Integrated Project Management IPM (Without IPPD) Intermediate Concepts of CMMI Project meets the organization Author: Kiril Karaatanasov

Slides:



Advertisements
Similar presentations
Process and Product Quality Assurance (PPQA)
Advertisements

SPIN-BG Seminar 1.Overview of CMMI Model changes 3.SCAMPI method changes 4.Training changes 5.CMMI Architecture Author: Kiril Karaatanasov
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
Copyright 2005 CMMI and ITIL Alison Adams & Kieran Doyle.
CMMI Overview Dr. Korson Software Engineering. 2 Immature organizations can be successful on occasion, but ultimately run into difficulties because –Success.
CMMI PMC Group Members Inam ul Haq Sajjad Raza Nabeel Azam
Requirements Analysis INCOSE Systems Engineering Boot Camp
Measurement & Analysis Adeel Munir Butt Muhammad Adnan Nasir Muhammad Shoaib Khan.
200209–CSSA0001 – 16/27/ :25 PM CSSA Cepeda Systems & Software Analysis, Inc. GENERIC.
1 R&D SDM 1 Software Project Management Capability Maturity Model 2009 Theo Schouten.
By Saurabh Sardesai October 2014.
Chapter 3 The Structure of the CMM
Adaptive Processes Comparing CMMI 1.2 vs. CMMI 1.1 LN Mishra Adaptive Processes Consulting.
Process Area : Requirement Management (REQM) By: Amna Rehmat Maria Habib Sana Ahmed.
Capability Maturity Method (CMM)
CMMI Overview Quality Frameworks.
ESC/EN Engineering Process Compliance Procedures August 2002.
Capability Maturity Model
Understanding (and Untangling) Verification and Validation Requirements ISO 9001 vs. CMMI-Dev 1.2.
Capability Maturity Model Integrated
Process: A Generic View n A software process  is a roadmap to building high quality software products.  provides a framework for managing activities.
CMMI Course Summary CMMI course Module 9..
8. CMMI Standards and Certifications
Integrated Capability Maturity Model (CMMI)
Capability Maturity Model® Integration (CMMISM) Personal Prof. Dr. ir J. De Man CMMI (personal)
N By: Md Rezaul Huda Reza n
CMMi What is CMMi? Basic terms Levels Common Features Assessment process List of KPAs for each level.
ARINC PROPRIETARY Measurement and Analysis JD Rosser SC-SPIN January 2008.
1 / x Project Planning CMMI Project Planning Jean-Luc Deprez Robin Leblon.
Software Engineering Lecture # 17
Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.
10/16/2015Bahill1 Organizational Innovation and Deployment Causal Analysis and Resolution 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed Continuous.
Software process improvement Framework for SPI SPI support groups, maturity and immaturity models Assessment and gap analysis Education and training Selection.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Managing CMMI® as a Project
Georgia Institute of Technology CS 4320 Fall 2003.
Enabling Project Communication, Collaboration & Workflow (CCW)
Software Engineering - I
1 / x CMMI Measurement & Analysis Pieter Cailliau Stijn De Vos Measurement & Analysis.
Process: A Generic View
1 Agenda for measurement r1. CMMI r2. Other thrusts.
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
1 / 25 IPM CMMI Integrated Project Management (IPM) Dieter De Paepe & Sarah Bourgeois.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
Guidelines for Process
Space and Airborne Systems Prepared For 3rd Annual CMMI Technology Conference Presented In Denver, CO Tom Cowles November 19, 2003 Peer Reviews For CMMI.
 CMMI  REQUIREMENT DEVELOPMENT  SPECIFIC AND GENERIC GOALS  SG1: Develop CUSTOMER Requirement  SG2: Develop Product Requirement  SG3: Analyze.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
COMPGZ07 Project Management CMMI Project Planning Lecture 5b Graham Collins, UCL.
CMMI1 Capability Maturity Model Integration Eyal Ben-Ari 8/2006.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
CMMI Overview Quality Frameworks. Slide 2 of 146 Outline Introduction High level overview of CMMI Questions and comments.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
© 2004 Tangram Hi-Tech Solutions Project Management According to the CMMI1 Project Management according to the Capability Maturity Model (CMMI)
Implementing Program Management Standards at Duke Energy.
Capability Maturity Model. What is CMM? n CMM: Capability Maturity Model n Developed by the Software Engineering Institute of the Carnegie Mellon University.
CMMI for Services, Version 1.3 Speaker: Business Excellence Date:
Software Configuration Management
TechStambha PMP Certification Training
Level - 3 Process Areas (CMMI-DEV)
CMMI – Staged Representation
Engineering Processes
Capability Maturity Model
Engineering Processes
Project Management Group
Capability Maturity Model
Requirements Development in CMMI
Presentation transcript:

Integrated Project Management IPM (Without IPPD) Intermediate Concepts of CMMI Project meets the organization Author: Kiril Karaatanasov Date:

Importance of Integrated Project Management (1) Integrated Project Management creates environment for: –Effective use of organizational process knowledge –contribution to the organizational process knowledge.

Importance of Integrated Project Management (2) With IPM: Collaboration, dependency and coordination issues are recorded and controlled. While SG 1 enables sharing of knowledge SG 2 enables coordinated work.

