Update of the Detector Program for ILC Sakue Yamada March

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Signing LOI for ILD detector concept at ILC Deadline LOI submits march 31st 2009.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Second Independent Evaluation Roles / Responsibilities & Relationships.
Slides for Project Review 15 Dec ILD Future Colliders ILC, ILC-CLIC & Detectors ILD  VTX,LCTPC,CALICE.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
Discussion/ Planning Session -ILD organisation: status and plans -Concrete plans -Report from the R&D group: Jan Strube -Report from the parameter group:
Report from Physics and Detectors Sakue Yamada Beijing March 26, 2010 The activity of the two detector groups IDAG monitoring Common Task groups.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008,
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
Status of the ILC Detector activities Project Advisory Committee October 20, 2008 LPNHE,Paris Sakue Yamada 1.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
The collaboration has been created in 2002 for 5 years > Developpment of the software for PFA > Design, construction of prototype to test with beam the.
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Recent Development of Detector Activities for ILC CCAST07 Nov Introduction Call for LOI & mechanism of selection IDAG Benchmarks Common.
J. Brau SiD Workshop (RAL) April 14, Recent Developments on Global Detector Coordination.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
RD’s Report Sakue Yamada May 23, /05/231 Sakue
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
New Organization and activities for the detector Sakue Yamada ECFA LC Warsaw June 9, 2008 Introduction IDAG LOI groups Common task groups ILC-CLIC.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
J.P.DelahayeTILC08: 06/ 03/ 081 CLIC-ILC Collaboration? Following visit of CERN (Nov 07)
Comments on the February DOE Review
Relations with concept groups
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
Oct 22 Group Leaders Planning meeting
GDE and ASIA ACFA ALCSC.
ICFA Report to C11 August 2016 to August 2017 J. Mnich (DESY)
The ILC Control Work Packages
PDAP Junji Haba, KEK.
Report on plan to produce an Engineering Design Report
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
CLIC-ILC BDS & MDI work.
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
Technical Design Report preparation
The DBD: Outline and Scope
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
CLIC/ILC Collaboration Meeting: Objectives & Organization
R&D for ILC Very Forward Calorimeters
Workshop charge F. Richard for the WWS-OC
Andrei Seryi Materials for discussion TILC-08
Second Independent Evaluation of UNAIDS
Presentation transcript:

Update of the Detector Program for ILC Sakue Yamada TILC08@Sendai, March 03. 2008 Organization IDAG Renewed Timeline LOI due date How to handle LOIs Next steps

Organization Management structure was made. Directorate: RD + 3 regional contacts The first Reg.Contacts: 3 WWS-OC co-chairs J.Brau (Americas), H.Yamamoto (Asia), F. Richard(Europe).   The nomination was endorsed by each region. The other board or common-task groups will be formed next, after identifying LOI groups. Common task groups: Reorganized from WWS panels, Details will be fixed through discussions with the LOI groups and/or GDE. Next slide

ILCSC FALC IR Integration PAC IDAG Executive Board RD GDE Jan.09,2008 FALC PAC ILCSC IDAG Executive Board RD GDE WWS organizers Regional Contacts LoI-representative Common task representative Phys.&Exp.Board LoI C LoI B LoI A IR Integration MDI-D Engineering Tools R&D panel R&D Collab. Software panel Th’s Physics Panel Outreach Panel

International Detector Advisory Group IDAG members were named last December and were approved by ILCSC. Members Experiment & Detector Michael Danilov ITEP Michel Davier (Chair) Orsay Paul Grannis Stony Brook Dan Green FNAL Dean Karlen Victoria Sun-Kee Kim SNU Tomio Kobayashi Tokyo Weiguo Li IHEP Richard Nickerson Oxford (                ) Phenomenology Abdelhak Djouadi Orsay Rohini Godbole IIS (                )   Accelerator Tom Himel SLAC Nobukazu Toge KEK Eckhard Elsen DESY Half of the experimentalist are from non-ILC community

New Timeline After the budget cut in UK and US, GDE worked out a new stretched timeline. The detector community appreciates GDE’s determination to go forward. We also wish to keep going forward in synchronization with GDE’s new timeline. We think it extremely important to maintain the interest and enthusiasm of the community. How ?

Where are we now ? This was approved by ILCSC on Feb 11. We were about to add to the ongoing R&D phase another technical design phase, where various integrations are to be studied thoroughly. Components & software  optimized system In Particular Machine Detector Interface to integrate detectors and the machine, which is one of the critical items of the GDE’s list. For the desired progress, ILCSC started the LOI procedure, which was timely and began to function effectively to stimulate and organize detector groups. In order to keep the present momentum, we wanted to continue the LOI procedure. This was approved by ILCSC on Feb 11.

