LECTURE 2: TENDER PROCESS AND DOCUMENTATION

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Construction Contracting
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
CONTRACTS AND TENDERS. What is a contract? When two or more persons have common intention communicated to each other to create same obligation between.
STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
Tendering Yuck!.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
CIVL202 Construction Engineering I
PROCEDURES FOR SELECTING THE CONTRACTOR
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
1 Bid evaluation - Works  Clarification of bids ( if necessary)  Determination of responsiveness “Substantial” responsiveness No material deviations.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
PROCUREMENT POST REVIEW OF WORLD BANK FINANCED PROJECTS IN INDIA October 11, 2007.
1 PRESENTATION ON TENDERING REQUIREMENTS Presented by Kenya National Highways Authority (KeNHA) Team.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Public Procurement Procedure – Bidding Documents
United Nations Procurement Division
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
Specification & Quantities Estimating
VALUE FOR MONEY 1 OGC buying.solutions Procurement of Projects Presented by Andy Hamer Pre Accession Advisor, Finance Ministry.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
CONSTRUCTION CONTRACTS DOCUEMENTS
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
Public Procurement Uinsinn Finn Galway County Council Roads, Transportation, Marine.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Marketing to Main Contractors Winning Work from a Main Contractor Paul Clarkson Iain Flatters Construction Director Group Procurment Manager.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Getting work © 2013 Andrew Ross and Peter Williams. Published 2013 by John Wiley & Sons, Ltd. 1.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
FIDIC Tendering Procedures
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Tender Evaluation and Award Process
Preparation of a tender and tender documents
Content of Tender Dossier - Instructions to Tenderers - Tenders
Award Management Services
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Pre-Contract Phase -
Administration of a FIDIC Contract - Financial Management
Evaluation Grids Evaluation Grids.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Particular Conditions of Contract & Appendix to Tender
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Request for Proposal & Proposal
Pre-contract Planning and Practice
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Engineering Project Tendering.
PROJECT DELIVERY METHODS
Candidate Registration & Induction
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

LECTURE 2: TENDER PROCESS AND DOCUMENTATION Lecture by: Ms. Noorhidayah Sunarti (012-6254776) LOC1/AC2

WHAT IS TENDER? LOC1/AC2

Tender is an offer which incorporates the sum of money, time and other conditions required to carry out the contract obligations in order to complete a project or a part of it consisting of specified works. LOC1/AC2

WHAT IS TENDERING ? LOC1/AC2

Stages of a project Stage 1: inception & feasibility – identifying project objectives / set up project brief Stage 2: design – develop further project brief / develop concept & schematic design / Undertake detailed design & detailing / prepare cost plan & budget Stage 3: tendering – issue tender documents / prepare & submit tender / evaluation of tender / award tenders / prepare contract documents LOC1/AC2

Stages of a project Stage 4: construction – site possession & mobilization / undertake procurement fabrication, installation, construction / carry out contract admin Stage 5: handover & maintenance – undertake all testing, commissioning & training / obtain CF / handover project to owner /carry out necessary maintenance / Defect rectification / etc LOC1/AC2

Tendering Will be started after the design complete and project budget must be approved The process that is used to obtain offers leading to a contract between: client contractor client consultant main contractor sub-contractor LOC1/AC2

Purpose of tendering process To select a suitable contractor at a time appropriate to the situation of the project. To obtain from the contractor selected at the proper time, an acceptable tender or offer upon which a contract can be let. LOC1/AC2

Difference between a contract and a tender A tender formally means an invitation to trade under the terms of offer. A contract is the term used for when the parties have reached agreement. LOC1/AC2

General TENDERING PROCESS LOC1/AC2

Tendering process – PRINCIPAL ACTIVITIES Selection of the most preferable or appropriate contract procurement method. Development of tender list Preparation of tender documentation Invitation / calling off tender Preparation and submission of tenders LOC1/AC2

Tendering process – PRINCIPAL ACTIVITIES (cont’d) Receipt and opening of tenders Evaluation of tenders Acceptance of tender award or award of contract LOC1/AC2

Traditional contract procurement route Stage 1: Selection of the most preferable or appropriate contract procurement method. Traditional contract procurement route Longer time – lead to critical work scheduling Less errors – more precise Fast-track contract procurement route Shorter time Consequences – may be lead to critical error, variation. LOC1/AC2

Stage 2: Development of tender list Potential tenderers can directly apply to the employer for future works. Employer generate list based on previous dealings The professional team generate their own list and recommend to the employer. LOC1/AC2

Stage 3: Preparation of tender documentation – typical contents Letter of invitation Checklist for submission of tender Articles of agreement Conditions of contract Form of tender Tender specifications Bills of quantities Tender drawings Sample copy of letter of acceptance Sample copy of bang guarantee for performance bond Schedule of day work rates Sample copy bank guarantee for advance payment LOC1/AC2

Tendering process Stage 1: PREPARATION Stage 2: APPROVAL TO TENDER DOCUMENTATION Stage 6: AWARD CONTRACT Stage 5: PROCESSING Stage 4: INVITATION LOC1/AC2

