2007 Witnessed Remarkable Service Enhancements at Dulles

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Symantec 2010 Windows 7 Migration Global Results.
In-Home Pantry Inventory Updated: November Background and Methodology Background In 1996 a National Eating Trends (NET) pantry survey found that.
APPA CEO Roundtable Phoenix, AZ March 15, 2011
1
Cost Behavior, Operating Leverage, and Profitability Analysis
UNITED NATIONS Shipment Details Report – January 2006.
David Burdett May 11, 2004 Package Binding for WS CDL.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Concession Agreement Tirana International Airport Nene Tereza
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
Tennessee Higher Education Commission Higher Education Recommendations & Finance Overview November 15, 2012.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt RhymesMapsMathInsects.
Dennis L. Edwards Tunnel
You will have fifteen seconds to answer each question using your resource booklet. There are fifty questions. Though it has little to do with the Apprentice,
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
The 5S numbers game..
Module 2: General Working Conditions 2.1 Housekeeping & Slips, Trips, & Falls Susan Harwood Grant Number SH F-23.
Break Time Remaining 10:00.
Andrew McNaughton 1 Radical Change is Entirely Possible! 2 nd November 2011.
Operating Plans and Rates
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
By: Tony Diana, Date: September 19, 2005 File: apo130\ASPMDocs\ASPM Presentation 05.ppt Federal Aviation Administration Presentation of the.
San Diego International Airport Master Plan
Dubai & the Horizons of Development 29 October 2007.
Clint Torp, Assistant Airport Manager
Transportation and Air Traveler Characteristics Findings from the 2011 Washington-Baltimore Regional Air Passenger Survey Transportation Planning Board.
Cormac Engineering Zambia Limited The Finance and Construction of 12 Airports For The Republic of Zambia Presented by Steve Pearson Programme Director.
MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION
Oil & Gas Final Sample Analysis April 27, Background Information TXU ED provided a list of ESI IDs with SIC codes indicating Oil & Gas (8,583)
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Adding Up In Chunks.
SLP – Endless Possibilities What can SLP do for your school? Everything you need to know about SLP – past, present and future.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Before Between After.
Subtraction: Adding UP
1 Lab 17-1 ONLINE LESSON. 2 If viewing this lesson in Powerpoint Use down or up arrows to navigate.
: 3 00.
5 minutes.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Signs, Signals, and Pavement Markings
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Converting a Fraction to %
Clock will move after 1 minute
Drivers Education Journal # Please pick up all the handouts Get out a sheet of loose leaf paper and something to write with Write the.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
1 DIGITAL INTERACTIVE MEDIA Wednesday, October 28, 2009.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
FIGURE 3-1 Basic parts of a computer. Dale R. Patrick Electricity and Electronics: A Survey, 5e Copyright ©2002 by Pearson Education, Inc. Upper Saddle.
Parsons Management Consultants – A Joint Venture
Washington Dulles International Airport
San Antonio Airport System Overview Presented to the Airport Ground Transportation Association September 13, 2010.
Presentation transcript:

Dulles Update: The Year in Review, and the Outlook Ahead December 2007 Christopher U. Browne Vice President and Airport Manager Washington Dulles International Airport

2007 Witnessed Remarkable Service Enhancements at Dulles 145 New Weekly Flights to Eight New International Destinations Six New Countries: China, Ireland, Kuwait, Panama, Qatar and Spain Four New Foreign Passenger Airlines: Aer Lingus, Copa, Iberia and Qatar First China Route: Beijing New Nonstop Services to Johannesburg, Rio de Janeiro New Domestic Services: United to Huntsville, Little Rock, Oklahoma City and Springfield JetBlue to Orlando Virgin America to San Francisco and Los Angeles

Traffic Continues to Grow at Dulles 2006 – 2007 Est: International up 16.4%; Domestic up 6.3% Total Passengers at Washington Dulles Source: Metropolitan Washington Airports Authority 2007

International Air Service at Dulles Nonstop and Single Plane Cities Served to/from Dulles 41 Destinations (40 Cities) 22 Carriers 423 Weekly Departures Note: Vancouver service is seasonal. Source: OAG, October 1-7, 2007

Domestic Nonstop Air Service at Dulles 81 Destinations 11 Carriers 366 Daily Departures Source: OAG, October 1-7, 2007

Washington Dulles Landing Fees Are Reasonable 2007 Signatory Landing Fees at Major International Gateways * Includes AirTrain surcharge and converts MTOW to MLW equivalent ** Converts MTOW to MLW equivalent Source: Airport Documents on rates and charges

