’d – Indirect Costs & Profit Indirect Job Supervision – Clerical Staff Other Project Indirects – Office Trailer Company Indirects – General and Administrative (G&A) Indirect Costs: All costs that are NOT direct. Profit – Net of Revenue less all Costs, including interest costs on Working Capital. 11/10/2018 CVEN-349 Maxwell

Resources R. S. Means, etc. (See Handouts) Historical Project Data Productivity Work Standards Scaling Factors: Location, Inflation, Customer, etc. A lot of the questions I get asked by “call-ins” can be answered from information in one or more of the Means Manuals. 11/10/2018 CVEN-349 Maxwell

Assessment: Take a minute to write 1 sentence on the “muddiest” topic for the day. 11/10/2018 CVEN-349 Maxwell