CLIC Drive Beam Stabilisation

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
A. Bay Beijing October Accelerators We want to study submicroscopic structure of particles. Spatial resolution of a probe ~de Broglie wavelength.
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
UPC participation in the development of BPMs for the TBL of the CTF3 Yuri Kubyshin WORKSHOP ON THE FUTURE LINEAR COLLIDER Gandía, December 3, 2005.
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
Compensation of Transient Beam-Loading in CLIC Main Linac
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
A fast RF kicker for the MEIC electron cooler Andrew Kimber Amy Sy 31 st March 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Drive Beam Linac Stability Issues Avni AKSOY Ankara University.
Feedback On Nano-second Timescales: An IP Feedback System for the Future Linear Collider Requirement for a fast IP beam-based feedback system Simulation.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
R&D Programme for RT Phase Feedback Giulio Morpurgo.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
Higher-Order Modes and Beam-Loading Compensation in CLIC Main Linac Oleksiy Kononenko BE/RF, CERN CLIC RF Structure Development Meeting, March 14, 2012.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
Design of the ATF2 FB/FF Systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group Final EUROTeV Scientific Workshop Uppsala, 25-27th.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
I. Syratchev, CLIC Breakdown Workshop, CERN, 20 May 2008 Power Circulation in a CLIC Accelerating Structure I. Syratchev.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Oleksiy Kononenko CERN and JINR
Main and Drive Beam Dynamics Working Group Caterina Biscari, Daniel Schulte Attending people ~ 20 ± 5 Presentations ~ 18 (7 from CERN) CL IC 07.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
RF phase & amplitude stability of the CTF klystrons By Dubrovskiy Alexey 4 February 20091CLIC beam physics meeting And thanks to Frank Tecker and Daniel.
X-band Based FEL proposal
C. Biscari, D. Alesini, A. Ghigo, F. Marcellini, LNF-INFN, Frascati, Italy B. Jeanneret, CERN, Geneva, Switzerland CLIC DRIVE BEAM FREQUENCY MULTIPLICATION.
Status of the sub-harmonic bunching system for the CLIC DB injector front end Hamed Shaker School of Particles and Accelerators, Institute for Research.
RF Pulse Compression system for CTF3.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
Drive Beam Feedforward and Compression
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
Multi-stage pulse compressor
Phase Feed-Forward Piotr Skowroński (CERN)
Dither Luminosity feedback versus Fast IP feedback
In collaboration with P. N. Burrows, A. Latina and D. Schulte
Steering algorithm experience at CTF3
Wake field limitations in a low gradient main linac of CLIC
Status of the CLIC main beam injectors
CLIC Damping ring beam transfer systems
CLIC Rebaselining at 380 GeV and Staging Considerations
Have a chance to operate your own beam at CERN
F.Marcellini, D.Alesini, A.Ghigo
CLIC Drive Beam Klystron Modulators
Measurements, ideas, curiosities
Progress towards nanometre level beam stabilisation
Summary Shifts 8th Oct – 12th Oct
Feed forward orbit corrections for the CLIC RTML
CLIC damping rings working plan towards the CDR
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
RF Parameters Calculation for JLEIC Colliders (e Ring)
JLEIC Ion Integration Goals
Evaluation of 1GHz vs 2GHz RF frequency in the damping rings
Presentation transcript:

CLIC Drive Beam Stabilisation Author: Alexander Gerbershagen Supervisors: Prof Philip Burrows (University of Oxford) Dr Daniel Schulte (CERN) What is CLIC Drive Beam? The Compact Linear Collider (CLIC) is a proposed multi-TeV e+e- collider being developed at CERN, which is based on two-beam technology. One of the beams, so called Drive Beam, with low energy but high current, is used to deliver RF power for the accelerating structures of the high energy, low current beam, called Main Beam. This scheme has been chosen, since the CLIC main beam frequency (~12 GHz) is too high for any conventional RF source. Fig. 1: Layout of the CLIC collider at 3 TeV How does Drive Beam recombination scheme work? The Drive Beam is produced in 240ns long trains with 180° phase shifted bunches at 0.5 GHz frequency. Acceleration power is provided by standard 1GHz RF source, so that all bunches are accelerated equally (Fig. 4). The frequency is then increased from 0.5 GHz to 12 GHz by recombining bunches in the delay loop And the combiner rings. The trains overlap during this recombination process and the errors from different trains come together in one train (Fig. 5). Why do we need to stabilize it? First, bunches pass the recombination scheme of the Drive Beam. Then the RF power is extracted from the Drive Beam in so called Power Extraction and Transfer Structures (PETS) and the RF waves are led from there to the accelerating structures of the Main Beam. The stability of the Drive Beam is a critical issue, since its jitters and instabilities would lead to unstable power supply to the main beam. Some tolerances (e.g. phase, gradient and energy error tolerance) are very strict. The filling time of the RF structures is ~ 60ns, hence we integrate the errors over intervals of same order of magnitude (10ns) to receive following distribution of error as function of frequency (Fig. 3). Fig. 2: Two beams scheme of CLIC Fig. 4: Layout of the CLIC RF complex Fig. 3: Charge error as a function of frequency Fig. 5: Train errors overlap How can we stabilise it? In order to avoid the main beam RF jitter one has to compensate the errors of the beam before the PETS e.g. with help of a feedback system. Dependent on jitter frequency, the feedback system can reduce or increase the error (Fig. 6). To optimise the total impact of feedback, we have to integrate error over frequencies and minimise the value as function of feedback latency and gain (Fig. 7). We realize that if t(latency) + t(gain) ≈ 240ns (which corresponds to the train length) the feedback is optimal. Conclusion: Cool, we can even reduce the white noise errors with a feedback system! This is in general not possible, but it becomes possible in this case due to recombination scheme. What is a feedback system? Ideal feedback system: 1. Measures error value 2. Compensates error on the next bunch For CLIC the bunch spacing (0.08 ns) is much smaller then the latency time of the feedback and gain time of the correction kicker (~ 10 ns). Hence, the correction will look like on Fig. 9. But if the jitter frequency is anti-resonant to feedback latency, the feedback system corrects the measured value too slowly, and only increases the error (Fig. 10). The standard feedback system used in our simulations, is called proportional-integral- derivative controller (PID controller). Fig. 10: Resonant (top) and anti-resonant (bottom) feedback Fig. 6: Charge error as a function of frequency (without and with feedback) Fig. 9: Example of feedback correction with long latency and gain time and small bunch spacing What will we do in the future? Include more realistic effects in the simulation Perform the simulations for possible future feedforward systems Use the results as input for the main beam studies Make predictions and test them at CLIC Test Facility (CTF3) Simulate usage of Feedback On Nanosecond Timescale (FONT) system Fig. 7: Current error integrated over frequencies as a function of latency and gain length Applying the feedback before the recombination and integrating over 10ns thereafter puts the error at the blue bunch and its correction on the red bunch in one interval, hence reducing the total error (Fig. 8). Special thanks for providing support and material: Prof Philip Burrows Dr Daniel Schulte Dr Franz Tecker Dr Guido Sterbini Dr Oleksiy Kononenko Fig. 8: Scheme of bunch recombination and integration over 10ns intervals For more information see: http://clic-study.web.cern.ch/clic-study/ http://www-pnp.physics.ox.ac.uk/~font/index.html