IAD CCP - Significant Construction Projects Underway NOAA Relocation North Area Roads North Section Phase 3 South Section Phase 2 Airport Rescue and Firefighting Facility Main Terminal APM Station and Final Mezzanine Security Screening (Package 6) Cargo Building 6 Apron Main Terminal Expansion Joint Replacement International Arrivals Building Enabling Projects Rehabilitate Taxiway B Airfield Shoulders West APM Tunnels, Station Excavation and Utilities East APM Tunnels and East APM Stations (Tier 1 and Tier 3) Concourse B West APM Station and 15-Gate Expansion Tier 2 / Concourse C Connector and Taxilane E Bypasses Fourth Runway Earthwork and Clearing Paving and NAVADIS Tier 2 East APM Station Taxiways Q Rehabilitation Fuel Settling Tank Farm Early Tank Procurement General Fuel Farm Construction Automated People Mover System Design-Build Vehicle Wash Facility Midfield Concourse Stations APM Enclosures APM Vehicle Maintenance Facility

AUTOMATED PEOPLE MOVER SYSTEM Design/Build: Sumitomo Corporation of America Start Date: March 2003 Substantial Completion: July 2009 Percent Complete: 55% DESCRIPTION: The Automated People Mover (APM) System will replace most of the current Mobile Lounge system that is used to transport passengers between the Main Terminal and the Midfield Concourses. The train will operate on an underground dual track system. The design-build project includes design, manufacture, and installation of guideway, power, and automatic train control systems. The contractor will also provide 29 vehicles.

Vehicles 1 through 12 and MRV at the Vehicle Maintenance Facility AUTOMATED PEOPLE MOVER SYSTEM Vehicle Manufacturing Update Vehicles 1 through 12 and MRV at the Vehicle Maintenance Facility

Vehicle Manufacturing Schedule Status AUTOMATED PEOPLE MOVER SYSTEM Vehicle Manufacturing Schedule Status Manufacturing Schedule: Completed Delivery Schedule: Batch 1 Delivered to Dulles Site: May 29, 2007 Batch 2 Delivered to Dulles Site: September 5, 2007 Batch 3 Vehicles 13, 14, 21-26 Arrive Baltimore: December 17 Arrive Dulles: Mid-January 08 Batch 4 Ship: December 2007 Arrive: February 2008

SUMMARY (PROGRESS TO DATE) AUTOMATED PEOPLE MOVER SYSTEM Raceway Installation TIER 1 EAST STATION TIER 2 EAST STATION TIER 3 EAST STATION WORK THIS MONTH: DRILL, FORM AND POUR CIP RACEWAY INSTALL UNDER-PLATFORM WIREWAY INSTALL JUNCTION AND PULL BOXES MAIN TERMINAL STATION RACEWAY COMPLETE (TOTAL) SUMMARY (PROGRESS TO DATE) RACEWAY IN-PROGRESS: 960 LF RACEWAY COMPLETE: 19,546 LF RACEWAY REMAINING (NOT STARTED): 600 LF RACEWAY COMPLETE (MONTH) TIER 1 WEST STATION RACEWAY IN-PROGRESS RACEWAY REMAINING Segment 3 CIP Raceway Through TBM Tunnel

SUMMARY (PROGRESS TO DATE) AUTOMATED PEOPLE MOVER SYSTEM Plinth Installation TIER 1 EAST STATION TIER 2 EAST STATION TIER 3 EAST STATION WORK THIS MONTH: LAYOUT, DRILL AND FORM CONCRETE PLINTH MAIN TERMINAL STATION PLINTH COMPLETE (TOTAL) SUMMARY (PROGRESS TO DATE) PLINTH IN-PROGRESS: 780 LF PLINTH COMPLETE: 20,176 LF PLINTH REMAINING (NOT STARTED): 150 LF PLINTH COMPLETE (MONTH) TIER 1 WEST STATION PLINTH IN-PROGRESS PLINTH REMAINING Segment 5c Outer Plinth

