Saturday 30th June - Sunday: Rocky !

Slides:



Advertisements
Similar presentations
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Advertisements

● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ion Commissioning: Thursday & Friday
LHC Status Tue Morning 22-Aug
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 11/07: Recovery Plenty of accesses.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
LHC Morning Meeting - G. Arduini
Monday – recovery from MKI flashover
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Thursday morning 09:30 Dump of pPb fill.
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Thursday 10th May - morning
Saturday 2/4/ :00-09:00 Problems with SPS:
LHC Operations overview Week 28 – Getting back
Tuesday 20 March 2012.
Week 35 – Technical Stop and Restart
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
Yesterday’s morning’s controls issues
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
Wednesday 03/11 – The Plan Finish electron-cloud program:
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Wednesday 10/5 Cryo recovery until 18:30
Aims for the week Recover from technical stop and precycle at 10A/s
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Saturday Nov Stop proton operation. Switch back to ions
Thursday 26th July 13:21 Fill 2880 beam dumped
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Wednesday 23/2 Thanks CRYO!!!.
Thursday
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Wednesday morning / afternoon
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Tuesday
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Presentation transcript:

Saturday 30th June - Sunday: Rocky ! 04:45 problem with RQX.L8 solved 07:00 injection probe beam XPOC problems – wrong limits loaded after TS & new soft to create limits 10:00 Ramp with 2 probes: loosing most of the beam on the ramp 12:20 Ramp with 2 probes, again losses, attempt of chroma measurement in collision 14:45 Scraping nominal beam for BPMS checks: ok 16:30 BPMS interlock tests with bumps: ok Recuperating RF settings 19:15 BPMS checks with 50 ns, 12 bunches: ok 20:03 Start ramp 3 bunches for Totem alignment 20:30 Dump in squeeze, electrical perturbation 400 kV line 22:09 Start second ramp for Totem alignment 23:10 Totem starting alignment 01:09 Totem alignment finished (fast!). Also move Alpha in. 01:56 Dump for the leap second. 04:18 Ramp for loss maps 05:53 OFF momentum loss maps in collisions with RP in 06:46 Electrical perturbation (EDF) switched OFF 2 RF modules, 5 sectors (S12, S23, S67, S78, S81) and the dipoles of ALICE and LHCb 07:30 pre-cycle – collimator steps to be recovered 01/07/2012 LHC 8:30 meeting

First energy ramp with pilots Not so good... 01/07/2012 LHC 8:30 meeting

Two pilot ramps with large losses 10:00 & 12:20 Second ramp reduced chirp and frequency modulation: not much better Losses all through the ramp, nothing obviously wrong Beam dump at 4 TeV ok But not very good chroma measurements... Decide to call the RF, as more losses when freq. modulation on Themis (RF) Beam Phase Loop: A subset of the beam phase loop persistent settings were apparently set to zero when the module was re-initialized after the technical stop. We are suspecting that some controls changes during the week had adverse consequences. As a result we were effectively running with the beam phase loop open. This explains the debunching issues at flat bottom and during the ramp.   01/07/2012 LHC 8:30 meeting

Themis (RF) Continued Since the settings were lost, Daniel inserted temporary settings so that the LHC program could continue. These settings are NOT optimal for high bunch intensity operation, but should not interfere with the initial intensity ramp-up. We are hoping that the controls experts will be able to recover the persistent data. Otherwise, some time will be necessary to reset the beam phase loop on Sunday/Monday. No debunching was observed in the next injection. Shortly before the above steps were completed, all four cavities of module 1B1 started oscillating. After our investigation, we once again found that even though the settings that had been adjusted during the RF startup yesterday were correct in FESA, they had been overwritten in the actual hardware. This is a bit concerning since it seems that running the sequencer was sufficient to introduce this error. We will also follow this up with the controls experts. Everything seemed a lot better afterwards. Ramp 3 bunches for RP alignment was OK Optimised settings put back Sunday morning 01/07/2012 LHC 8:30 meeting

Manual chroma in second pilot ramp Vertical chroma seems ok Horizontal (close to) negative Better repeat some time with better tune signals 01/07/2012 LHC 8:30 meeting

Check of interlock BPMS in IP6 Checks required after interventions during TS Checks done Scrape bunch and check when reading lost = IL triggered: At 2e10: perfect Bump the beam and check when interlock triggers At 3.0 +/- 0.1 mm: perfect Check orbit reading with 50 ns trains, done with 12 bunches, relative to TCSG / TCDQ retraction OK 01/07/2012 LHC 8:30 meeting

But BPMS not completely transparent... ...but dumped beam on first 12 bunch injection and first pilot injection OK afterwards Seems like a bad reading To be followed up But also some other BPM crates needed rebooting 01/07/2012 LHC 8:30 meeting

Roman Pot set-up & loss maps Totem very fast and efficient: needed 2 hours. Also moved Alpha in Moved RP out for dump for leap second at 02:00 04:00 Ramped for loss maps with Roman Pots in Collisions to perform loss maps. We carried out betatron loss maps in both planes, both beams (B1V lost very much intensity when crossing the resonance). We then did the OFF momentum loss maps (with very low intensity left in B1) and the beams were dumped by the unmaskable BLMs One more ramp this morning for loss maps (see later) 01/07/2012 LHC 8:30 meeting

02:00 Leap second The recovery took about 2h as the communication with many systems was affected and we had to reboot the consoles and many control systems From Alastair As planned during the previous week the following BE/CO staff arrived to handle the leap second insertion: - Jean-Claude Bau (to restart the LHC and Injector timing hardware) - Alastair Bland and Luigi Gallerani (to observe the time change in the 1400 or so computers) - Mark Buttner and Peter Jurcso (to restart parts of the LASER Alasrm system and/or Diamon) + Stefan Lueders (IT/CS) who volunteered to help communicate with IT A few minutes before 2am all the accelerators were stopped. At 1 second before 2am the leap second was inserted. The 1400 or so Linux Servers, Consoles and Front Ends + the LynxOS Front Ends correctly inserted it. Some problems coming back – finally all worked out 01/07/2012 LHC 8:30 meeting

Plan Already put back the optimised RF settings Sort out lost steps in collimators after power cut One ramp for loss maps Betatron end of squeeze with ADT In collision move in RP and asynch dump Injection loss maps (1 h) If all OK can start intensity ramp up 01/07/2012 LHC 8:30 meeting

Intensity ramp-up Sunday afternoon: 84 bunches: 2 hours Stable Beams 480 bunches: 6 hours Stable Beams for ATLAS (but don’t refill) 840 bunches + 12 non colliding: Production fill 1380 bunches: Production fill 01/07/2012 LHC 8:30 meeting