Stage 1: Preparation Final completion of drawings, specification, measurement / take-off process. Choose conditions of contract. Parties involved: architect, engineers, QS, client, project manager LOC1/AC2

Stage 2: Approval to tender Discussion and decision on type of tender to be used. Selection of tender: Open Selective Negotiate Parties involved: CLIENT, CONSULTANT, PROJECT MANAGER Shortlist the selected contractor LOC1/AC2

Stage 3: Documentation Contract based on tender & specs Compilation of: Letter of invitation to tenderers Articles of agreement / conditions of contract Form of tender Form of tenderer’s details. i.e: contractor’s registration, organization background, track record (past and present projects) Letter of acceptance Bank and insurance guarantee forms (performance bond) Bank and insurance guarantee forms (advance payments) Specifications Summary of tender Schedule of rates Relevant drawings Contract based on quantities Compilation of: Letter of invitation to tenderers Articles of agreement / conditions of contract Form of tender Form of tenderer’s details. i.e: contractor’s registration, organization background, track record (past and present projects) Letter of acceptance Bank and insurance guarantee forms (performance bond) Bank and insurance guarantee forms (advance payments) Specifications Bills of quantities Relevant drawings LOC1/AC2

Stage 4: Invitation Based on selection of tendering methods Open / competitive / bid tender – produce tender notice Selective – shot listed contractors will be invited to tender if they wish Negotiated – only one contractor is approached- direct entry to project LOC1/AC2

TENDER NOTICE OR NOTICE INVITING TENDER LOC1/AC2

The Internet is a very cost effective way of publishing the tenders. The Tender Notice is a brief description of the job being tendered which is to be published in Newspapers and on the Internet. The Internet is a very cost effective way of publishing the tenders. LOC1/AC2

Format of an ideal Tender Notice Name of the Project. Name & Address of the Company floating the tender. Name of work, materials or services. Place of work location. Approximate estimated cost of work. Earnest Money. Period of completion. Date on which the Tender Document sale commences. Date on which the Tender Document sale commences. Date and time up to which tender documents can be obtained. The cost of tender documents. The date and time up to which the tenders to be submitted and are to be opened. Specification. Eligibility Criterion. LOC1/AC2

Stage 5: Processing Received tender submitted by contractor Tender assessment / evaluation Completed tenders are received Arithmetical check Reasonable tender sum Reasonable completion time Capabilities of tenderers under considerations Tender recommendation / report – tender board LOC1/AC2

Guidelines to fulfill in the Tender System The capacity, past credentials and financial status of the tendered is thoroughly investigated before awarding the contract. These aspects should be commented in detail along with the tender documents. The rates should be quoted in the numbers and words without any corrections. To take advantage of any possible increase in statutory taxes & duties, the tax component such as excise duty, Sales Tax, Works Contract Tax, etc. should be clearly indicated. LOC1/AC2

Tenderers should not quote many special conditions as some of them may have financial implications, did this can be added to your quoted cost. Also it creates confusion and creates room for manipulative forces. The rates quoted for individual items should be realistic and should not be abnormal and unworkable.   LOC1/AC2

Stage 6: Award contract Pre-award meeting with contractors – validation of lowest complying bid Validate lowest bid - Pre-contract meeting with contractor for contract signing Approval by tender board / treasury (tender exceeds RM10 mill.) – an acceptance of tender form is issued to tenderer , signed by the authorised officer LOC1/AC2

TENDER PROCESS FOR CONTRACTOR LOC1/AC2

Tendering process Stage 1: Decision to tender Stage 2: Determine basis of tender Stage 3: Preparation of cost estimates Stage 6: Submission of tender Stage 5: Conversion of estimate to tender Stage 4: Commercial appreciation LOC1/AC2

Stage 1: Decision to tender Receipt of tender documents Pre-tender data sheet Decision to tender Consider implications of: Bonds Warranties Parent company Guarantees Funding LOC1/AC2

Stage 2: Determine basis of tender Abstract materials and subcons Sent out enquiries Consider construction methods / prepare method statement Design temporary works / consider alternatives Prepare outline programme Check major quantities Identify restrictions Visit site and compile site report Campaigning meeting (designating areas responsibilities) LOC1/AC2

Stage 3: Preparation of cost estimate Calculate recurrent rates using: Operational Unit rates Man-hours estimating Analyse and check subcontractors’ quotations Price prelims / general items (in association with members of the team Prepare summary sheets LOC1/AC2

Stage 4: Commercial appreciation Tender committee meeting part 1- Review: Method Programme Technical and commercial risks Cash flow and finance Use of own plant Competition Commercial opportunities Economic climate Check prelims against historical cost data LOC1/AC2

Stage 5: Conversion of tender estimate to tender bid Tender committee meeting – part 2 Calculate ‘spread’ and add to estimate LOC1/AC2

Stage 6: Submission of tender Submit in format required Organize delivery LOC1/AC2