SUMMARY (PROGRESS TO DATE) AUTOMATED PEOPLE MOVER SYSTEM Guide Rail Installation TIER 1 EAST STATION TIER 2 EAST STATION TIER 3 EAST STATION WORK THIS MONTH: INSTALL GUIDE RAIL BRACKETS INSTALL WALKWAY SIDE GUIDE RAIL INSTALL NON-WALKWAY SIDE GUIDE RAIL MAIN TERMINAL STATION GUIDE RAIL COMPLETE (TOTAL) SUMMARY (PROGRESS TO DATE) GR IN-PROGRESS: 11,594 LF GR COMPLETE: 15,066 LF GR REMAINING (NOT STARTED): 15,552 LF GUIDE RAIL COMPLETE (MONTH) TIER 1 WEST STATION GUIDE RAIL IN-PROGRESS GUIDE RAIL REMAINING Guide Rail Segment 2 Guide Rail Support Drilling Machine

SUMMARY (PROGRESS TO DATE) AUTOMATED PEOPLE MOVER SYSTEM Signal, Control, and Communication Cable Pulling TIER 1 EAST STATION TIER 2 EAST STATION TIER 3 EAST STATION WORK THIS MONTH: SIGNAL/CONTROL CABLE PULLING IN SEGMENT 2 TO VMF MAIN TERMINAL STATION ACCF CABLE PULL COMPLETE (TOTAL) SUMMARY (PROGRESS TO DATE) CABLE PULL IN-PROGRESS: 6,456 LF CABLE PULL COMPLETE: 0 LF CABLE PULL REMAINING (NOT STARTED): 14,650 LF CABLE PULL COMPLETE (MONTH) TIER 1 WEST STATION CABLE PULL IN-PROGRESS CABLE PULL REMAINING Cable Pulling Through Segment 2

EAST APM TUNNELS AND STATIONS Designer: HNTB Contractor: Atkinson/Clark/Shea Start Date: October 2004 Substantial Completion: August 2008 Percent Complete: 87% DESCRIPTION: This project consists of the east leg of the APM tunnels from the Vehicle Maintenance Facility north to the Main Terminal. The project scope also includes the Concourse B East APM Station and a station shell at the future Tier 3 East APM location.

EAST APM TUNNELS AND STATIONS Vehicle Service and Mobile Lounge Roads over Station Installation of North Escalator Mezzanine Ceiling and Mechanical/Electrical Installation

TIER 2/CONCOURSE C EAST TRAIN STATION Designer: Kohn Pederson Fox Assoc. Contractor: Facchina Construction Company Start Date: March 2005 Substantial Completion: April 2008 Percent Complete: 92% DESCRIPTION: This project consists of a side-center-side platform, crossovers, cast-in-place concrete box tunnels, a temporary heating and cooling plant, electrical substation, high-end architectural finishes, apron, and site work. The work also includes a temporary taxilane bypass between Taxilane E and Taxiway F to allow the construction of the Concourse C Connector Tunnel.

TIER 2/CONCOURSE C TRAIN STATIONS Overview to Main Station Area Elevator and Vent/Intake Shafts/Central Plant North Mezzanine Level Elevator Lobby Area

MAIN TERMINAL SECURITY MEZZANINE AND AUTOMATED PEOPLE MOVER STATION - PACKAGE 6 Designer: Skidmore, Owings and Merrill Contractor: Turner Construction Start Date: October 2002 Substantial Completion: July 2009 Percent Complete: 69% DESCRIPTION: This project involves the construction of the new Main Terminal Automated People Mover (APM) Station, a security mezzanine, and a temporary mobile lounge dock and hold rooms. The project also includes both temporary and permanent security checkpoints in the Main Terminal.

Main Terminal Train Station 4 Levels: Departures level (ticketing) Arrivals level (bag claim) Security level – 121,700 square feet of new TSA screening space Train platform – 40 feet below ground, 54,500 square feet

Main Terminal Train Station Departing Passengers

Main Terminal Train Station Arriving Passengers

South Train Tube Steel Installation – East Side MAIN TERMINAL SECURITY MEZZANINE AND AUTOMATED PEOPLE MOVER STATION - PACKAGE 6 South Train Tube Steel Installation – East Side

MAIN TERMINAL SECURITY MEZZANINE AND AUTOMATED PEOPLE MOVER STATION - PACKAGE 6 East Hold Room

Lobby Security Level Topping Slab – West Side MAIN TERMINAL SECURITY MEZZANINE AND AUTOMATED PEOPLE MOVER STATION - PACKAGE 6 Lobby Security Level Topping Slab – West Side Installation of Numat Ceiling Mock-up Train Tube Roof Glass – West Side Skylight Installation – West Side

CONCOURSE B 12-GATE EXPANSION AND WEST APM STATION Designer: Hellmuth, Obata & Kassabaum, PC Contractor: Balfour Beatty Construction Start Date: September 2005 Substantial Completion: August 2008 Percent Complete: 75% DESCRIPTION: The 12-gate Expansion of Concourse B includes construction of a concourse and supporting space for domestic flights, a 60,000 square foot basement with a vehicular access ramp and 11,000 square foot mezzanine club level. Site work includes water and sanitary lines, apron paving, and hydrant fueling work. The APM station includes below-grade concrete construction, steel superstructure, station fit out, final utility connections, tunnel ventilation shafts, and associated tunnel equipment rooms.

