PhotoVoltaic System Sizing © ARJ This is not a How-To presentation. It is a What and Why presentation.
Advertisements

STANDARD RESIDENTIAL ROOFTOP SOLAR ENERGY GENERATION BG SOLAR (PTY) LTD
ACEMCO s.a.l..  ACEMCO has a partnership with one of the world’s biggest and most reliable manufacturer of solar lights: Geo-Technik.  Geo-Technik is.
Rooftop Solar Systems Rooftop Solar System (Off-Grid) Reliance Solar Energy™, Ratnagiri.
Solar Energy : Here Comes the Sun!!! June 28, 2012.
Inverters. What is an inverter? Inverters change Direct Current (DC) to Alternating Current (AC). Stand-Alone inverters can be used to convert DC from.
Nameplate Test Results for 30 Watt Solar Panel Shown in Class, Nov.
Photovoltaic Solar Cells and Solar Energy Systems for Home Usages Mohammad Anisuzzaman.
Solar Home UPS 850VA & 1400VA India’s first Sine wave inverter with in built Solar Charge Controller and Controlled DC Load Output. Simultaneous Charging.
UDC ZERO ENERGY VISTOR CENTER. System Components Solar Array –Primary Power Generator –Array consists of 12 BP SX3190B Solar Modules.
A PRESENTATION ON SOLAR WIND HYBRID SYSTEM BY. BACKGROUND For remote and inhospitable areas – Reliable Electricity supply is not available.
Electricity Compare AC and DC electrical current and understand their important differences Explain the relationship between volts, amps, amp-hour, watts,
Do It Yourself Workshop Agenda topic presentation Question and answer to panel & audience Open forum Sponsored by Oceanside Yacht Club & Oside Yachts.
Solar Lightings Solar Module. Charge Controller. Battery. Inverter. Loads Accessories.
Station Battery Solar AC Source Home Batteries Battery Chargers.
SOLAR POWER SOLUTION FOR TELECOM APPLICATIONS
Micro Wind for Remote Sites James Jarvis APRS World, LLC
Sustainable Energy Systems Engineering Peter Gevorkian Ch 2: Solar Power Generation Design Brevard Community College EST1830 Bruce Hesher.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
Photovoltaics. Agenda What is PV? System Types Mounting Options Product Options System cost & performance System sizing considerations Advantages of PV.
TECHNICAL OVERVIEW BY DIAMOND GREEN ENERGY CORPORATION.
Designing Solar PV Systems (Rooftops ). Module 1 : Solar Technology Basics Module 2: Solar Photo Voltaic Module Technologies Module 3: Designing Solar.
SOLAR POWER SYSTEM FEASIBILITY STUDY,AND REPORT FOR A MUSEUM Presented by Abiola Adeseko Hamid Mohseni Sandeep Tripuraneni Charan Reddy.
Components Three Basic Parts to an Active PV System: –Collector/Harvestor –Storage –Distribution More complex systems need –Inverter –Charge Controller/Voltage.
Solar Energy Technology Science Summer Camp Session 9: Fri 9:00 AM - 12:00 N : Field trip to Energy Masters and Installing/Commissioning the System.
Elements of a Small Off-Grid 24 Volt Solar System (Installed by Mack Grady at Gary Grady’s cabin, 15 miles north of Silverthorne, CO, in the Gore Range.
Station Backup Power & Solar Powering your station.
Session 17 Grid Tied PV Systems – Part 6 Three-Phase Systems Siting and Mechanical Considerations October 29, 2015.
SPIDER Solutions Nigeria
Battery Backup PV Systems Design Considerations
Solar Powered Charging Station: Mid-Term Presentation Design Team: Ben Hemp Jahmai Turner Rob Wolf, PE Sponsors: Conn Center for Renewable Energy Dr. James.
Analysis of “Hybrid” Renewable Energy Technology “SolarMill ® ” versus “Solar‐Only” I recently spoke with Dan Bates, CEO of Windstream Technologies,about.
1. 2 PRODUCTS OF C.E.L Solar Photovoltaic Cells Solar Photovoltaic Modules Cathodic Protection Electronic Ceramics Railway Electronics Microwave Electronics.
Assessment and Design of Rooftop Solar PV system
Photovoltaic and Battery Primer
Photovoltaic and Battery Primer
From Lecture1 vi , ii vo , io Power Processor Controller Source Load
Solar photovoltaic (PV)
Company Profile
Solar PV Updates PDE Summit, December 2009
Solar Power Design and Solutions
Solar information Session
Sustainable Hybrid Generator
Photovoltaic Systems Engineering Session 15 Stand-Alone PV Systems
Specification & Description
Photovoltaic Systems Engineering Session 16 Stand-Alone PV Systems
Photovoltaic Systems Engineering Session 22 Solar+Storage Systems
Photovoltaic Systems Engineering Stand-Alone PV Systems – Review
Photovoltaic Systems Engineering Session 27
PV System Quality and Performance
On track to be 100% Renewable
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Sizing Methodologies • Sizing Calculations
Suchnetcom Solar Ltd Nigeria
On track to be 100% Renewable
Photovoltaic Systems Engineering Session 16 Solar+Storage Systems
Elements of a Small Off-Grid 24 Volt Solar System
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
THE STUDY OF SOLAR-WIND HYBRID SYSTEM PH301 RENEWABLE ENERGY
Photovoltaic Systems Engineering Session 17 Solar+Storage Systems
ANALYSIS, DESIGN & ESTIMATION OF residential building with p.v installation under the guidance of Mr. S.Bhanu Prakash, M.Tech Assistant Professor Department.
Photovoltaic Systems Engineering Session 19 Solar+Storage Systems
Photovoltaic Systems Engineering Session 19a Solar+Storage Systems
L6: INVERTERLESS Usage Scenarios
Indoor Off-Grid and Grid Lighting
Grid Tied PV Systems – C&I scale Siting and Mechanical Considerations
Chapter Twenty One: Electrical Systems
Stand alone vs. interconnected
Components inverters Except where otherwise noted these materials are licensed Creative Commons Attribution 4.0 (CC BY)
Photovoltaic Systems Engineering Session 23
Presentation transcript:

SOLAR INSTALLATION AND DESIGN: THE DOS AND DON’TS POWER NIGERIA 2017 Engr. Tajudeen Humble Sikiru (PhD) Electrical Engineering Department, Ahmadu Bello University, Zaria. Rana World Tech Shop Limited, Kaduna, Nigeria

Essential Steps for Good Solar Systems Accurate Survey data + Good Design + Good Installation + Regular Maintenance = Excellent Solar System 8-Nov-18

Accurate Survey & Design Survey: Location and Load parameters Know your solar installation location Accurately determine the load size 8-Nov-18 Power Nigeria 2017

Accurate Survey & Design Use Google earth to determine roof top space and orientation Alternatively, physically measure and determine available space 8-Nov-18 Power Nigeria 2017

Solar Design: Critical Component Selection (Solar panel) Solar Panel Selection: Monocrystalline Vs Polycrystalline b. What does the data sheet means? c. Beyond the price, what do engineers lookout for? Polycrystalline Monocrystalline 8-Nov-18 Power Nigeria 2017

Solar Design: Critical Component Selection (Solar panel) Manufacturer A Solar Panel Selection: What do engineers lookout for? b. price factor? Manufacturer B 8-Nov-18 Power Nigeria 2017

Solar Design: Critical Component Selection (Solar panel) Manufacturer A Solar Panel Selection: What do engineers look at for? b. price factor? Manufacturer B 8-Nov-18 Power Nigeria 2017

Solar Design: Critical Component Selection (Solar panel) Manufacturer B Manufacturer A 8-Nov-18 Power Nigeria 2017

Solar Design: Critical Component Selection (Inverters and Mppt Charge controllers) Manufacturer B ii. Inverter Selection What is the purpose of technical data sheet? Beyond what the manufacturers claims? Effect of wrong inverter on system performance? Right inverter Vs price? Manufacturer A 8-Nov-18 Power Nigeria 2017