Benefits of IPM Knowledge is transferred from project level to the organization Improved planning through better understanding of process performance Lower cost of process planning in projects as reuse is promoted Improved coordination among people involved in a project Commitment to the organization is improved as communication & sharing between teams is facilitated Institutionalizing key management practices –Reuse of knowledge –Integration of plans –Tracking dependencies & collaboration issues –Post mortem analysis

Case Study (1) – Service Organization

Case Study (2) - Problem

Case Study (3) - Solution

IPM depends on Project Planning for establishing and maintaining Project Plan. Project Monitoring and Control for management and control of the project GP 2.7 & Project Planning SP for identification of stakeholders and their roles Organizational Process Definition & Organizational Process Focus for organizational process definitions (assets, knowledge), organizational improvement needs, objectives and plans

Who depends upon IPM Organizational Process Focus uses contributed from projects measurements, process definitions, analyses and suggestions Project Planning to create the projects defined process Quantitative Project Management for the projects defined process that becomes subject to quantitative and statistical control. This is rather an interdependency as QPM helps in selecting organizational processes based on performance and sub processes for statistical control GG 3 (All processes areas at capability or maturity level 3) for establishing defined processes

Specific Goals & Practices in IPM SG 1 Use the Projects Defined Process –SP 1.1-1Establish the Projects Defined Process –SP 1.2-1Use Organizational Process Assets for Planning Project Activities –SP 1.3-1Integrate Plans –SP 1.4-1Manage the Project Using the Integrated Plans –SP 1.5-1Contribute to the Organizational Process Assets SG 2 Coordinate and Collaborate with Relevant Stakeholders –SP 2.1-1Manage Stakeholder Involvement –SP 2.2-1Manage Dependencies –SP 2.3-1Resolve Coordination Issues

Critical SPs in IPM (1) Tailoring organization processes to create projects defined processes is critical for institutionalization of Maturity Level 3 or Capability Level 3 in the organization. This is supported by the first three specific practices of SG 1. SP defines the process steps for achieving this. –SP Establish the Projects Defined Process 1.Select a life-cycle model from those available from the organizational process assets. 2.Select the standard processes from the organization's set of standard processes that best fit the needs of the project. 3.Tailor the organization's set of standard processes and other organizational process assets according to the tailoring guidelines to produce the projects defined process. 4.Use other artifacts from the organization's process asset library as appropriate. 5.Document the project's defined process. 6.Conduct peer reviews of the project's defined process. 7.Revise the project's defined process as necessary.

Critical SPs in IPM (2) Sharing results with the organization is another critical component in establishing organization wide sharing of knowledge. It is facilitated by SP –SP Contribute to the Organizational Process Assets 1.Propose improvements to the organizational process assets. 2.Store process and product measures in the organizations measurement repository. 3.Submit documentation for possible inclusion in the organization's process asset library. 4.Document lessons learned from the project for inclusion in the organization's process asset library.

Critical SPs in IPM (3) SP enables effective planned coordination among different stakeholders to achieve project success. –SP Manage Dependencies 1.Conduct reviews with relevant stakeholders. 2.Identify each critical dependency. 3.Establish need dates and plan dates for each critical dependency based on the project schedule. 4.Review and get agreement on the commitments to address each critical dependency with the people responsible for providing the work product and the people receiving the work product. 5.Document the critical dependencies and commitments.

Implementation Ideas – Process Reuse & Tailoring For service organization I found a good ideas to be: –Maintain reusable per customer process aids – templates, standards, procedures Customer specifics needs to be highest priority. In outsourcing business most customers are software organizations and have own standards and terminology –Create organization wide shared lifecycle models (time & material, fixed price) This establishes common features for all projects and basis for comparison and analysis between projects –Aggregate experience from different projects into guidelines for specific tasks reused throughout the organization (estimation, code reviews, configuration management) This allows best practice in the organization to be reused and process improvements to be proactively suggested leading to increased value of service

Implementation Ideas – SP 1.5 Contribute to the Organizational Process Assets Start with submitting plans and project summary (project portfolio) Periodically (On every milestone, every month) submit: –Process measures of actual budget and effort, productivity –Projects Defined Process Artifacts – procedures, standards, checklists etc. –Other reusable data – 3rd party component selections At project completion conduct post mortem analysis and submit lessons learned This combines SP 1.5 with GP 3.2 Collect Improvement Information and MA SP 2.1 Collect Measurement Data

Implementation Ideas – SG 2 Coordinate & Collaborate with Relevant Stakeholders Perform milestone reviews with customer Implement periodic steering and CCB meetings Always document verbal communication in minutes of meeting documents Plan dependencies in project schedule and set corresponding risk and mitigation plan to each Record, verify and track commitments Keep live list of open issues (bug tracking, excel) Provide clear and concise reports Transparency is of key importance to trust between client and supplier. Trust is important in software development.

Generic Practices and IPM IPM SG 1 is subsumed by: –GP 3.1 Establish a Defined Process and –GP 3.2 Collect Improvement Information IPM SG 2 extends the scope of –GP 2.7 Identify and Involve Relevant Stakeholders

Links and materials "Software Project Management in Practice" By Pankaj Jalote, Publisher: Addison Wesley, Pub Date : January 31, 2002, ISBN : Tailoring overview presentationhttp://sepo.spawar.navy.mil/Tailoring_Guidance.html