Charlie Zelle, Commissioner Minnesota Department of Transportation February 10, 2014.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
1 A B C
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
/ /17 32/ / /
Transportation Day at the Capitol Jon Chiglo, Director of Engineering Services Minnesota Department of Transportation February 23, 2012.
AP STUDY SESSION 2.
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Cost Behavior, Operating Leverage, and Profitability Analysis
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
David Burdett May 11, 2004 Package Binding for WS CDL.
CALENDAR.
Update to Governor Dayton October Better Government for a Better MN TFAC was formed to provide a bold funding proposal to address the states transportation.
Introduction to MnDOT Finances Transportation Finance Advisory Committee May 18,
KEEP MOVING TO KEEP AHEAD MAY MnDOT Vision and Mission Vision: Transportation leader, committed to upholding public needs and collaboration with.
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
R O A D U S E R F E E T A S K F O R C E 1 OREGONS TRANSPORTATION FUNDING CHALLENGE.
1 1  1 =.
1  1 =.
CHAPTER 18 The Ankle and Lower Leg
Summative Math Test Algebra (28%) Geometry (29%)
The 5S numbers game..
1 Incorporating Extreme Weather Risks in Asset Management Planning Lynn Clarkowski.
Break Time Remaining 10:00.
The basics for simulations
PP Test Review Sections 6-1 to 6-6
MM4A6c: Apply the law of sines and the law of cosines.
Look at This PowerPoint for help on you times tables
MCQ Chapter 07.
Merchandise Inventory,
Merchandise Inventory,
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Chapter 1: Expressions, Equations, & Inequalities
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
Adding Up In Chunks.
FAFSA on the Web Preview Presentation December 2013.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Michigan’s Transportation Funding Act
New Hope Baptist Church Sunday, January 29, 2012.
Before Between After.
Subtraction: Adding UP
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Keep Moving to Keep Ahead / INVESTING IN TRANSPORTATION FOR THE NEXT 20 YEARS Recommendations from the Minnesota Transportation Finance Advisory Committee.
Select a time to count down from the clock above
Copyright Tim Morris/St Stephen's School
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
County Transportation System Governor’s Transportation Advisory Committee September 14, 2012 Abbey Bryduck, AMC Policy Analyst.
International Partnership Meeting Thursday, January 17, 2013 Washington D.C. 1.
Charlie Zelle, Commissioner Minnesota Department of Transportation February 18, 2014.
Sue Mulvihill, Deputy Commissioner & Chief Engineer Minnesota Department of Transportation.
Metro Cities Transportation Policy Committee August 10, 2015 Overview of Minnesota Highway and Transit Finance.
Minneapolis Regional Chamber of Commerce, Critical Issues Forum Charlie Zelle, Commissioner Minnesota Department of Transportation.
Investing in Transportation Infrastructure Government Research Association Annual Policy Conference Janet Oakley, AASHTO July 28, 2009.
Transportation Finance Advisory Committee May 18, 2012.
Presentation transcript:

Charlie Zelle, Commissioner Minnesota Department of Transportation February 10, 2014

Health… the people the environment the economy U.S Bureau of Economics: MN ranked 5 th among nations fastest growing economies Politico: MN ranked 2 nd best state in the nation

What we do today impacts tomorrow: Population will increase by 1M (2030) Population is growing and changing Truck freight increases 30% (2030) Customers Increasingly value and rely on transportation options Other states are investing in transportation

50% state highway pavements are over 50 years old 35% of MnDOT bridges are over 50 years old MN 9 th most extreme temperature variations in the nation Interstates in MN rank 38 th in the nation 5

Transportation Finance Advisory Committee (TFAC) $50B in total needs over 20 years, all modes To achieve an economically competitive system Funding Needs: Need $30B for the state highway system alone Forecasts of $18B capital revenue over 20-years Risk: Need revenue source(s) that mitigate inflation risk Deferred preservation of roads and bridges increases life cycle costs Federal fiscal outlook increases states risk and responsibility