Solar Design: Critical Component Selection (Inverters and Mppt Charge controllers) What is the purpose of technical data sheet? Manufacturer B Manufacturer A 8-Nov-18 Power Nigeria 2017

Solar Design: Critical Component Selection (Inverters and Mppt Charge controllers) The purpose of technical data sheet? Manufacturer B Manufacturer A Effect of wrong inverter on system performance? Premature damage of battery bank Damage of sensitive equipment b. Right inverter Vs price? Application dependent At least know what you are expecting 8-Nov-18 Power Nigeria 2017

Solar Design: Critical Component Selection (Inverters and Mppt Charge controllers) The Effect of Battery Algorithm on Battery Lifespan? Manufacturer B Manufacturer A 8-Nov-18 Power Nigeria 2017

Solar Design: Critical Component Selection (Battery Bank) ii. Critical Questions Before Battery Selection: Question 1 Battery type ?: Maintenance Free Maintenance Required e.g. Gel, AGM e.g. Flooded Question 2 Battery use ?: Low starting current loads High starting current loads e.g. TV, lighting point, home appliances e.g. Air conditioners, induction machines Question 3 Expected period of use (autonomy)? Question 4 Is the number of string less than or equal to 3 per battery bank? 8-Nov-18 Power Nigeria 2017

Solar Design: Critical Component Selection (Battery Bank) Effect of duty cycles on battery life span: Manufacturer B Manufacturer A 8-Nov-18 Power Nigeria 2017

Solar Design: Critical Component Selection (Battery Bank) Effect of temperature on battery life span: 8-Nov-18 Power Nigeria 2017

Solar Design: Critical Component Selection (Battery Bank) battery selection based on capacity: Manufacturer B Manufacturer A 8-Nov-18 Power Nigeria 2017

SOLAR DESIGN EXAMPLES A 3 bedroom flat has the loads indicated in Table 1, design: A solar solution with 6 hours grid/generator support A solar solution with 12 hours grid/generator support A solar solution totally off grid Power Nigeria 2017 8-Nov-18

SOLAR DESIGN EXAMPLES s/n Description of load Number Power consumption (W) Hours of use (h) Energy consumption (kWh) 1 Television/radio/decoder 4 250 5 2 Fan 75 12 4.5 3 Air conditioner 1400 11.2 Lighting (bulbs) 18 26 5.6 Washing machining 800 2.4 6 Water pump 1200 Total 6.57 kW 31.1 kWh/day Diversity factor =0.65 4.27 kW 20.2 kWh/day 6 hours of grid/generator 5.05 kWh/day 12 hours grid/generator 10.1 kWh/day Power Nigeria 2017 8-Nov-18

SOLAR DESIGN 1 (6 hours of grid/generator support) Location : Abuja 15.15 kWh/day is the minimum power generation from the solar system 50 % Depth Of Discharge (DOD) of battery per day (i.e. Battery bank capacity =30.3 kWh) 1 day autonomy of the battery back up system Design: Assumed all system loses of 15% (AC and DC cables +inverter) In Abuja, 1 kWp solar system will generate 3.8 kWh per day, hence 4kWp solar system must be installed. 265 W panel was selected , then we need 15 number panels The selected panel has Voc = 37.8V, Isc =9.01 A, we use this information to select charge controller, we could select 150V, 60A or 600 V, 80A or 5kW grid tied PV inverter We could select 4.6 kW or 5.5 kW battery inverter Expected battery capacity bank =30.3 kWh The selected inverter is 48 V, DC input, we need 24 number of battery @ C10 ( 2 V, 700 Ah). We could select OPZV 750 , OPZV, 2-770. or We could select an alternative battery that would be max. of 2 string.@ C10 (2V, 350 Ah). But we need 48 numbers of batteries. Power Nigeria 2017 8-Nov-18

