Junji Urakawa (KEK) for ATF International Collaboration

Slides:



Advertisements
Similar presentations
BILCW07 - Feb 2007 Global Design Effort 1 RDB S3: Damping Rings R&D Junji Urakawa for Andrzej Wolski (Cockcroft Institute), Susanna Guiducci (INFN-LNF),
Advertisements

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 1 DR Kicker R&D: Goals and Work Scope Michael S. Zisman and Tom Mattison.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURING AND EXPERIMENTAL PROGRAM C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT),
Stripline Kicker Project LBL LLNL SLAC KEK DESY. Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β,
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
1 Experience at ATF To get a low emittance beam Junji Urakawa KEK Circumference: m Arc Cell Type: FOBO Number of Arc Cells: 36 Energy: GeV.
Status of Fast Pulser and Kicker Work at UIUC and Cornell Robert Meller Cornell University Laboratory for Elementary-Particle Physics.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Status of ATF Fast Kicker Experiment
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Injection/extraction R&D Summary S. Guiducci (INFN), Thomas Mattison (UBC) KEK - ILCDR07, Dec 207.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
Non-EC R&D KEK Junji Urakawa at INFN. Discussing issues : 1. Experimental confirmation for the threshold of Fast ion instability Need clear data.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Damping Ring Injection and Extraction Damping Ring EDR Kickoff Meeting Daresbury UK 5-7 November 2007 Thomas Mattison University of British Columbia.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
TPS pulse magnet measurement
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
DR Kicker R&D: Goals and Work Scope
Fast Kicker R&D in the Americas Region
Fast Ion Experiments at ATF
Bunch Separation with RF Deflectors
Beam Injection and Extraction Scheme
Damping Ring Kicker Tests at AØ
Pol. positron generation scheme for ILC
Strip-line Kicker R&D at KEK-ATF
Fast ion instability WP 15
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
Junji Urakawa ( for collaborators ) March KEK at LNF
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
CEPC Injector Damping Ring
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Instability measurement plans at ATF
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Proposal for a CESR Damping Ring Test Facility
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Injection design of CEPC
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Specifications for the XFEL Beam Switchyard Kickers
Presentation transcript:

Junji Urakawa (KEK) for ATF International Collaboration Kicker Test at ATF Junji Urakawa (KEK) for ATF International Collaboration 2018/9/21 Sendai-GDE 2008

ATF Accelerator Test Facility ILC like beam for ATF2 ATF-II EXT Damping Ring 1.3GeV Linac Photo-cathode RF Gun which can generate 20 bunches/pulse. 2018/9/21 Sendai-GDE 2008

ATF (Accelerator Test Facility) Pulsed Laser Wire scanner Beam size monitor Cavity BPM nm resolution beam position monitor Energy: 1.28 GeV Electron bunch: 2x1010 e/bunch 1 ~ 20 bunches/train 3 trains/ring 1.56 Hz x/y ~ 1.5nm/4pm Extraction line Beam supply for BDS Exp., instrumentation R&D CSR Damping Ring Low emittance beam generation Study on beam instability Instrumentation Development Fast kicker Strip-line fast kicker development XSR S-band Linac Photo-cathode RF gun 2018/9/21 Sendai-GDE 2008

Beam Kick test of Fast kicker (KEK, LLNL, SLAC, LBNL,LNF) 2005-2006 Rise time<3 ns Evaluation on kick angle from coherent beam oscillation in ATF damping ring 2007〜2008 Design and demonstration for real beam extraction. Rise time = 3.2ns (1%~100%) Fall time = 4.0ns (100%~1%) Pulse Train (3000 pulses)output from FID Pulser Burst pulses(3MHz, 3000pulses) 2018/9/21 Sendai-GDE 2008

Design and beam test for strip-line fast kicker experiment Present kicker stability (Pulse magnet kicker system) 308ns pulse width 10kV 1ns:rise time, fast Pulse power supplies Multi-bunch beam supply to ATF-Ext. 60 bunches with 154 ns spacing. 30 bunches with 308 ns spacing. 3 bunches, 154ns spacing 2018/9/21 Sendai-GDE 2008

Future Kicker Tests at ATF New septum and a "slow" orbit bump would allow fast extraction using two 30 cm strip lines, driven by ±10 kV pulsers. +10 kV -10 kV 30 cm Bump orbit The length of each strip-line is limited by the rise and fall time specifications: the maximum length is approximately 30 cm. Each strip-line is driven by two pulsers operating at ±10 kV, providing a voltage between the electrodes of 20 kV. Beam extraction at the end of 2008 2018/9/21 Sendai-GDE 2008

2018/9/21 Sendai-GDE 2008

Beam Kick test of ILC Fast kicker (KEK,LLNL,SLAC,LNF,LBNL,DESY, FID) This experiment almost shows perfect kick timing control. rise time improvement by using waveform compensator. 3 ns -> 2.2 ns Pulse Train (3000 pulses )Output from FID Pulser 2018/9/21 Sendai-GDE 2008

