Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.

Slides:



Advertisements
Similar presentations
1 Case Study Case Study Watkins Creek Franklin, TN.
Advertisements

GOLF COURSE HOSPITAL AGRICULTURE WILDLIFE HABITAT WETLANDS OPEN SPACE SCHOOL RECREATION HOUSING DEVELOPMENT WHAT DO ALL THESE PLACES HAVE IN COMMON?
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
High Tunnel Fruit and Vegetable Production
STP Land Application Site Suitability and Selection Considerations in Montana What do I look for besides a willing landowner?
End Use Planning Strategy Turnkey Recycling & Environmental Enterprise (T.R.E.E.) Rochester, NH Waste Management of NH, Inc. Steve Poggi, P.E.
Airport planning.
Site Selection for a commercial aquaculture facility (ponds)
080820_v1DP TRAVEL MANAGEMENT - PROCESS ON THE GILA NATIONAL FOREST.
Year End Review January, 2015.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Approved Due Diligence Scope Property Survey Topographic Survey Geotechnical Exploration Streams and Wetlands Threatened & Endangered Species Cultural.
Land levelling design methods - plane method
Permits. The Process Plans are developed by an Architect or Engineer and presented to the Municipality – State Environmental Quality Review (SEQR) declaration.
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Where is the WATER? By: Chelsy Bird & Kayla Melfi.
Golf Course Construction Site Preparation TRF 250 Golf/Sports Field Construction.
Overview of Watershed Systems
Golf/Tennis-Based Resorts: The Impact of Development on Operations
Wareham Fire District Water Department Glen Charlie Road Water Storage Tank Special District Meeting June 23, 2009.
2010 Agricultural Water Resource Development Workshop Series HOW TO APPLY FOR ASSISTANCE “PRELIMINARY SITE ASSESSMENT – THE PROCESS”
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Session 131 A community profile provides a base for overlay analysis and for discussing a hazard’s impacts on a community.
Beef Island the last of “Nature’s Little Secrets” Beef Island the last of “Nature’s Little Secrets”
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
 Goals & Objectives ◦ Goal is to set a general framework for the project  develop the expected result or outcome of the project  (e.g.) The trail design.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
Whenever you see me, click on me to learn more!
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Butterfly Village (PLN080209) Monterey County RMA- Planning Director July 30, 2008.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Author name here for Edited books chapter 5 Facility Site and Design 5 chapter.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
September 25, Who is Brushy Creek Regional Utility Authority? Local government corporation formed by Cedar Park, Leander and Round Rock to access,
Environmental Toolbox. Technical Module Introduction.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Definitions.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
Figures & Maps Documentation Floodplain (FIRM) Maps Wetland (NWI) Maps Site Maps Conceptual Site Development Plan.
PLANNING CONSTRUCTION. Initiating Construction private sector – residential, industrial, commercial public sector – public works.
Learning the Basics of Recreation Facilities 3 chapter.
Prepared by: Alex Fisch Planning Services Division.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
Learning the Basics of Recreation Facilities
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
Missouri Waste Control Coalition Environmental Conference July 14, 2015 CCR Rule What Location Restrictions Mean for Missouri.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
Definition: Soil and water conservation engineering is the application of engineering principles to the solution of soil and water management problems.
Where critical areas & agriculture meet
Town of Brighton, Department of Public Works
WHAT DO ALL THESE PLACES
Baseline Performance Measurement Report
Hydrosphere Notes Parts 4- Watersheds.
Investigation of Road Project
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
Concept Plan for Proposed Park Near Hopewell School
Elaborating The Committee Charter:
Whenever you see me, click on me to learn more!
Competency: Create site plan drawings
WHAT DO ALL THESE PLACES
Site Selection for Aquaculture
WSUP The Club at ArrowCreek Grading
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
Chapter 8: Site Selection
WSUP & WADMIN The Club at ArrowCreek
Presentation transcript:

Golf Course Construction Planning TRF 250 Golf/Sports Field Construction

Introduction Tremendous under taking time and capital Requires dedication and attention to detail Pay me now or pay me later

Over all objective Construct greens, tees, bunkers, fairways, and roughs Construction of these areas must be in a fashion that will allow the area to be properly maintained These areas must also distinguish the golf course from outer courses

Good Golf Courses are the result of: Careful, detailed, and organized design and planning Good communication among all parties Attention to construction details and management Must have detailed contracts and specications

Golf course construction timeline 5 months – 2 years Construction should be finished before or at optimum time for establishing turfgrass

Property Selection Influences all areas of construction Unproductive land sites: strip mines, quarries, and land fills Residential or resort development

Principal considerations in Property selection Economics Acreage Topography Soil Vegetation Environmental restrictions Water Utilities

Economics Supply and Demand Demographics (who are your customers going to be?) Potential demand Existing golf courses Cost associated for land purchases Return on ivestment

Acreage More the better 18 holes approximately 150 acres More acreage may be needed if wetlands and topography are and issue Additional acreage will be needed for roads, maintenance facility, club house and routing of golf holes Housing considerations

Topography Gives GC character Determines traffic flow and layout of holes Cost concerns if large scale earth movement is required Elevation changes of 150 feet or more can make GC difficult to walk also can effect landing zone visibility Flat areas may need substantial earth movement to add character

Soil Drainage Coarse textured soils preferred over finer textured soils Drainage issues: carts, play, course conditions Sandy loam soil ideal ( good drainage and moisture retention)

Vegetation Natural vegetation adds to beauty of course Vegetation will have to be cleared and cost could be considerable Environmental impact studies may have to be conducted Trees can be sold to offset some construction cost Vegetation can be cleared and burned if allowed by law

Environmental restrictions Wetlands Floodplains Endangered plants or animals Areas with Archaeological or historical significance may also have some restrictions placed upon them

Environmental restrictions cont. Wetlands may not be able to identify just by looking at them A wetland is any area where the water table rises to with in 6 inches of the surface for more than two weeks per year

Environmental restrictions cont. Wetlands: Natural bodies of water Marshes Bogs Seasonally flooded lands Wet lands can not be filled (some states allow wetlands to be filled if new ones are created)

Water ,000 gallons of water per acre per day in the summer Sources: Streams, creeks and rivers Lakes and ponds Drainage canals, wells Municipalities and utility companies Effluent Clean salt free water is desirable

Utilities Electricity Fuel Availability or distances from these services should be determined before construction begins

Golf Course Design Golf course architect there job is to rout golf holes to take advantage of property and to blend holes into the natural surroundings

Golf Course Design Architect uses natural topography to design interesting holes Uses topo maps to select areas for greens and fairways Slopes in excess of 5% for greens and 10% for fairways are considers too sever and make tying in those areas with the natural topography difficult Architect also must connect holes into suitable loops of 9 to 18 holes

Clubhouse selection Access to GC Room for expansion Two starting and finishing holes Parking lot Entrance road Fuel and electricity access Maintenance building

Irrigation design Critical to success of golf course Hire a qualified irrigation system designer

Permitting and engineering Time consuming and expensive Acquire permits as soon as possible prior to detailed design Wetlands and flood plains must be identified and approval sought to utilize in course design Other possible permits: water flow obstruction of rivers and streams, land clearing, vegetation burning, proposed water use source, electricity and or other power sources

Meeting with local groups Before or after permitting phase planning group should meet with : All regulatory agencies Environmental groups Interested citizens To review and modify design using their inputs when ever possible