SOLAR DESIGN 2 (12 hours of grid/generator support) Location : Abuja 10.1 kWh/day is the minimum power generation from the solar system 50 % Depth Of Discharge (DOD) of battery per day (i.e. Battery bank capacity =20.12kWh) 1 day autonomy of the battery back up system Design: Assumed all system loses of 15% (AC and DC cables +inverter) In Abuja, 1 kWp solar system will generate 3.8 kWh per day, hence 2.65kWp solar system must be installed. 265 W panel was selected , then we need 10 number panels The selected panel has Voc = 37.8V, Isc =9.01 A, we use this information to select charge controller, we could select 150V, 60A or 2.5 kW grid tied PV inverter We could select 4.6 kW or 5.5 kW battery inverter Expected battery capacity bank =20.12kWh The selected inverter is 48 V, DC input, we need 24 number of battery @ C10 ( 2 V, 500 Ah). We could select OPZV 520 , OPZV, 2-500. Or We could select an alternative battery that would be max. of 2 string @ C10 (2V, 250 Ah). But we need 48 numbers of batteries. Power Nigeria 2017 8-Nov-18

SOLAR DESIGN 3 ( totally off grid) Location : Abuja 20.2 kWh/day is the minimum power generation from the solar system 50 % Depth Of Discharge (DOD) of battery per day (i.e. Battery bank capacity = 40.4 kWh) 1 day autonomy of the battery back up system Design: Assumed all system loses of 15% (AC and DC cables +inverter) In Abuja, 1 kWp solar system will generate 3.8 kWh per day, hence 5.3 kWp solar system must be installed. 265 W panel was selected , then we need 20 number panels The selected panel has Voc = 37.8V, Isc =9.01 A, we use this information to select charge controller, we could select 2 number of 150V, 60A or 1 number of 5.3 kW grid tied PV inverter We could select 4.6 kW or 5.5 kW battery inverter Expected battery capacity bank =40.4kWh The selected inverter is 48 V, DC input, we need 24 number of battery @ C10 ( 2 V, 900 Ah). We could select OPZV 1000 , OPZV, 2-1000. or We could select an alternative battery that would be max. of 2 string @ C10 (2V, 500 Ah). But we need 48 numbers of batteries. Power Nigeria 2017 8-Nov-18

Installation: Dos and Don’ts Personal Protective Equipment (PPE) Your Safety is Your Responsibility Safety is Everyone’s Responsibility on Site 8-Nov-18 Power Nigeria 2017

Installation: Dos and Don’ts Mounting System & Panel Installation What is the roof integrity? What is the orientation and nature of the roof ? Does wind speed pose a threat? Don’t walk on the panels, you’ll cause micro cracks 8-Nov-18 Power Nigeria 2017

Installation: Dos and Don’ts The danger of bad Solar Panel Installation: Fire Death Electrocution Law suits Equipment damage 8-Nov-18 Power Nigeria 2017

Installation: Dos and Don’ts Inverter and Mppt Charge Controller Installation Inverter must be mounted on a solid Strong wall or metal frame DC cables must be separated from AC cables Communication cables must be separated from power cables Make your installation neat as must as possible 8-Nov-18 Power Nigeria 2017

Installation: Dos and Don’ts Inverter and Mppt Charge Controller Installation Provide the customer with a detailed wiring diagram for ease of maintenance As built diagram must be accurate As built diagram must be simple to read 8-Nov-18 Power Nigeria 2017

Installation: Dos and Don’ts Battery bank Installation Never place tools or metal components on Batteries Ensure that batteries are not mistakenly grounded Never smoke or handle flames near batteries Always use the correct cable size 8-Nov-18 Power Nigeria 2017

Commissioning and Testing Procedures 8-Nov-18 Power Nigeria 2017

Commissioning and Testing Procedures 8-Nov-18 Power Nigeria 2017

Commissioning and Testing Procedures 8-Nov-18 Power Nigeria 2017

Commissioning and Testing Procedures 8-Nov-18 Power Nigeria 2017

SOLAR INSTALLATION AND DESIGN: THE DOS AND DON’TS THANK YOU FOR LISTENING POWER NIGERIA 2017 Engr. Tajudeen Humble Sikiru (PhD) Electrical Engineering Department, Ahmadu Bello University, Zaria. Rana World Tech Shop Limited, Kaduna, Nigeria