20 Year Funding Needs Economically Competitive System/Mode FUNDING GAP State Highway System* (Includes bike and pedestrian needs) $ $500 mil- $600 mil AFG County State Aid System County System $9.0 $450 mil AFG $9.0 $450 mil AFG Township Roads $0.5 Municipal State Aid System Municipal System $2.0 $100 mil AFG $8.0 $400 mil AFG Greater Minnesota Transit $0.9 $45 mil AFG Metropolitan Area Transit $4.2 $210 mil AFG Passenger Rail $ $250 mil -$350 mil AFG Freight - Rail and Ports $0.6 $30 mil AFG State Airports $0.8 $40 mil AFG Metropolitan Airports Commission $0.6 $30 mil AFG Totals $50.6 -$54.6 Source: TFAC 2012

Metro Area Multimodal Vision 8

Loss of purchasing power, due to inflation Increased life-cycle cost Debt ceiling 9

Life Cycle

12

Additional $12B investment over 20 years, yields $31B (average) benefit ROI 2.5 Project types with the highest ROI: Active Traffic Management General Congestion Mitigation Safety Spot Improvements 13 Source: Smart Growth America Report

14 MnDOT is replacing or rehabbing 172 Bridges Large-Scale Bridge Projects Shown – total costs are estimated Desoto (TH 23) in St. Cloud over the Mississippi River (complete) – $39M Robbin-Drayton (TH 11) of the Red River (complete) – $16.5M Hastings (US 61) over the Mississippi River (underway) – $147.8M Lafayette (US 52) in St. Paul over the Mississippi River (underway) – $172.4M St. Peter (TH 99) over the Minnesota River (underway) – $3.5M Dresbach (I-90) over the Mississippi River (underway) – $212.8M Cayuga (I-35E) in St. Paul over Cayuga Street (underway) – $194.2M St. Croix Crossing (TH 36) over the St. Croix River (underway) – $280M to $310M Winona (TH 43) over the Mississippi River (beings 2015) – $158.6M Sorlie (US 2B) in East Grand Forks over the Red River (begins 2017) – $45.5M to $61.5M Baudette (TH 72) over the Rainy River (begins 2017) – $59.8M to $79.7M Red Wing (US 63) over the Mississippi River (beings 2017) – $160M to $240M New Ulm (TH 14) over the Minnesota River (begins 2017) – $44.1M to $51.4M

15 MnDOT is completing other projects as well Major Projects Utilizing Chapter 152 Bonds Shown – total costs are estimated TH 55 Pavement Improvement from near Kensington to Glenwood - $11.8M TH 60 two-to-four-lane conversion from Bigelow to Worthington - $68.9M TH 169/I-494 Interchange - $170.0M I-90 Concrete Overlay East of Rochester - $16.3M I-35 Concrete Overlay from near Sturgeon Lake to Mahtowa - $17.3M TH 11 Pavement Improvement from Frontier to Indus - $15.1M TH 23 Mill and Overlay from Russell to Marshall - $21.7M I-35 Bridges in Duluth - $88.6M I-94 Interchange at Albertville - $11.3M I-94 Lowry Hill Tunnel to John Ireland Blvd - $28.0M US 169 Brooklyn Park - Interchanges, Bridges, etc. - $58.6M Better Roads Program example - I-35 Maryland to University - $111.0M Flood Mitigation example - Realign Hwy 75; new bridge near Kent - $10.4M

Performance-based design projects (Hwy 169/494, TH100 near Hwy 7) MnPASS Lanes Innovative Construction Methods – Maryland & Hastings Bridges Both projects benefited from 08 (Chapter 152) funding 16 Original bridge Float down the river 9/12/12 Completed bridge Lifted into place 60 hours later HASTINGS BRIDGE: $120M. New bridge was built next to the old structure to keep the river crossing open to travelers and avoid a 47-mile detour.

Enhancing Financial Effectiveness MnDOT runs the equivalent of a multi-billion dollar project execution and services business Focused on being effective, accountable, transparent and efficient 17

Seek a sustainable, long-term solution Addresses inflation risk Upholds tenets of user pay Discussions underway Apply general sales tax rate to wholesale gas receipts to hedge against inflation? Restructure Tab Fees? Redirect sales tax collected on leased vehicles; auto parts, etc. to non-trunk highway transportation needs? Next generation revenue sources?

Thank you Comments / Questions