LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Floating MD week 28 summary
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Luminosity lifetime – fill 2932
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Summary Friday h38: Ramp down and pre-cycle.
LHC progress Week 30 summary 30th July 2012
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
LHC Morning Meeting - G. Arduini
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Coordination: G. Arduini, E.B. Holzer
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Summary of Week 16 G. Arduini, J. Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Friday 31st August & night
Mike Lamont, Jorg Wenninger
Wednesday 8th August & night
Friday March 4th 08h32: Access for beam dump system.
Summary week 29 VdM scans Luminosity production
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Chromaticity can make a difference…
Sunday
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday :20 beta beat corrections during squeeze for flat machine finished Afterwards fixing issues at injection: BPM rephrasing for B2 solved.
LHC Morning Meeting - G. Arduini
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Summary for LPC (March 7th, Ralph Assmann)
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Thursday 30th September De-bunching test
Wednesday h18: 228b fill lost just before start of ramp.
Tuesday – Morning and Evening
Another Immortal Fill….
31/3/2010 Difficult day… but at the end stable beams.
HI2011 Commissioning Status
Monday 152 bunch operation summary
Presentation transcript:

LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven Gianluigi Arduini and Elias Metral in close attendance

Week 32 13-08-12 LHC summary

Integrated luminosity for the week: ~720 pb-1 Week 32 - fills Integrated luminosity for the week: ~720 pb-1 13-08-12 LHC summary

PERFORMANCE 13-08-12 LHC summary

Luminosity 13-08-12 LHC summary

Bunch intensity 13-08-12 LHC summary

Emittance 13-08-12 LHC summary

Rende Steerenberg, Bettina Mikulec, Verena Kain et al Last LMC… Rende Steerenberg, Bettina Mikulec, Verena Kain et al 13-08-12 LHC summary

Timeouts Monday: Spent most of the shift with no beam from the SPS, due to a problem with the PFN switch on the SPS MKE4 (9 hours) TDI IP8 which got stuck when moving out after injection, resulting in a large angle. Thursday SIS triggered following network issue in CCR Access (Atlas Xenon), while SPS is still down for EDF intervention. Sunday BPMS triggered after 144b injection – N times – fixed by Eva Calvo 13-08-12 LHC summary

BPMS Eva Calvo 13-08-12 LHC summary

Stability level investigations Fill Date <Ib> Q’ Oct TFB Comment 2911 Sat 1.51 417, 475 reduced in collision Heavy losses in squeeze Saved by raising Q’ 2912 1.52 +5 Looking good 2913 1.56 Losses in collision BP 2915 330, 417 2917 Mon 1.48 +2 150, 417 reversed Losses end squeeze 2918 Losses end ramp (after Q’ trim) 2919 Tues 1.47 200, 417 Heavy losses end squeeze 2920 1.46 200 to 475 Sudden losses flat-top Sudden losses end squeeze Exploration of octupole -chromaticty space Octupoles not reversed. 13-08-12 LHC summary

Octupole polarity switch - Tuesday Flip polarity at injection: 6.5 A Injected 1374 bunches successfully: stable Also stable with reduced damper gain Octupoles at 417 A at flat-top & squeeze Test ramp with pilot bunches – reasonable measurement of chromaticity through ramp, squeeze and collide Measurements fed-forward into settings for next ramp. Aim for chroma +5 at end of ramp all the way into collision Fill with 12 nominal bunches: no problem Fill with 480 bunches: Stable Beams for 1 hour: no problem Tune scan at collision shows enough space Reduce octupole current after one hour: Loose 3 non-colliding bunches at 23 A (from 250 A): OK 13-08-12 LHC summary

Tune scan at start of collisions Steps of 1e-3 both planes, both beams Initial tune +3e-3 with respect to end squeeze (~nominal settings) Given below – this tune increase in collision beam process removed -1e-3 -1e-3 -1e-3 -1e-3 etc.. 13-08-12 LHC summary

Reverse polarity operations Fill Date <Ib> Q’ Oct TFB Comment 2926 Tues 1.39 417,300 N/C 480b – no problem 2927 Wed AM 1.43 Vertical instability squeeze 2928 Wed PM 1.48 475,360 Vertical instability end squeeze 2929 1.45 H+4 V+5 510,395 B2V unstable at 1.5 m 2932 Thu AM 1.44 V+2 510,395,250 2933 Thu PM 1.46 H+2 Heavy losses B2 end squeeze- vertical tune 2934 Lovely physics fill Wound up octupoles and then chromaticity until stable Looking good up to 1.55e11 ppb 13-08-12 LHC summary

