Current SOC-Ground System Integration Schedule (Jan )

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
Advertisements

JSOC Overview - 1HMI/AIA Team Meeting – Feb 2006 JSOC Summary- Phil Scherrer Pipeline Processing - Rasmus Larsen Data Access - Rick Bogart Data Visualization.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
( ELR) - 1 STEREO - Solar Terrestrial Relations Observatory Mission STEREO SWG STEREO OBSERVATORY Status Edward Reynolds APL STEREO Project Manager.
1/15/02Bowman/Harch1 CONTOUR Science Ops Update Ann Harch Cornell University (607) Alice Bowman Applied Physics.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
The road to the first E2E tests
Report to RMS July 14, 2004.
Recommendation of Texas Test Plan Team to RMS
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
Jan 2016 Solar Lunar Data.
JSOC Status at SDO PSR-1 January 21-22, 2009 GSFC
IT Strategy Roadmap Template
CATECHISM CALENDAR 2017 TERM 1 – 21 JAN – 11 MAR
Recommendation of Texas Test Plan Team to RMS
GLAST Large Area Telescope:
Payroll Calendar Fiscal Year
Baltimore.
Analyzing patterns in the phenomena
SDO Ground System Test Readiness Review

Average Monthly Temperature and Rainfall
GSRT Critical Design Peer Review
RC Ohio Valley Region Strategic and Annual Planning Process January – September 2016 Notes Fr John says greeting and reflects on 75 anniversary and then.
80-Hour SHARP Certification Course Schedule


Jim Aloise System Programmer
2017 Jan Sun Mon Tue Wed Thu Fri Sat
Launch and On-orbit Checkout
SDO Integration and Test (I&T) Subsystem Mission PDR
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Science Data Capture Jim Aloise Nov , 2004 System Programmer
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule

Step 3 Step 2 Step 1 Put your text here Put your text here
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Sun Mon Tue Wed Thu Fri Sat

GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
Electricity Cost and Use – FY 2016 and FY 2017

LAT Operations Scenario Subsystem Meetings
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

CATECHISM CALENDAR 2017 TERM 1 – 21 JAN – 11 MAR
Instrument Commissioning SDO SOWG - January 18-19, 2007 Purpose/Goal:

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Port Back Data Collection & Transition
IT Managed Services Transition Weekly Activity Report: June 11th, 2019
IT Managed Services Transition Weekly Activity Report: May 28th, 2019
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Budget Planning Calendar
Port Back Data Collection & Transition
Port Back Data Collection & Transition
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Port Back Data Collection & Transition
Presentation transcript:

Current SOC-Ground System Integration Schedule (Jan 18-19 2007) 2006 2007 2008 D J F M A M J J A S O N D J F M A M J J A S O Ground System Reviews Mission Operation review September (TBC) SOC Telemetry and Command (T&C) EVE/MOC Integration Jun 1 2006-Jan 1 2007 HMI/MOC Integration Feb 1 2007 - Mar 22 2007 AIA/MOC Integration Mar 2 2007 - Apr 4 2007 All SOCs/MOC Integration. Apr 4 2007 - Apr 18 2007 SOC Science Data Processing (SDP) EVE/DDS Preliminary Feb 8 2007 - Mar 22 2007 EVE/DDS Integration Apr - May 2007 Depends on DDS 60-day test HMI/DDS Integration Jul 2 2007 - Aug 10 2007 AIA/DDS Integration Aug 1 2007 - Sep 4 2007 All SOCs/MOC Integ. Sep 6 2007 - Sep 14 2007 Communications lines EVE/MOC T1 (1) Done: June 30 2006 HMI-AIA/MOC T1 Jan 2007 Pending EVE/DDS T3 April 2007 May be revised HMI/DDS OC3 July 9 2007 Request Jan 25 AIA/DDS OC3 Aug 7 2007 Request Feb 26 GSRT#4b 72-day end-to-end performance test Oct/Dec 2007 1

Mission Ops Test Milestones with Observatory 2007 2008 Nov Jan Mar May Jul Sept Nov Jan Mar May July Sept Observatory Integration and Testing PSR Launch Aug 08 Mission Operations Reviews MOR FORR 1st SDO H/K Data Flow with MOC (S/C only) (AIA, EVE, HMI) FOT Flight Procedure Testing with Spacecraft (TV/TB) High-rate OC3 Data Circuit S/C I&T to WSC MOC Contingency Procedure Testing with Instruments Mission Simulations (ETE, and Day in Life) Mission Simulations During TV/TB Testing Mission Simulations Contingency Operations Mission Simulations L&EO Operations Testing with SDO at KSC Launch Rehearsals Last Revision: January 2007 1