Necessary Modifications also approved a) The aims of the studies matched with that of GDE. Engineering design  Technical design b) The pace and the purpose of the LOI procedure need to be readjusted to meet the slowed down progress of LOI groups and to keep synchronized with the timeline of GDE. More preparation time for LOI was preferred. ILCSC agreed to postpone its due date by 6 months. time to recover and not to lose momentum

Validation of LOIs, instead of Selection In order to make clearer that the aim of LOI process is for studying technical design, we wish that selection of two is NOT made but LOIs are validated by IDAG. More Cooperation than competition among the LOI groups In case there are too many so that detailed studies of MDI becomes difficult, some reduction may be required based on their level of performances for physics and/or group’s capability to conduct the study.

Proposed Detector Plan Letters of Intent   -- due date end March, 2009 Leads to validation of performance by IDAG Machine-Detector Interface efforts intensified IDAG reviews LOIs, with aim to validate Detector Design in 2 phases Till 2010, Detector Design phase I ---- GDE’s TDP-I Till 2012, Detector Design Phase II ---- GDE’s TDP-II

Detector design phase I -- to 2010 Focus R&D on prioritized area and critical elements Complete validated detector specification and initiate technical design work Update of physics performance Detailed studies of machine-detector interfacing Phase I of MDI design GDE-TDP- I Prioritized R&D for risk reduction and for final focus MDI ILCSC suggests to make a more concrete list. Consult IDAG. Interim Report ?

Issues to study Brush up component R&Ds MDI issues e.g. Si detectors which are developing fast MDI issues Final focus, shielding Infrastructure: cooling, crane, installation of big items Push-Pull mechanism and alignment Position reproducibility How can we alignment the detector position after moving ? And how quickly and accurately? Details of various causes of performance deterioration dead material(cables, support), overlapping or connection of different elements, effect of malfunctioning elements

Detector Design Phase II -- till 2012 React to LHC results Final confirmation of physics performance Complete necessary R&D Complete technical design for ILC proposal Complete MDI technical design Complete reliable cost role up Prepare for financial plan GDE-TDP- II Complete technical design and R&D needed for project proposal Documented design Complete reliable cost role up Project plan developed

ILCSC FALC Next Step IR Integration PAC IDAG Executive Board RD GDE Jan.09,2008 FALC PAC ILCSC IDAG Executive Board RD GDE WWS organizers Regional Contacts LoI-representative Common task representative Phys.&Exp.Board LoI C LoI B LoI A IR Integration MDI-D Engineering Tools R&D panel R&D Collab. Next Step Software panel Th’s Physics Panel Outreach Panel

Next step Call for Expression of Interest in order to identify who will prepare LOI and to organize common task groups One important task among the common tasks is to work on MDI. EOI Due date: March 31, 2008 Needs to state: Representative(s) or contact person(s) to attend P.& E. Board ( up to 2 names). Participating institutions (individual names of members not needed) Which common task(s) to participate (MDI + …) Willingness to work on the agreed benchmarks (prepared by WWS-OC software panel)

Common Tasks All LOI groups work together on important issues The number and details of tasks may vary in time through discussions with the community Actions have been taken by WWS or in the ILC community for many topics and for many years.  reorganized or collaborate

Common task groups MDI group: So far studied by WWS-MDI group It communicates with the accelerator team (GDE’s BDS) on final focus, radiation shield, beam dump, Push-pull mechanism, infrastructure Engineering tools: To set up common tools for designing between Acc. &Det. Detector R&D Panel: Seek possibility to cooperate in Det. R&D. Detector Collaborations will be loosely linked to this organization through the R&D Panel. Detector Collaborations keep independence. Software panel: Common works on Software benchmarks of detector performance, event simulation, DAQ, Reconstruction, data reduction, data storage, data distribution Physics: Prepare for physics related issues physics benchmark, study energy choice, Interaction with other colliders/observations

Conclusions Detector community wishes to go forward with a new plan stretched till 2012 and synchronized with GDE to keep the momentum of the community with the LOI process. Due date is shifted by 6 months, to be end March 2009 Instead of selection of 2 LOIs, validation of LOIs will be made. Call for EOI is made. Due date end March, 2008.

Back ups slides

Generic R&D vs Integration Generic R&D is important and must be continued. Integration study is required, too, for MDI studies & for the examination of realistic performance. There will be feed backs to generic R&D, on e.g. requirement on stability, robustness, heat dissipation, temperature dependence, effect of the magnetic field etc, etc.

International Detector Advisory Group IDAG members were named last December and were approved by ILCSC. Members Experiment & Detector Michael Danilov ITEP Michel Davier (Chair) Orsay Paul Grannis Stony Brook Dan Green FNAL Dean Karlen Victoria Sun-Kee Kim SNU Tomio Kobayashi Tokyo Weiguo Li IHEP Richard Nickerson Oxford Sandro Palestini CERN Phenomenology Abdelhak Djouadi Orsay Rohini Godbole IIS JoAnne Hewett SLAC   Accelerator Tom Himel SLAC Nobukazu Toge KEK Eckhard Elsen DESY Half of the experimentalist are from non-ILC community