2927 Tune – B1V 13-08-12 LHC summary

2927 Beam sizes 13-08-12 LHC summary

2933 Beam 2 vertical tune 13-08-12 LHC summary

Now manually checking these as well… (QFB in ramp issues) 2933 QTD squeeze functions 2933 Now manually checking these as well… (QFB in ramp issues) 13-08-12 LHC summary

Luminosity lifetime – fill 2932 Octupoles, Q’ reduced Systematic reduction of octupoles/chromaticity once in collisions 13-08-12 LHC summary

CMS magnet status c/o Greg Rakness Temperature (K) Fast dump Cause of magnet fast dump is under review. Details will be communicated as they are understood. Estimated time of CMS “Ready for physics”: sometime Tuesday night (including time for He refill)  to be confirmed Monday 13-08-12 LHC summary

Machine development POST CMS SOLENOID ABORT Friday morning++ Machine development POST CMS SOLENOID ABORT 13-08-12 LHC summary

Machine development program Friday take beam for polarity checks – intervention in SPS for wire scanner repair (back around midnight) Sat AM: test ramp for chromaticity measurements through the cycle Sat 12:00 New SPS optics Q20 in SPS Transfer and injection checks into the LHC Take beams through the cycle Sun AM: High intensity tests with normal setup Sun PM: Transverse damper tune measurement tests Sun night: Physics Mon & Tue: Switch ALICE polarity & increase ALICE crossing angle 24 hour program (injection, tertiary collimators through the cycle, loss maps) 13-08-12 LHC summary

Polarity checks MO polarity check: MCO polarity check: KSS: applied trims to the MO family by family (32 in total) and observed the shift in Q'' with respect to reference measurements of the nominal machine performed at the start and end. Observations seem to agree with what we expected from the madx predictions for all the families. This will be confirmed offline. MCO polarity check: Powered the MCO family by family (7 for B1, 5 for B2) to k=-30. Observed the Q'' shift for each case. Will confirm the polarities offline but didn't notice any that were wrong during the measurement. KSS: performed AC dipole measurements with the A12 KSS family for beam1 and beam2 powered to k=+0.5. Kicked at +-80Hz and observed shift in coupling well outside the error bar. More analysis offline.. Rogelio & team 13-08-12 LHC summary

Chromaticity at the end of the week - H Flat top Squeeze Collide 13-08-12 LHC summary

Chromaticity at the end of the week - V Flat top Squeeze Collide 13-08-12 LHC summary

Stability investigations 1/2 At flat-top with ~2.16x10^14 p(B1) a ~2.12x10^14 p(B2) and for chromaticity of 11 in both planes could reduce the octupoles to 200 A with no sign of instability (during this process we kept the chromacity constant by trimming the chromaticity according to the tables established earlier) Went through the squeeze with octupoles at 540 A and chromaticity of 11. Some incoherent losses but no sign of instability. Gianluigi Arduini et al 13-08-12 LHC summary

Stability investigations 2/2 End of the squeeze with 2.13 p(B1) and 2.05 (B2) Could reduce the octupoles to 200 A with no sign of instability Trimmed the octupoles to 312 A: Chromaticity H could be reduced to 5 units with no sign of instability Chromaticity V could be reduced to 7 units - vertical instabilities on selected bunches – heavy losses – end of 144b trains Trimmed the octupoles to 428 A: Chromaticity V could be reduced to 5 units and in that case the beam become unstable with losses at the end of the 144 trains 13-08-12 LHC summary

Wolfgang Hofle, Daniel Valuch, Frederic Dubouchet Q measurement Filled Machine with 6x6 bunches for each beam, bucket 1 and 651, both beams. Kicked the first 6 bunches of both beams and planes for 4 turns every 4 seconds during entire cycle from prepare for ramp to collisions; recorded oscillation transients for computation of tune. We did not change the excitation tune during the squeeze (kept the injection setting), the system was tracking correctly the tune change during start of squeeze. Increased losses during squeeze due to the blown-up 6 bunches that were kicked. Emittance of the 6 not kicked bunches remained small. Wolfgang Hofle: We are quite confident the tested method can be used as an operational method to measure the tune. Daniel and Frederic Dubouchet did a great job so everything worked very smoothly. Wolfgang Hofle, Daniel Valuch, Frederic Dubouchet 13-08-12 LHC summary

ADT tune measurement test 13-08-12 LHC summary

Incoming Alice polarity flip [Stability investigations continued Reference orbit Injection Collimation through cycle Loss maps [Stability investigations continued Batch to batch to blow-up Split collision BP] Back to physics when CMS ready 13-08-12 LHC summary