PMP Progress Since GRPE 55 GRPE 54 agreed a Roadmap of work to address concerns with ECE/TRANS/WP.29/GRPE/2007/8 ( adding particle number measurement to.

Slides:



Advertisements
Similar presentations
Requirements Engineering Processes – 2
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
© 2007, TSI Incorporated Future Diesel Emission Limits: Particle Measurement Programme (PMP) Update 2008 Channel Partner Sales Meeting.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
0 - 0.
Addition Facts
© 2006 TDA Development Draft and subject to amendments from consultation Performance Management Challenge for Schools PM workshops 23 October 2006.
CCMAS Past – present -future Prof. Dr. Ambrus Árpád.
EPA Methods 3A, 6C, 7E, 10 & 20 Corrections to May 15, 2006 Final Rule That Updated the Methods That Updated the Methods Foston Curtis US EPA.
Evaluation Orientation Meeting Teacher Evaluation System
Harmonization of Part 60 and Part 75 CEM Requirements Robert Vollaro
Harmonization of Parts 60 and 75
Marion Wichmann-Fiebig II 5 Abteilungsleiterin „Luft“ 1 Review of the Gothenburg Protocol Link to potential PM control under CLRTAP: – Specifies control.
23 nm PN Key Messages (draft) Draft discussion document for PMP meeting 08 Jan 2014 PMP
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Non Road Mobile Machinery Engines Global Technical Regulation Complete Informal Document NRMM WG Informal document No. GRPE (57th.
Non Road Mobile Machinery Engines Global Technical Regulation for Approval by GRPE Draft NRMM gtr 2009/16 Final Report 2009/17 Informal document No. GRPE
6 th WLTP IWG Meeting Agenda Item 12 General issues: Drafting issues - Report by S. Dubuc WLTP rev1e GTR Status.
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 24th WHDC, Geneva, 03 June 2008 Informal document No. GRPE (56th.
PMP: SUB 23 NM MEASUREMENT RECOMMENDATIONS B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 3 April 2014.
Particle Measurement Programme Informal Working Group (PMP) Progress Report and Next Steps Giorgio Martini Sustainable Transport Unit.
Institute for Energy and Transport B. Giechaskiel, G. Martini
Revisions To Heavy Duty Validation Report General Numerous clarifications to text as requested at December meeting Partial flow systems referred to consistently.
Particle Measurement Programme (PMP) Progress update
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 4 th DTP Meeting Geneva 12 th January 2011 Chris Parkin.
PMPN Report to WLTP DTP 16 Jan 2013 Prepared by Caro Hosier Post 14 and 15th WLTP PMPN Meetings audio / web conferences.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.
PMP Progress Report Activities since GRPE 58 Heavy Duty Validation testing Exercise completed in October Draft report and draft proposal to insert PN measurement.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 5 th DTP Meeting Dubendorf 12 th – 14 th April 2011 Chris Parkin.
1 GRPE Informal Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 64 Geneva, 07 June 2012 Informal document No. GRPE (64th GRPE, June.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 69 Geneva, 05 June 2014 Informal document No. GRPE (69th GRPE,
Agenda item IV 5 th GFV meeting  2-days meeting on the 4 and 5 March 2009 in Brussels, (European Commission offices) 6 th GFV meeting  26 May 2009 in.
PMP: SUB 23 NM REVIEW B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 8 January 2014 GRPE-PMP
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 22nd WHDC, Geneva, 16 January 2008 GRPE/WHDC/FE08 Informal document No.
GRPE 71 ST SESSION PMP INFORMAL GROUP PROGRESS REPORT TO GRPE 8 Jan 2015 Informal document GRPE st GRPE, 8-12 June 2015,
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 57th GRPE, Geneva, 15 January 2009 Informal document No. GRPE (57th.
ACEA PM-3 programme Caroline Hosier, Pilot, ACEA Task-Force Particulates (TF-PM) Ford Motor Company Draft presentation to GRPE Informal document No. GRPE-52-9.
37 TH PMP MEETING Institute for Energy and Transport Joint Research Centre B. Giechaskiel, G. Martini 7 Oct 2015.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 65 Geneva, 17 January 2013 Informal document No. GRPE (65th GRPE,
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Exhaust emissions.
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 58th GRPE, Geneva, 11 June 2009 Informal document No. GRPE (58th.
© 2009, TSI Incorporated PMP PNC Calibration Recent Experiences Hans-Georg Horn TSI GmbH, Particle Instruments PMP Meeting, London, 30 March 2009.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 72th UNECE GRPE session PMP IWG Progress Report.
RDE PN-PEMS programme Progress Update F. Riccobono, B. Giechaskiel, P. Bonnel STU, IET, JRC, European Commission.
Establishing by the laboratory of the functional requirements for uncertainty of measurements of each examination procedure Ioannis Sitaras.
VIAQ (Vehicle Interior Air Quality) Informal Working Group
VIAQ (Vehicle Interior Air Quality) Informal Working Group
PMP IWG Progress Report
Progress report by the Chair of the informal group on REC
PMP Heavy Duty Validation Exercise
Particle Measurement Programme - Report
Institute for Energy and Transport B. Giechaskiel, G. Martini
Preliminary results of the OEMs HDV PN-PEMS validation study
76th UNECE GRPE session PMP IWG Progress Report
Transmitted by the IWVTA Informal Group
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
PN Levels in UN Regulation N°83.07
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
Inter-Laboratory Comparison Exercise CPC CALIBRATION
PMP – PN sub 23nm Route to transfer from ‘in case of urgent need’ into planned delivery into regulations PMP-48 Presentation from Technical Secretary.
Francesco Riccobono, Barouch Giechaskiel, Pierre Bonnel
PN-PEMS Progress update
Informal document GRVA st GRVA, September 2018
PN Counting from Raw Exhaust via Fixed Dilution and PMP Round Robin Project JRC and ACEA.
Adolfo Perujo (IWG chairman)
PNC and VPR Validation PMP Meeting 30th March 2009
UNECE IWG on EPPR for L-category vehicles
Presentation transcript:

PMP Progress Since GRPE 55 GRPE 54 agreed a Roadmap of work to address concerns with ECE/TRANS/WP.29/GRPE/2007/8 ( adding particle number measurement to Regulation 83) to allow a revised proposal to be adopted in January Roadmap actions were; i) to compile additional existing PN results, ii) to improve calibration procedures, iii) to analyse accumulation of errors/system tolerances and iv) to demonstrate calibration procedures. Compilation of Existing Particle Number Test Data from PMP compliant equipment used outside of the PMP ILCE – Data was received from AECC, CARB, JAMA, Sweden, Concawe, UK, Toyota and Volkswagen – PMP compliant measurement systems used were the Horiba SPCS and Matter MD19+TSI PNC. Results were submitted on other measurement systems but no data was available to demonstrate that these systems met PMP solid particle penetration and volatile particle removal efficiency requirements. GRPE 54 agreed a Roadmap of work to address concerns with ECE/TRANS/WP.29/GRPE/2007/8 ( adding particle number measurement to Regulation 83) to allow a revised proposal to be adopted in January Roadmap actions were; i) to compile additional existing PN results, ii) to improve calibration procedures, iii) to analyse accumulation of errors/system tolerances and iv) to demonstrate calibration procedures. Compilation of Existing Particle Number Test Data from PMP compliant equipment used outside of the PMP ILCE – Data was received from AECC, CARB, JAMA, Sweden, Concawe, UK, Toyota and Volkswagen – PMP compliant measurement systems used were the Horiba SPCS and Matter MD19+TSI PNC. Results were submitted on other measurement systems but no data was available to demonstrate that these systems met PMP solid particle penetration and volatile particle removal efficiency requirements. Informal document No. GRPE (55th GRPE, January 2008, agenda item 6(a))

Consolidation of Particle Number Data

CARB Au Vehicle result (3.8x10 10 #/km) within PMP ILCE range Other SiC DPF vehicle (1.1x10 11 #/km) towards top end of PMP ILCE results for SiC DPF vehicles. PN trace suggests this vehicles DPF has a slightly lower efficiency than those tested in PMP ILCE. Cordierite DPF vehicle results (1.2x x10 11 #/km) spanned the single cordierite DPF vehicle test result in the PMP ILCE (6x10 11 #/km). MPI petrol vehicle results similar to SiC DPF vehicles as in the PMP ILCE. GDI vehicle emissions were at least an order of magnitude higher at 1.6x x10 12 #/km, consistent with results seen in the PMP ILCE. Conventional diesels were an order of magnitude higher again at 3.4x x10 13 #/km, consistent with PMP ILCE results for this technology. Where assessed repeatability was similar or better than that in the ILCE. Matter & Horiba systems showed consistent results CARB Au Vehicle result (3.8x10 10 #/km) within PMP ILCE range Other SiC DPF vehicle (1.1x10 11 #/km) towards top end of PMP ILCE results for SiC DPF vehicles. PN trace suggests this vehicles DPF has a slightly lower efficiency than those tested in PMP ILCE. Cordierite DPF vehicle results (1.2x x10 11 #/km) spanned the single cordierite DPF vehicle test result in the PMP ILCE (6x10 11 #/km). MPI petrol vehicle results similar to SiC DPF vehicles as in the PMP ILCE. GDI vehicle emissions were at least an order of magnitude higher at 1.6x x10 12 #/km, consistent with results seen in the PMP ILCE. Conventional diesels were an order of magnitude higher again at 3.4x x10 13 #/km, consistent with PMP ILCE results for this technology. Where assessed repeatability was similar or better than that in the ILCE. Matter & Horiba systems showed consistent results

