Request for Proposal (RFP)

Slides:



Advertisements
Similar presentations
Project Management.
Advertisements

Software Quality Assurance Plan
Software Process Models
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
Chapter 14 INTRODUCTION TO SYSTEMS DEVELOPMENT. Systems Development Methodology Important issues in systems development: Must be aligned to business strategy.
What is a project? Project Management Institute definition
The Proposal. Project Proposals Genesis of Proposals: They can result for formal requests (e.g. Request For Proposal, RFP) They can be unsolicited (e.g.
Information Systems Development Lecture 2: the idea of the Life Cycle.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Chapter 3: The Project Management Process Groups
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
Project Management and Scheduling
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
S/W Project Management
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
Requirements Engineering CSE-305 Requirements Engineering Process Tasks Lecture-5.
Software Project Management Lecture # 7. Outline Project Scheduling.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Software Project Management By Deepika Chaudhary.
Project Life Cycles.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
Design Proposal A document prepared to (a) justify the need for the project, (b) describe the engineering process to be taken, (c) outline the expected.
Request for Proposal (RFP)
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Lecture 2 System Development Lifecycles. Building a house Definition phase Analysis phase Design phase Programming phase System Test phase Acceptance.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
Team-Based Development ISYS321 Managing the Information Systems Project.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Your Interactive Guide to the Digital World Discovering Computers 2012 Chapter 12 Exploring Information System Development.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
HNDIT23082 Lecture 10:Software Project Management
CHAPTER 2 SYSTEM PLANNING DFC4013 System Analysis & Design.
Project Management PTM721S
Introduction to Project Management
Software Engineering Management
Project Management PTM721S
Managing the Information Systems Project
Chapter 3 Managing the Information Systems Project
Systems Analysis and Design in a Changing World, 4th Edition
Chapter 6: Database Project Management
Software Planning Guidelines
Systems Implementation,
Software Life Cycle “What happens in the ‘life’ of software”
Project Integration Management
Class 7 – Inception Phase: Steps & techniques
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
BSA 376 Competitive Success/snaptutorial.com
BSA 376 Education for Service/snaptutorial.com
Chapter 3 Managing the Information Systems Project
Engineering Processes
Chapter 3 Managing the Information Systems Project
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Project Management Process Groups
Unit 5 – eProject – Starting to look at projects Unit 5
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Introduction to Engineering Design II (IE 202)
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
PSS verification and validation
Chapter 3 Managing the Information Systems Project
Chapter 2 Managing the Information Systems Project
Presentation transcript:

Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate designs 2. Review advantages and risks of design, decide development tools ( hardware and software) 3. Life-cycle model for the project – systematic breakdown of project phases, etc.

Step 1 Understand needs of end user Assess and Manage Risks Design constraints Criteria for evaluating/ranking designs Feasible designs – ranking and trade-offs Assess and Manage Risks Develop models for systems, sensors, interfaces - subsystems sequential or parallel interconnected systems Validation of models (input-output)

Step 2 Decide development strategy Development tools Top down, bottom up, combination Development tools Software components,(compilers, libraries, support s/w)

Step 3 Project phases (concept, overall design, detailed design, coding development/ build and test) Project demos Identify deliverables Determine specification list and evaluate against original design specs ( iteratively develop a proposal that meets the customer needs)

Project Management Personnel Tasks Contribution of each team member Resources needed/ procurement Timeline Tasks, integration, reports, presentations, demonstrations Gantt Charts

Technical Section Technical Section Identify customer needs (VOC Lecture) Understand the objectives, Meet with customer and Ask questions Constraints Generic - Standards, delivery date, quantity, safety, emi, Non-generic - environmental conditions, aesthetics, packaging, etc. Background Prior work and their shortcomings Design Specifications (meet with your customer/sponsor) Design parameters – Translate customer needs to design parameters Relevance of each parameter to design criteria that must be satisfied Candidate Designs (more than 1 design) Evaluate/rank designs ( feasibility and decision matrices) Expected Outcomes Test plan – to demonstrate specs have been met

Full Proposal – Due Week 7

Proposal Format No more than 15 typed pages Cover page Title, design team #, facilitator, Document type Design team members, date Executive summary TOC Introduction Background Objectives FAST Diagram Conceptual Designs, Ranking Proposed design Risk Analysis Project Management Budget References (plagiarism) Appendix

Questions

Technical Communications Reports- Pre-proposal Full Proposal Interim Progress Reports - Status of project Final Report - Informs management/client of the final result , operating manual (use and trouble shooting) Professional Self-Assessment Oral Presentations

Formal Report Structure