Test Opportunities w/ Observatory (1 of 3) Test Opportunity Date ~ Test Hours Comments First Spacecraft Housekeeping Dataflow with MOC March 2007 24 First live telemetry data transmitted to MOC from the spacecraft. Testing will include No-Op commanding to verify command coordination between MOC and I&T T&C systems Performed after C&DH electrical integration is complete Once interface is established, telemetry can be flowed to the MOC on an as needed basis (coordinated with S/C TCs) Telemetry can also be sent to SOCs as needed (to be negotiated between Instrument Teams and FOT) MOC Flight Procedure Testing with Spacecraft June 2007 48 FOT requires time with spacecraft to test contingency procedures that cannot be tested with the FlatSat simulator. (For example cross-strapping procedures) Time may be spread out over several days, executed during off-hours First EVE Housekeeping Dataflow to EVE SOC Aug 2007 First live EVE instrument housekeeping telemetry data transmitted through the MOC to the EVE SOC Performed after EVE instrument integration is complete EVE housekeeping telemetry can be sent to SOC (via MOC) on an as needed basis (to be negotiated between EVE Team and FOT) First HMI Housekeeping Dataflow to JSOC First live HMI instrument housekeeping telemetry data transmitted through the MOC to the JSOC Performed after HMI instrument integration is complete HMI housekeeping telemetry can be sent to JSOC (via MOC) on an as needed basis (to be negotiated between HMI Team and FOT) First AIA Housekeeping Dataflow to JSOC First live AIA instrument housekeeping telemetry data transmitted through the MOC to the JSOC (performed after AIA instrument integration is complete) AIA housekeeping telemetry can be sent to JSOC (via MOC) on an as needed basis (to be negotiated between AIA Team and FOT) 1

Test Opportunities w/ Observatory (2 of 3) Test Opportunity Date ~ Test Hours Comments MOC Flight Procedure Testing with Instruments Jan 2008 48 This time is reserved for the FOT and SOCs to jointly test and validate Instrument contingency procedures which reside in the MOC (for example instrument safing or shutdown) Time may be spread out over several days and executed during off-hours MOC/SOC Ka-band End-to-End (ETE) Dataflow Test Feb 2008 24 This simulation will focus on High-rate science data from the Instruments over a temporary OC3 circuit from GSFC to WSC through the operational DDS and to the SOC SDP facilities Project plans to install GSFC-to-WSC OC3 circuit for approx 90 days to support this testing (currently planned for Jan through March 2008) Day in The Life Mission Simulation Simulate typical SDO day in the life (Full sun ops) This simulation will include High-rate science data from the Instruments over the temporary OC3 circuit from GSFC to WSC Mission Planning Meeting (discuss planned MOC and SOC activities) Will include SOC-MOC command link coordination SOC uplink of routine command loads FOT uplink of ATS and EPV loads, automated SSR retransmissions, etc. Mission Simulations During TV/TB Feb-Apr 2008 84 Simulate typical SDO day in the life (Full-sun and Eclipse ops) These simulations will focus on the planning and coordination between the MOC and SOCs specific to Eclipse Operations. Simulations will likely be executed piecemeal as several separate opportunities scheduled around thermal transition periods OC3 circuit should still be in place allowing flow of High-rate science telemetry to be included in simulations 1

Test Opportunities w/ Observatory (3 of 3) Test Opportunity Date ~ Test Hours Comments Mission Simulation Contingency Operations April 2008 48 Contingency Tests and Simulations: This time is set aside for simulating/testing the MOC’s ability to handle various contingency scenarios that cannot be simulated with the FlatSat Examples include: C&DH, ACE, and GCE Cross-strap configurations, HGA Handovers, Loss of Comm recovery, and Ka-band and S-band RF configurations, Instrument Contingencies (TBD) Mission Simulations L&EO Simulations Apr-May 2008 24 L&EO Simulations: Time is set aside for the MOC and SOCs to test and simulate planned IOC activities which cannot be simulated with the FlatSat Examples include Instrument Turn On and Initialization activities using IGSE located in the MOC SOS. Launch Rehearsals (Three total) Jul-Aug 2008 24 hours Rehearse the timeframe from Launch minus 8-hours to Launch All mission support personnel participate in these rehearsals to assure that all channels of communication have been well thought out and exercised 1