IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI.

Slides:



Advertisements
Similar presentations
MPP für Physik München Sven.Vogt Tel.: IBL CO2 cooling meeting Junction box Manifold box Bart Verlaat,Jan.
Advertisements

Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
IBL Vacuum Box in UX15 Short summary Andrzej Zmuda
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
FUNDAÇÃO PARA A CIÊNCIA E TECNOLOGIA FCT Trainee Program Follow Up João Rodrigo Alvelos Ferreira | Started March 2013 October 2014 TE-VSC-ICM.
Informatikdienste / IT-Services 30. Jan :T. Steiger, ID / SD, Beowulf Day Status Report of Implementations Gonzales.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
IBL CO 2 UNICOS CPC6 based control system Lukasz Zwalinski – PH/DT/PO.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
SCADA and Telemetry Presented By:.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
IBL cooling status Pixel week 15 October 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Claudio Bortolin, Piotr Gach, Artur Szlachcic, Olivier Crespo.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
MARCO UNICOS based control system CERN Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Michal Zimny Cracow University of Technology Seminar - Internship programmes at CERN PH-DT-DI.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
AIDA Traci commissioning LHCb – CO 2 cooling meeting 18 March 2015 Kamil Wojdyla, Lukasz Banasik, Nicola Spadavecchia, Tomasz Kucharski, Piotr Dziurdzia,
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
60kW Thermosiphon control system
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
Chiller + Brine + Water control system UNICOS CPC Lukasz Zwalinski – PH/DT.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Created by Daniel Gargas Student from Cracow University of Technology.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
WA105, SC Collaboration Meeting, CERN, 07th March 2016 AIMARD B., LAPP BALIK G., LAPP BOURGEOIS N., CERN BRUNETTI L., LAPP CANTINI C., ETHz MURPHY S.,
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
Internship final report Joanna Staniszewska Cracow University of Technology –
Teleconference ACS – FREIA 31th May 2017
Experience in Design and Implementation of CO2 Cooling Control Systems
IBBelle: Status & Plans
ATLAS ITk Baby-DEMO update
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Gas System Commissioning
IBL CO2 cooling control system development status
MAUVE CO2 cooling review
Update on Junction Box Design
Insertable B Layer Cooling System
ACS news Circulator TCU: control tests in progress All cavity racks
GUAPI working group meeting June 26th 2013
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
Vertical Cryostat Kick-off metting
CO2 progress and issues on the control systems
Presentation transcript:

IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Presentation overview Rack and boxes naming convention Construction status: Control cabinets Accumulator Local box Chilller control rack Vacuum system rack Cabling Software (PLC+SCADA+local touch screen) Power distribution Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Overview

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Racks and boxes naming convention – USA15 USXUSA Seen from Geneva side Accumulator unit A&BCO2 unit B300Chiller unit B400CO2 unit A100Chiller unit A200Control rack A&BVacuum control A B IBL A&B Accumulator control cabinet FCTIR FCEE-00044FCK-00136FCK A=> FCTIR B=> FCTIR FCUE-00011FCUE FCTIR

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Racks and boxes naming convention – UX15 UX15 sector 5 Z0 FCTIR

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Racks and boxes naming convention UX15 level 6 LAr area FCTIR Signal FCTIR Power

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Construction status – control cabinets Cabling completed by Florian for rack A&B Preliminary I/O check performed by Michal and Marcin (using PLC and SCADA interface + local touch screen) Racks returned to EN/CV for minor modification + FESTO installation Once correction completed + support frame ready, racks will be transported to USA15 Ethernet Network in USA15 requested (installation planned on beginning of October)

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Construction status – Accumulator Local box Completed and ready to be assembled in Accumulator frame! Cabling and assembly done by Kacper Kapusniak. Electrical verification completed.

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Construction status – chiller racks Model prepared by Dawid Patrzalek Electrical schematics completed by Maciek Very soon ready for cabling by Florian Most of the components delivered We are waiting for FI and CARELs – to be delivered with a chiller Chiller Functional Analysis will be prepared as soon as possible by Maciek as additional chapters of the existing IBL FA

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Construction status – vacuum system Model and assembly done by Dawid Patrzalek with help of George Glonti. Electrical schemes under verification Minor parts missing Ready for cabling

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Construction status – vacuum system

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Cabling Cabling is intensively proceeding All signal cables despite 1xNG8 and TC are pulled in between UX15 and USA15 (cooling plant A&B and Vacuum system) All information transferred to ATLAS All power cables ordered and as soon as delivered it can be pulled Cable trays for USA15 delivered, should be very soon installed George is following this task.

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept PLC software We are already after several iterations of code generation I/Os generated and compiled Alarms group and CCC alarms implemented Value calculation implemented Dependent logic to be programmed in next weeks

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept SCADA HMI interfaces (PVSS) Completed and linked for cooling plant A and B Prepared by Michal, Marcin and Daniel

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept SCADA HMI interfaces (PVSS)

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept SCADA HMI interfaces (PVSS)

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept SCADA HMI interfaces (PVSS)

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept SCADA HMI interfaces (PVSS)

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept SCADA HMI interfaces (PVSS)

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept SCADA HMI interfaces (PVSS)

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept SCADA HMI interfaces (PVSS)

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept SCADA HMI interfaces (PVSS)

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept SCADA HMI interfaces (PVSS)

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept SCADA HMI interfaces (PVSS)

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept SCADA HMI interfaces (PVSS)

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Local touch screen – HMI Completed and linked for cooling plant A and B Prepared by Michal, Marcin and Daniel

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Local touch screen – HMI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Local touch screen – HMI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Local touch screen – HMI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Local touch screen – HMI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16 th Sept Local touch screen – HMI