CONCOURSE B 12-GATE EXPANSION AND WEST APM STATION Overview, North Side

CONCOURSE B 12-GATE EXPANSION AND WEST APM STATION Concourse Level Facing West

CONCOURSE B 12-GATE EXPANSION AND WEST APM STATION Concourse Level Holdrooms and Plane Mate Docks

FOURTH RUNWAY AND ASSOCIATED TAXIWAYS, PAVING, AND NAVAIDS PACKAGE Designer: Carter & Burgess, Inc. Contractor: Lane Construction Corporation Start Date: July 2006 Substantial Completion: April 2009 Percent Complete: 51% DESCRIPTION: The project includes the paving and navigational aid system (NAVAIDS) construction for the new Fourth Runway. The project consists of a new 9,000 foot runway, a parallel taxiway, and installation of erosion and sedimentation control measures, AOA roadways, utilities, marking/signage, permanent AOA fence, and NAVAIDS.

AIRPORT RESCUE AND FIREFIGHTING FACILITY (ARFF), STATION 304 Designer: Hughes Group Architects, Inc. Contractor: Corinthian Contractors, Inc. Start Date: May 2007 Substantial Completion: September 2008 Percent Complete: 22% DESCRIPTION: This project includes the construction of the new Airport Rescue and Firefighting Facility (ARFF), Station 304. The ARFF is a single story facility and will provide five vehicle bays, mechanical storage areas, and a residency area, which includes a locker room, administrative area, and kitchen. UPDATE: The contractor is installing electrical, communication and sanitary sewer lines. Demolition and excavation work for the building footprint is complete. Construction of the building foundation and installing the concrete masonry and block walls has begun.

Price of Jet Fuel Source: Air Transport Association 2007

Fuel Update On October 18 Air BP pumped 1 Fuel Update On October 18 Air BP pumped 1.5 m gallons of jet fuel into aircraft at Dulles—a one day record…… Five years ago we averaged 920 k per day When remaining two tanks come on line, the airport will have over 38 m gallons of storage capacity. Dulles will then have more “on airport” fuel capacity than any other airport in the country

FUEL SETTLING TANK FARM Designer: Burns & McDonnell Engineering Co., Inc. Contractor: Grunley-Walsh, LLC Start Date: May 2006 Substantial Completion: December 2007 Percent Complete: 93% DESCRIPTION: This project includes the construction of three 8.5 million gallon fuel settling tanks, a delivery facility, fuel sampling building, and electrical controls building. The contract also includes the installation of a foam fire protection system, transfer pump and filtration system, and transfer piping to the existing hydrant fueling system tank farm.

NORTH AREA ROADWAY IMPROVEMENTS – SOUTH SECTION, PHASE 2 Designer: Johnson-Mirmiran & Thompson Contractor: Lane Construction Corporation Start Date: March 2006 Substantial Completion: November 2007 Percent Complete: 93% DESCRIPTION: The project improves the eastbound Dulles Airport Access Highway (DAAH) lanes from Saarinen Circle to Route 28 to meet the traffic forecasts for 25 million annual passengers. The project includes widening the east-bound Access Highway, improving collector roads and new ramps, and adding a new intersection at Aviation and Wind Sock Drive.

NORTH AREA ROADWAY IMPROVEMENTS – SOUTH SECTION, PHASE 2 Overview, Eastbound October 2005

NORTH AREA ROADWAY IMPROVEMENTS – SOUTH SECTION, PHASE 2 Final Slip Ramp Opened to Traffic on November 21, 2007 October 2005