Improved Calibration Procedures PMP meetings to discuss calibration procedures held on 7 th August and 8 th October. The following key revisions to the procedures were agreed – VPR will be calibrated for particle concentration reduction factor (a combination of particle losses and dilution) which must not be excessively size dependent – PNC will be calibrated to reference electrometer level This substantially reduces potential offset between systems by correcting out differences in particle losses and PNC linearity Revised calibration procedures have been circulated to PMP WG and are being added to PMP webpage PMP meetings to discuss calibration procedures held on 7 th August and 8 th October. The following key revisions to the procedures were agreed – VPR will be calibrated for particle concentration reduction factor (a combination of particle losses and dilution) which must not be excessively size dependent – PNC will be calibrated to reference electrometer level This substantially reduces potential offset between systems by correcting out differences in particle losses and PNC linearity Revised calibration procedures have been circulated to PMP WG and are being added to PMP webpage

Calibration Measurement Results EMPA, METAS, TSI & AEA undertook measurements during August-September demonstrating the procedures and their repeatability Further measurements were made at JRC in December to investigate the influence of aerosol material on PNC cut-off characteristic. EMPA, METAS, TSI & AEA undertook measurements during August-September demonstrating the procedures and their repeatability Further measurements were made at JRC in December to investigate the influence of aerosol material on PNC cut-off characteristic.

PNC Primary & Secondary Validation Gradients Primary & Secondary methods show similar results Repeatability generally good

PNC R 2 Validation Results Repeatability very good

PNC Cut-Off D50 Validation Check Repeatability very good

VPR pcrf Repeatability Repeatability very good at pcrf settings used for DPFs (typically ~150) and GDIs (typically ~600)

VPR Volatile Removal Efficiency 2 PNC and Hot-Cold results similar. Repeatability good

PNC Cut-Off Material Dependency Investigation of PNC cut-off material dependency suggests Emery Oil (EO) and CAST give similar results, C40 does not

Accumulation of Errors Analysis Analysis performed by the UK National Physical Laboratory according to ISO Guide to the Expression of Uncertainty in Measurement (GUM) taking account of improvements made at August & October PMP meetings. Report circulated as Informal 17. Uncertainty at typical settings for post DPF measurement was estimated to be around 15%. Similar levels are achievable for GDI measurement settings provided the procedures in the calibration documents are followed. The most significant factors contributing to uncertainty are the PNC calibration and the allowable tolerance on VPR pcrf validation checks Analysis performed by the UK National Physical Laboratory according to ISO Guide to the Expression of Uncertainty in Measurement (GUM) taking account of improvements made at August & October PMP meetings. Report circulated as Informal 17. Uncertainty at typical settings for post DPF measurement was estimated to be around 15%. Similar levels are achievable for GDI measurement settings provided the procedures in the calibration documents are followed. The most significant factors contributing to uncertainty are the PNC calibration and the allowable tolerance on VPR pcrf validation checks

Amendments To Reg 83 Proposal PN background correction allowed for ISC testing Diesel pre-conditioning procedures extended to GDIs also VPR must be calibrated for mean particle concentration reduction factor (pcrf) (mean of 30nm, 50nm and100nm results) across its range of dilution settings VPR pcrf for 30nm and 50nm particles must be no more than 30% and 20% respectively higher than for 100nm particles VPR must have a minimum dilution factor upstream of the ET of 10 PNC must be corrected to reference electrometer reading Charcoal scrubbing of dilution air is now optional Reference filter rejection criteria clarified PN background correction allowed for ISC testing Diesel pre-conditioning procedures extended to GDIs also VPR must be calibrated for mean particle concentration reduction factor (pcrf) (mean of 30nm, 50nm and100nm results) across its range of dilution settings VPR pcrf for 30nm and 50nm particles must be no more than 30% and 20% respectively higher than for 100nm particles VPR must have a minimum dilution factor upstream of the ET of 10 PNC must be corrected to reference electrometer reading Charcoal scrubbing of dilution air is now optional Reference filter rejection criteria clarified Based on the results of the Roadmap activities and detailed discussion of the draft proposal at the 9th October PMP meeting the following amendments have been made to the proposal to amend Regulation 83

Amendments To Reg 83 Proposal Upper limit of PNC range no longer restricted to 10,000cm -3 PN measurement system residence time and T90 requirements clarified PNC linearity requirements, in secondary calibration process, now assessed on the basis of normal measurements rather than log of measurements Validation check of PNC cut-off performance introduced as part of calibration Monthly PNC linearity check deleted, PNC flow check changed from daily to monthly PNC zero and leak check tolerances tightened A number of other detailed corrections and clarifications have been made in particular in response to CLEPA and OICA written comments from GRPE 54 Upper limit of PNC range no longer restricted to 10,000cm -3 PN measurement system residence time and T90 requirements clarified PNC linearity requirements, in secondary calibration process, now assessed on the basis of normal measurements rather than log of measurements Validation check of PNC cut-off performance introduced as part of calibration Monthly PNC linearity check deleted, PNC flow check changed from daily to monthly PNC zero and leak check tolerances tightened A number of other detailed corrections and clarifications have been made in particular in response to CLEPA and OICA written comments from GRPE 54