Miscellaneous Construction Topics -The 2013 Version.

Slides:



Advertisements
Similar presentations
1 Helping SHNNY members navigate prevailing wage projects September 17, 2013 Labor Compliance at HPD.
Advertisements

DROPOUT PREVENTION GRANT REPORTING REQUIREMENTS.
Project Estimates There are two types of estimates 1Partial Payment Estimate 2Final Payment Estimate.
George McCue Elections Specialist NC State Board of Elections Annual Training for County Elections Officials April 4, 2012.
Unauthorized Commitments
Introduction The purpose of this guide is to familiarize students and supervisors with the policies and procedures regarding Samuel Merritts.
Know Your Forms: Closing Reports 11/07/2012 HR Operations.
1 Electronic Time & Effort Reports Brought to you by the Offices of Business and Financial Affairs, Innovation & Development, Title I, and Human Resources.
Grant Brown Bag Information Session November 14, 2012.
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
Performance Contract Training July Performance Contracts A Performance Contract is an obligation to pay for non-employee services rendered. Verify.
Housing Notice H Use of New Regulation Section 8 Housing Assistance Payments (HAP) Contracts Residual Receipts to Offset Project-Based Section.
GSA Federal Supply Service DOING BUSINESS WITH GSA.
Wage and Hour Administration Ohio Prevailing Wage Summary Stephen Clegg, Chief Wage and Hour Administration Division of Industrial Compliance.
Rosemarie Day Deputy Director and Chief Operating Officer Thursday, May 8, 2008 Operations Report Current Priorities and Future Plans.
(a) Amount of funds provided: The amount of funds provided under the terms of the contract shall NOT be less than the Secretary would have provided for.
Spill Prevention Control & Countermeasures Compliance and Planning.
Year-End Duties. Cancellation of Warrants – Old Outstanding Checks IC : All checks outstanding and unpaid for a period 2 years as of December.
MDA Disaster Recovery Division Section 3 Program Training on Section 3 Requirements Section 3 Requirements Sponsored by the Mississippi Development Authority.
1 Title I Comparability Requirement Wisconsin Department of Public Instruction.
Massachusetts Department of Elementary & Secondary Education
1 CDBG Labor Standards Requirements For Local Officials.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
U.S. Department of Labor Wage and Hour Division Davis-Bacon Investigation Procedures.
U.S. Department of Labor Wage and Hour Division Davis-Bacon Investigation Procedures.
Chapter 43 An Act Relative to Improving Accountability and Oversight of Education Collaboratives Presentation to Board of Elementary and Secondary Education.
Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction.
October 9, 2013 Labor Compliance Department Boot Camp Presentation 1 Presented by:Andres Posada Angela Kwong.
Today’s Topics: Overview 1.What is an NTC 2.Why do we use them 3.What type of information is required 4.What type of information should be included 5.Labor.
DIVISION OF RESEARCH Utilization of Minority-Owned and Women- Owned Business Enterprises in New York State Sponsored Projects Fall 2009 Kimberly Klatt.
Office of Business Development Training
2002 FDOT/FTBA Construction Conference
Local Agency Program General Information 1. Local Agency Program (LAP) is a re- imbursement program 2. Each Invoice to FDOT should only include one.
Medicaid Hospital Utilization Review and DRG Audits: Frequently Asked Questions The Department of Medical Assistance Services Division of Program Integrity.
Challenges and Solutions.  In it was believed Employers would manage all aspects of testing in-house  Contract directly with a laboratory.
CENTURY 21 ACCOUNTING © Thomson/South-Western LESSON 14-1 Recording A Payroll.
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
Old Policy – which no one ever seem to have heard of.
Improving Understanding, Function and Procedural DBE Compliance ODOT OCR DBE Triage Training Office of Civil Rights DBE Program ODOT Training March 1,
Davis-Bacon, Related Acts, and Your Project Where you can locate the information needed to comply with Davis-Bacon and Related Acts 1.
Grant Requirement Reminders Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
Building Success Stories Monthly Time Sheets Office of Human Resources Mike McCoy.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
How to Prevent Findings Part 2 Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
Allen Hughes State Materials Office
October 2014 Labor Compliance Department Boot Camp Presentation 1 Presented by: Huin Chhay & Aaron Leung.
Labor Standards Pam Truitt  September 10, Key Regulations & Statutes  Davis-Bacon Act  Copeland Act (Anti-kickback Act)  Contract Work Hours.
Anna Bergmark Region 7 Local Program Local Program ARRA Training: ARRA Reporting Requirements.
Webinar for FY 2011 i3 Grantees February 9, 2012 Fiscal Oversight of i3 Grants Erin McHughJames Evans, CPA, CGFM, CGMA Office of Innovation and Improvement.
Employing H-2A Workers in Kentucky Laura Powers Extension Specialist, Tobacco Labor Education and Financial Management Last updated:
Go CATS!!!. KAHC-KYTC Joint Meeting March )Construction Information on Web 2)Formal Acceptances 3)Final Pay Estimates 3\16\07.
Arkansas Association of Federal Coordinators September 23, 2011.
Lynnette Roshell
2005 Regional Environmental Summit: Promoting Environmental Responsibility Providence, Rhode Island - September 28-29, 2005 Session 6A : Reducing Building.
Supervisor Training On-Campus Student Employment.
April 23, 2008 Electronic Certified Payroll Sandia National Laboratories.
Spreadsheets for SiteManager Materials 2007 HIGHWAY CONTRACTOR’S MEETING March 13 th (Bowling Green) March 16 th (Lexington) Presented By: Ross Mills.
DHHS COE Meeting Agenda November 14, 2012 Welcome Introductions Contract Compliance Reporting Questions and Answers DIRM Vendor Management.
Reporting, Public Notification and Recordkeeping 40 CFR ,.32, and.33 Ken Morin Bureau of Land Management.
2016 EEO OFFICERS ANNUAL ON-LINE TRAINING This presentation may be downloaded to your PC in order to complete the training session at your own pace. Presented.
1 Prevailing Wage Compliance 2012 (revised) Prevailing Wage Components Contract Documents Wage Decisions Certified Payrolls Adam Strong – MDOT Prevailing.
DISTRICT AUDITING UPDATE INDIRECT COST AND TIME DISTRIBUTION Melissa A. Austin, Audits Manager SC State Department of Education Office of Finance District.
DEBT COLLECTION / ACCOUNTS RECEIVABLE RECOVERY PROCEDURES Pacific Area Finance Training February 2008.
TRAVEL SERVICES Request for Proposal
Acceptance Process for Manufactured Products by Certification:
Construction Management
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Diversity management system (DMS)
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Presentation transcript:

Miscellaneous Construction Topics -The 2013 Version

Chain of Command with Asphalt Density Cores Asphalt cores are used to determine the in-place properties of asphalt pavement. Based upon the results the contractors pay values are adjusted. The real result is his $$$.

Chain of Command with Asphalt Density Cores(continued) April 25, 2007 Construction Memo No labeled: Asphalt Density Cores In accordance with Subsection part D), we mark the pavement at the randomly determined locations after compaction is completed and the Contractor furnishes the cores to the nearest laboratory facility (Contractor or Department lab) for density determination.

Chain of Command with Asphalt Density Cores(continued) More importantly: Due to apparent inconsistencies in cores, we need to ensure all cores are taken in the presence of Department personnel, transported by us, and remain in our custody until density testing is performed. We realize this will require scheduling and may be difficult with current staffing, but at this time it is necessary in order to maintain the integrity of the results

Audit Findings for Performance Reports March 21 st, 2012 Construction Memo 2-12 labeled Contractor Performance Reports September 10 th, 2012 Independent Accountants Report February 12 th, 2013 Record of Control Weakness

New Type of Contractor Performance Report? Old website version has problems Construction Procurement needs input for prequal process KY Transportation Center is working on Study

Audit Findings for Certified Payrolls

Payrolls Submitted on Federal Projects Why? The Federal Government requires it if we want their money and we want their money.

How did this fall in Construction's lap Criswells idea. Auditors kept writing us up on this. DCP could not determine which contractors were working. DCP tried using SiteManager but the records were not dependable.

Federal Regulation 29 CFR The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls. 2.The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site 3.Each payroll submitted shall be accompanied by a Statement of Compliance, signed by the contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract.

How do I know if it is a Federal Project? Look at the project number. Is the FHWA 1273 in the proposal? QUICK WAY Is it a call 100 or 200?

What to do when you get payrolls Date stamp or Initial and Date them. Send directly to DCP, attn: Tammy Tyson Electronic copies are acceptable and preferred.

Construction Responsibility Do not have to check the numbers. (You can but it is not required.) You should make sure that payrolls have been received within a week for the prime and all subs who worked on the project. Progress payment may be withheld for non- compliance.

Concrete Pavement GPR Method

GPR Testing Highlights Intent is to develop a method for current practices Draft has received positive FHWA review and is being reviewed by industry KY Method is for all new concrete pavements. No patching or other projects which lack grade control KY Method uses KTC for testing KY Method includes tolerances AND repair methods – no deductions Does not include pavement thickness checks – use another KY Method

Any Questions?

Moving On to Training Opportunities