Multi-bunch Turn-by-turn monitor T. Naito (KEK) The beam blowup at tail bunches was measured by the laser wire in ATF, which is assumed coming from FII effect. In order to observe the individual beam oscillation in the multi-bunch beam, multi-bunch turn-by-turn monitor has been developed. This monitor consists of front end circuits(amplifier and filter) and DPO7254 scope. The scope can store the waveform up to 2ms with 100ps time resolution. When one bunch from many bunches is kicked, we hope other bunches have almost no oscillation. 1st 2nd The preliminary results shows the different oscillation amplitude of the tune-X and the tune-Y for the 1st and 2nd bunches at just after injection. Tune-X Tune-Y 2018/9/21 Sendai-GDE 2008

Multi-bunch Beam extraction design for Future Kicker Tests at ATF Multi-bunch Beam extraction by using strip-line kickers and pulse bump orbit system was designed, which can extract up to 60 bunches with 154ns bunch spacing. The space for installation of the strip-line kicker is not enough at the ATF septum region. So the kick angle of the strip-line kicker is not enough to make the beam extraction orbit. We need a small septum. A new design uses slow bump magnets and a thin septum magnet to help making the extraction orbit. This design makes a bump orbit after beam damping, then each beam is extracted bunch-by-bunch by the strip-line kickers. New septum and a "slow" orbit bump would allow fast extraction using two 30 cm strip lines, driven by ±10 kV pulsers. Circulate Beam orbit Extracted Beam orbit Designed by T.Nato(KEK) 2018/9/21 Sendai-GDE 2008

Electric and magnetic field lines of the strip-line electrode Electrode distance:12mm Chamber diameter : 24mm Impedance :50ohm Max field at 10kV : 4.7MV/m 2018/9/21 Sendai-GDE 2008

Replacement from kicker magnet to strip-line kicker A 60cm long kicker magnet makes a 4.6mrad kick angle. Two strip-line kickers can make only1.3mrad kick angle. It is not enough for the kick angle to extract the beam. 2018/9/21 Sendai-GDE 2008

Beam extraction design with two strip-line kickers A design uses pulse bump magnets and an auxiliary septum magnet, which has thin separator, to help making the extraction orbit. This design makes a bump orbit after the beam damping, then the selected bunch is extracted bunch-by-bunch by the strip-line kicker. This is not optimum and starting point for the design consideration. 2018/9/21 Sendai-GDE 2008

Timing chart of 60(30) bunches beam extraction The bump orbit is gradually increased after all of the bunches have been damped. The strip-line kicker kicks out the beams at the timing of the flat-top of the bump orbit. The beams are extracted as one long bunch train, which is a 10micro-sec long with 154ns (or 308 ns) spacing. 2018/9/21 Sendai-GDE 2008

Detail of power supply control To avoid the beam loss at the injection timing by the bump orbit, the current control starts from 200ms after injection, which correspond to about three damping time. The current ramp needs 120ms to keep the beam orbit. The beam is extracted at the flat-top of the current. Beam Injection Bump orbit start Current control Magnet current 100ms/div 2018/9/21 Sendai-GDE 2008

Local bump by using present magnets and DC power supplies The aperture survey was carried out by using present magnets and DC power supplies. The required bump height is 5mm to separate the extraction beam and the circular beam. 2018/9/21 Sendai-GDE 2008

Beam extraction design with two strip-lines Bump orbit The bump orbit is optimized to eliminate the aperture limit at the septum area. 2018/9/21 Sendai-GDE 2008

Required magnet parameters Magnets(not yet designed) Steering magnets Bending angle: 9mrad(max) Effective length 100mm 0.4T(max) Septum magnet Bending angle: 14mrad 1000AT, 0.6m, 1 turn coil Power supplies Steering magnets - 50A(MAX), 10V(pulse) Septum magnet - 1000A, 1V(DC) 2018/9/21 Sendai-GDE 2008

Strip-line electrode from LNF and fast pulse power supply from Proposed Schedule 4 sets of 10kV fast pulsers order and test until end of 2007 Fabrication strip-line electrodes until end of March 2008 Fabrication bump magnets and pulse PS until end of 2007 Pulse bump magnet test until end of March 2008 Fabrication Septum magnet until end of June 2008 Installation strip-line electrodes and septum Summer 2008 Beam test Autumn 2008 Strip-line electrode from LNF and fast pulse power supply from LLNL and SLAC in 2008 or 2009 will be expected. 2018/9/21 Sendai-GDE 2008

Kicker Specifications The kickers will consist of strip-lines fed by ultra-fast, high-voltage pulsers. The integrated voltage required is determined by the acceptance specification: where V is the voltage between the strip-lines, L is the strip-line length, k is a geometry factor (~ 0.7) determined by the strip-line shape, Amax (~ 0.09 m for injected positrons) is the maximum betatron amplitude, E is the beam energy and g is the relativistic factor. Integrated voltage > 132 kV-m Rise and fall times < 3 ns Repetition rate 5.5 MHz Pulse length 970 µs Stability < 0.1% 2018/9/21 Sendai-GDE 2008

Kicker Systems There is a continuing R&D program to develop a pulser that meets the specifications for amplitude, rise and fall time, repetition rate, and stability. Several technologies look promising, including: fast ionization dynistor (FID); drift step recovery diode (DSRD); "inductive adder" (MOSFET). There is a commercial FID device available that comes close to meeting the specifications. A prototype with modified architecture, which could meet most of the ILC specifications, is in development; a version for bench testing is expected by the end of 2009. Modification of ATF extraction system to allow fast extraction of individual bunches from a train is planned for late 2008. 2018/9/21 Sendai-GDE 2008