Allocation of Capacity in Portugal Under the New Regulation

Slides:



Advertisements
Similar presentations
Secondary Market with Transmission Capacities ČEPS, a.s. 11/2006.
Advertisements

Allocation of Capacity in Portugal Under the New Regulation 24th IG meeting S-GRI, Madrid September 23, 2013.
15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
15 th September 2013 Enagás and TIGF Information to NRAs.
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
PILOT PROJECT ON CAM 17 th SG meeting Madrid 27 th September 2012.
1 Warsaw, 16 October 2012 the system, that connects New Gas Market Model in TNC.
ERSE General presentation from ERSE about the current natural gas regulatory situation in Portugal 2nd Regional Coordination Committee (RCC) Meeting of.
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
Improvement of transparency of regional Virtual Trading Points in SSE
29th November 2016 Teleconference
Fuel Cost Components in the Fuel Adder
Congestion Management
Fuel Cost Components in the Fuel Adder
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
21st IG Meeting South Gas Regional Initiative
Fuel Cost Components in the Fuel Adder
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
25th IG meeting 13th December 2013
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Strategic rationale According to Roadmap project shall focus on short-tem capacity issues: maximising use of existing capacity including reserve capacity.
Demand forecast and network balancing
13th December 2013 Teleconference
Harmonization of Cross Border Transmission Tariffs between
20th April 2016 Teleconference
19th June videoconference
26th IG meeting 23th January 2014
4th October 2016 Teleconference
Allocation of Capacity in Portugal Under the New Regulation
Background and Process
CMP Transparency Requirements
2°Questionnaire for the assessment of the main features of
37th IG Meeting South Gas Regional Initiative
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
20th April 2016 Teleconference
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
41st IG meeting 24th January 2017
37th IG Meeting South Gas Regional Initiative
Improvement of transparency of regional Virtual Trading Points in SSE
20th April 2016 Teleconference
29th April 2014 Teleconference
Day-ahead market coupling
4th October 2016 Teleconference
24rd SG meeting 8th february 2018
Improvement of transparency of regional Virtual Trading Points in SSE
24th January 2017 Teleconference
37th IG Meeting South Gas Regional Initiative
41st IG meeting 24th January 2017
Enagás, GRTgaz, REN and TIGF
2°Questionnaire for the assessment of the main features of
29th November 2016 Teleconference
39th IG meeting 4th October 2016
EURELECTRIC transparency requirements
Improvement of transparency of regional Virtual Trading Points in SSE
39th IG meeting 4th October 2016
Presentation transcript:

Allocation of Capacity in Portugal Under the New Regulation 20th SG Meeting, S-GRI, Madrid 15th November 2013

Index Main changes New Regulatory Framework Capacity Management 18-09-2018 Index Main changes New Regulatory Framework Capacity Management Some results Secondary Market ERSE - Entidade Reguladora dos Serviços Energéticos 18-09-2018 ERSE - Entidade Reguladora dos Serviços Energéticos

Main changes What has change with the new regulation on Access to Gas Infrastructures? Five Major changes The new Regulation sets a complete new standard for capacity booking and trading, promoting convergence with CAM NC and enabling the implementation of secondary market Capacity rights to use the transmission system are offered to Shippers Assignment of capacity rights by the TSO for MT and ST products Capacity allocation calendar, standardization of products, allocation through auction, etc Convergence towards CAM NC rules Shippers pay according to allocated capacity, instead of used capacity, at all entry/exit points (except LDC) Ex-ante payment of capacity rights Improves interaction between primary and secondary market, while enabling daily auctions Capacity allocation via booking platform (Primary Market) Enhances liquidity, avoiding contractual congestion Promotion of the secondary market for capacity rights trading ERSE - Entidade Reguladora dos Serviços Energéticos 18-09-2018

New Regulatory Framework Changes within the scope of Regulatory documents Relevant regulatory documents that govern the capacity allocation process: Main activities Programming / Nomination Daily Operation / System Management MAC, MEDC, MRC (per infrastructure) MPGTG Before System Operation Commercial Margins Imbalances Penalties Cap. Calculation Cap. Programming Congestion Mgmt. Assignment of Capacity Rights MPAI MPGTG Product definition Auction rules Cap. Allocation Invoicing Credit Risk Mgmt. Combines former contents with nomination rules Includes provisions on Secondary Market After NOTE: MPAI (Infrastructure’s Access Procedures Manual) – New regulatory document, encompasses former 8 documents governing cap. calculation (MEDC), cap. allocation (MAC), congestion management (MRC) and Strategic Reserves storages ERSE - Entidade Reguladora dos Serviços Energéticos 18-09-2018

