DOE/SC Status Review of 12 GeV SHMS HB Magnet: Update since Oct 2015

Slides:



Advertisements
Similar presentations
Chapter 31B - Transient Currents and Inductance
Advertisements

Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Hall C SHMS Fringe Field Analysis Michael Moore Hall C Winter Meeting
Cryogenic Experts Meeting (19 ~ ) Heat transfer in SIS 300 dipole MT/FAIR – Cryogenics Y. Xiang, M. Kauschke.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
Quadrupole Magnetic Design for an Electron Ion Collider Paul Brindza May 19, 2008.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
1 MICE Mtg Oct 2002 Elwyn Baynham RAL Focussing Absorber Magnet Elwyn Baynham ; Tom Bradshaw Iouri Ivaniouchenkov ; Jim Rochford Applied Science Division.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
Twin Solenoid Twin Solenoid - conceptual design for FCC-hh detector magnet - Matthias GT Mentink Alexey Dudarev Helder Pais Da Silva Leonardo Erik Gerritse.
I l Amperes Law I is the total current linking the magnetic flux. It may be N wires carrying I/N amperes. l.
Status of CEPC Detector magnet
Magnet designs for Super-FRS and CR
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
CEA DSM Irfu - F. KIRCHER - [Seoul Workshop, Feb 16-18, 2009] 1 ILD detector magnet: LoI version F. Kircher, O. Delferrière CEA Saclay, DSM/Irfu/SACM.
Orbit Correctors in D2 and Q4 Update J. Rysti and E. Todesco 1 4/11/2014.
Design of DC septum magnets based on measurements and 3D calculation of an R&D septum magnet for Rapid Cycle Synchrotron of J-PARC Masao Watanabe, Accelerator.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
SHMS Spectrometer Update Hall C 2008 Users Meeting Paul Brindza January 18, 2008.
The Cosine Two Theta Quadrupole Magnets for the Jefferson Lab Super High Momentum Spectrometer (SHMS). P.B. Brindza, S.R. Lassiter M. J. Fowler Abstract—
Cold test of SIS-300 dipole model Sergey Kozub Institute for High Energy Physics (IHEP), Protvino, Moscow region, Russia.
S. Lassiter, P. Brindza, M. Fowler, E. Sun - Jefferson Lab G. Markham - NovaTech, B. Wands - Fermi Lab Abstract—Jefferson Laboratory is developing a set.
Reducing the Iron in the Endcap Yoke of CLIC_SiD Benoit Curé, Konrad Elsener, Hubert Gerwig, CERN CERN, June 2014 Linear Collider Detector Magnet Meeting.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
Superferric quadrupoles and multipoles at the NSCL Al Zeller NSCL/MSU.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
SAMURAI magnet Hiromi SATO SAMURAI Team, RIKEN Requirements Geometry Magnetic field Superconducting coil and cooling system Present status of construction.
HTS and LTS Magnet Design and Prototyping for RAON
F LESEIGNEUR / G OLIVIER LUND January 9th, ESS HIGH BETA CRYOMODULE ESS CRYOMODULE STATUS MEETING HIGH BETA CRYOMODULE LUND JANUARY 9TH, 2013 Unité.
Design ideas for a cos(2q) magnet
Status of the PANDA Solenoid Magnet Production in BINP
Update on PANDA solenoid design
CBM magnet overview of the BINP work
Some Design Considerations and R &D of CEPCB Dipole Magnet
Final doublet: future activity plan
Iron-free high current pulsed air-core coil quadrupoles
Quench estimations of the CBM magnet
TQS Structure Design and Modeling
Status of the CLIC DR wiggler design and production at BINP
The design schemes of the low field dipole magnets
On the Ground Muon Ionisation Cooling Experiment ( MICE ) – pre-cursor to a neutrino factory.
AEGIS Magnet System.
JLAB MEETING FDR – April 23-24th 2013
FRESCA2 Update on the dipole design and new calculations
CHEN, Fusan KANG, Wen November 5, 2017
Yingshun Zhu Accelerator Center, Magnet Group
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
SHMS Q2 with Beam Line Shield Pipe
BESIII Collaboration Meeting, June 5~6, 2002, Zian Zhu
MQXF coil cross-section status
MQY as Q5 in the HL LHC era Glyn Kirby MQY 001 bat 927.
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Updated concept of the CBM dipole magnet
Cryogenics – The Basics
The superconducting solenoids for the Super Charm-Tau Factory detector
Hall C SHMS & Configuration Status
Fusan Chen, Wen Kang, Mei Yang*
Chapter 31B - Transient Currents and Inductance
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
as a prototype for Super c-tau factory
Hall C SHMS & Configuration Status
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Quench calculations of the CBM magnet
CEPC Final Focus Superconducting Quadrupole and Anti-solenoid Magnets
Budker Institute of Nuclear Physics,
IR Beam Transport Status
Cross-section of the 150 mm aperture case
Presentation transcript:

DOE/SC Status Review of 12 GeV SHMS HB Magnet: Update since Oct 2015 Eric Sun Paul Brindza Steve Lassiter Mike Fowler October 25-26, 2016

Outline Overview Key Parameters Three-stage Test Plan Test Results of Stage 3 Magnetic Field Mapping Conclusion

Cryogenic control reservoir SHMS Q1 beam cutout Front opening HB beam cutout Vacuum vessel Warm iron Suspension link

Key Parameters of HB Parameter Unit Design Value 11 GeV current A 3900 Test current 4000 Pole Gap (warm) mm 350 Number of turns per pole turn 90 Stored energy at 3900 A MJ 0.19 Field at 3900 A (11 GeV) T 2.5 Max field in coil at 3900 A 3.2 Self-inductance at 3900 A H 0.025 Current density at 3900 A A/mm2 22.5 Overall physical length of magnet m 1.16 Magnet weight ton 6.8 Length of SSC cable in each coil 234.4 Total helium volume in magnet and CCR m3 0.118 Insulation thickness between turns 0.28 Cross section of coil mm×mm 13.3×130 Cross-section of SSC cable 11.68×1.156 Cu:NbTi ratio of SSC cable   1.8 Dump resistor (final)  0.024 Effective field length 770 Integral field strength at 3900 A Tm 1.97 Set pressure of relief valves (He and N2) atm (gauge) 4 Set pressure of rupture discs (He and N2) 5

Eddy Current on Thermal Shield T6 is a temperature sensor, which can be used to correlate simulations and measurements.

Three-Stage Test Plan First Stage – low current tests (up to ~400 A) Low dump resistor and warm (218 K) thermal shield lead to less eddy current and thus less displacement and stress due to Lorentz force. Second Stage – medium current tests (up to 2000 A) Projected displacement and stress were acceptable at 4000 A if a 0.24 ohm dump resistor and a warm (218 K) thermal shield were used. Third Stage – high current tests (up to 4000 A) Successful ramped up to 4000 A and fast discharged from 4000 A. Behaved normally after multiple fast discharges from high currents. Measured and simulated temperatures matched well.

Test Results of Third Stage Measured (based on T6) vs simulated average temperature rises. The dashed line, the simulated temperature at T6; the solid line, the measured. 218 K thermal shield and 0.024 ohm dump resistor.

Training Curve HB magnet was able to reach 3900 A or 4000 A for the last six ramp-ups. No scope was wired for Event 42. But it was believed Event 42 was caused by PSU.

Magnetic Field Mapping - Equipment LakeShore XHGT-9060 hall probe was used. Hall probe was manually moved.

Magnetic Field Mapping – Results (3900 A) Measured (blocks) and simulated (solid red line) magnetic field along the central tube. The measured field at Location 27 was 2.53 T; the Tosca-simulated field, 2.54 T.

Conclusion HB Magnet was successfully ramped up to 4000 A and safely fast discharged from 4000 A. HB magnet was well trained now. Measured and simulated magnetic fields match well. HB magnet is done!