NORTH AREA ROADWAY IMPROVEMENTS – NORTH SECTION PHASE 3 Designer: Johnson, Mirmiran & Thompson Contractor: Facchina Construction Start Date: August 2006 Substantial Completion: August 2008 Percent Complete: 85% DESCRIPTION: The project consists of roadway improvements of the inbound Dulles Airport Access Highway from Route 28 to Aviation Drive to meet traffic forecasts for 25 million annual passengers. The project includes widening of the Access Highway, the addition of a north side Collector/Distribution Road, and upgrading connections from Route 28 and to Rudder Road. UPDATE: The contractor completed pouring concrete at the Ramp P parapet walls and bridge grooving along Ramp S and Ramp P. Work continues on paving, installing guardrails, placing seed and mulch, pouring concrete foundations and installing electrical items for the overhead signs. On the west side of the Dulles Greenway bridge, the contractor continues installing the under drains and storm drains and constructing the retaining wall. Between Rudder Road and Aviation Drive, the contractor continues backfilling, grading, and paving the grounds for the new lanes on the left side of the Access Highway. Rudder Road Toll Road (Rt 267) North Side C/D Lanes Route 28

IAD CCP - Significant Design Projects Underway Consolidated Rental Car Facility Security Screening Runway 1C-19C Reconstruction IAB Expansion Baggage EDS In-Line Fourth Runway Transitions Package South Utility Building & Electrical Distribution Center Revised Concept Tier 2 Concourse

IAD – Other Projects in Planning/Design/Procurement Main Terminal Temporary Security Screening (East and West) Concourse B Modifications for the Airbus A-380 Dulles Police Station Permanent Sign System Rehabilitation North Area Airside Access Road 800 MHz Radio Upgrades Airfield Pavement Panel Rehabilitation Program Airfield Modifications for Airbus A-380 South Utility Building Utility Tunnels West APM Tunnels – Tier 1 to Tier 2 Tunnel Ventilation and Control System

GREEN Initiatives Access to METRO Expansion of centralized deicing pads Exclusive use of polypropylene glycol products BMPs on storm water management State of the art fuel leak detection systems Recycle 80% of construction waste Dulles recycled over 30% of total refuse in 2007 (highest ever), plans in place to significantly increase number Lighting controls for energy reduction Demand management electric meters Low flow bathroom fixtures Modern utility plants with reduced emissions

The Challenges Ahead…. Cost Control Growth CCP Environmental Security Customer Service Work Force Planning

Airlines largest cost components: (per ATA news release 11/07) Fuel (25.4%) Labor (23.6%) Payments to regional partners (13.7%) Airports….about 6% “The cost of running an airline is up 86% since 2000” (ATA Chief Economist)

U.S. and Foreign Carrier Next Generation Aircraft Orders* Source: Boeing and Airbus websites

U. S. Airline System Load Factor Average break-even load factor now 76 Source: Air Transport Association 2007

Flyer Discontent According to the 2007 Zagat Global Airlines Survey: “Displeasure with U.S. carriers is growing overall, while international carriers continue to fare far better” (7498 frequent flyers,19.7 flights per year) Midwest was the top U.S airline for economy class, and Virgin America for premium class. Singapore Airlines took top honors for both economy and premium services.

IATA’s Corporate Air Travel Survey in 2007: Self-service features that respondents (over 10,000) plan to use in the near future On-line booking (75%) On-line check-in (61%) Printing boarding passes at home (58%) Common use self service check in (53%) Remote baggage drop off service (33%) Post arrival assistance (28%) Conclusion: Passengers continue to seek greater empowerment, autonomy and independence in determining their travel experience

Challenges To Aviation Growth Air Travel Congestion Results in Delays, Missed Connections, Cancellations, Added Expense and Political Backlash Aging Air Traffic Control Infrastructure Will Take Years to Modernize. Could Lead to Airport Slot Controls or Demand Management Systems Like Lotteries, Slot Auctions, Peak Period Pricing and Minimum Size Aircraft Requirements Quality of Customer Service in the Air and on the Ground is Frustrating Travelers. However, Price and Schedules Remain Largest Determinants of Demand Increasing Security Requirements by Immigration, Customs and TSA Discourages Travel to the U.S. and Irritates Travelers – “Hassle Factor” Environmental Concerns: Emissions and Noise May Increase Carrier Costs, Limit Growth and Lead to Governmental Programs Such As Europe’s Proposed “Emissions Trading Scheme”

Airport capacity determined by five components: Airfield characteristics Airspace characteristics Air traffic control Meteorological conditions Demand characteristics

ACI forecasts that the number of passengers will double by 2025 to more than 9 billion….. …..Dulles will be ready.

On a sign overhanging the entrance to the ride at Disney World is the inscription: “Toadi Acceleratio Semper Absurda…."

…which translated means "Speeding with Toad is always absurd."

Happy Holidays and a Joyous New Year