Capacity Management A major change in the capacity management chain 18-09-2018 Capacity Management A major change in the capacity management chain Until 30th September, 2013 Commercial Mgmt. (TSO) Available capacity is published Programming/ Nominating ‘Allocation’ Utilization Payment due for used capacity Global System Manager Before Gas Day Gas Day After Gas Day As from 1st October, 2013 Commercial Mgmt. (TSO) Available Products Capacity allocation (auctions) Capacity contracting Payment due for contracted capacity Shippers Forecasts/ Nomination Utilization Global System Manager ERSE - Entidade Reguladora dos Serviços Energéticos 18-09-2018 ERSE - Entidade Reguladora dos Serviços Energéticos

Capacity Management Standard Products offered Products \ Maturity Yearly Quarterly Monthly Daily (week-ahead) (day-ahead) Storage of LNG x Underground storage Physical IPs (*) Regasification at LNG terminal Backhaul at LNG terminal UGS injection UGS withdrawal (*) only for unbundled capacity at Valença do Minho and Campo Maior (outside the VIP) ERSE - Entidade Reguladora dos Serviços Energéticos 9/18/2018

Capacity Management 2013/ 2014 2014/ … Calendar for 2013 and beyond (VIP) Y and Q Capacity Auctions (VIP) M and D Cap. Allocation (FCFS) Yearly Capacity Products * Yearly Consumption Forecast Quarterly Capacity Products * Monthly Capacity Products * Y and M Utilization Forecast Rolling Day-Ahead Capacity Auctions 2013/ 2014 30.Sep 2013 - 30.Sep 2014 Jun/Jul As from Jul 31.Jul-06.Sep 3.Sep 06–13.Sep 13 - 20.Sep 23.Sep Daily Capacity (Re)-Nomination Governing Reg. MPAI MPGTG 2014/ … 30.Sep 2014 - 30.Sep … Mar Jun As from Sep 3.Sep 16 - 23.Sep Yearly Capacity Auctions Quarterly Capacity Auctions Rolling Monthly Capacity Auctions Yearly Consumption Forecast Yearly and Monthly Utilization Forecast Rolling Day-Ahead Capacity Auctions * This activity includes the publication of available capacity, the auction and the final allocation of capacity to shippers ERSE - Entidade Reguladora dos Serviços Energéticos 18-09-2018

Capacity Management 2014/ … Calendar for 2014 and beyond Governing Daily Capacity (Re)-Nomination Governing Reg. MPAI MPGTG 2014/ … 30.Sep 2014 - 30.Sep … Mar Jun As from Sep 3.Sep 16 - 23.Sep Yearly Capacity Auctions Quarterly Capacity Auctions Rolling Monthly Capacity Auctions Yearly Consumption Forecast Yearly and Monthly Utilization Forecast Rolling Day-Ahead Capacity Auctions ERSE - Entidade Reguladora dos Serviços Energéticos 18-09-2018

Some Results On assignment of Capacity rights (*) Only for unbundled capacity at Valença do Minho and Campo Maior (outside the VIP) (**) Monthly products for October and November Until now, no Quarterly and Daily capacity rights have been bought at LNG Terminal and Transmission network. ERSE - Entidade Reguladora dos Serviços Energéticos 18-09-2018

Some results On assignment of Capacity rights Nominations % of booked capacity Average Minimum Maximum IP Campo Maior (*) 94% 83% 100% IP Valença do Minho (*) 91% Regaseification at LNG Terminal 66% 28% (*) only for unbundled capacity at Valença do Minho and Campo Maior (outside the VIP) ERSE - Entidade Reguladora dos Serviços Energéticos 9/18/2018

Secondary Market Main Rules Since October 2013 : Primary capacity holders can sell the total allocated capacity or part of it. The sell can be placed at OMIP platform: Allows transferring the capacity use or also the rights and obligations Optional financial settlement (OMIClear) Products Cascading Y > Q > M > D TSO has the option of buyback ERSE - Entidade Reguladora dos Serviços Energéticos 18-09-2018

Secondary Market Operations Bilateral Model (OTC) and anonymous for third parties. For all products (annual, quarterly monthly and daily). All authorized shippers are allowed to buying/selling the capacity. The operations can be done on a efficient way (fax / e-mail / recorded phone call). Flexible Financial settlement (optional) IF Price = 0 => Settlement between the two shippers IF Price > 0 => Settlement by OMIClear Fungibility of positions (compensation effect: Sales cancel purchases)> full netting of positions and responsibilities Types of Collateral: cash and bank guarantees Maturity: (i) By cascading (long contracts); (ii) By notice to the System Operator Dissemination of information: All information on transactions, positions and deliveries on a centralized system Payment of Fees by shippers ERSE - Entidade Reguladora dos Serviços Energéticos 18-09-2018

ERSE - Entidade Reguladora dos Serviços Energéticos Thank you ENTIDADE REGULADORA DOS SERVIÇOS ENERGÉTICOS Rua Dom Cristóvão da Gama, 1, 3º 1400-113 Lisboa Portugal Telefone: +(351) 21 303 32 00 e-mail: pverdelho@erse.pt url: http://www.erse.pt ERSE - Entidade Reguladora dos Serviços Energéticos 18-09-2018