Prevention of Over - Pressurization Training Package TP 05/05 1 Asia Industrial Gases Association 298 Tiong Bahru Road, #20-01 Central Plaza, Singapore.

Slides:



Advertisements
Similar presentations
FIGURE 7.1 Elements of the final control operation.
Advertisements

Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
PressureGuard Module One - Introduction.
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright Pearson Prentice Hall
Processes and Operating Systems
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Unit C: Agricultural Power Systems
David Burdett May 11, 2004 Package Binding for WS CDL.
AUTOMOTIVE COOLING SYSTEMS
AUTOMOTIVE BRAKING SYSTEMS
FIGURE 2.1 The purpose of linearization is to provide an output that varies linearly with some variable even if the sensor output does not. Curtis.
FIGURE 5.1 Potentiometric displacement sensor.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
What gas makes up 78% of our atmosphere?
1. Name the particles in the atom and give the charges associated with each.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Module 2: General Working Conditions 2.1 Housekeeping & Slips, Trips, & Falls Susan Harwood Grant Number SH F-23.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Fire Protection Systems
Red Tag Date 13/12/11 5S.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
Hazardous Waste Section
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Vocabulary.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Gas Management Systems
Mobile Air Conditioning
10/12/ Vacuum Regulator Gas Feed Systems: Theory and Maintenance Thom DiGeronimo OperatorSchool.Com.
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Fire Hazards of Oxygen Enriched Atmospheres
8 July 2004 Page 1 Training Package TP 01/04 Oxygen Deficiency Disclaimer All publications of AIGA or bearing AIGA’s name contain information, including.
Slide 1 Asia Industrial Gases Association 298 Tiong Bahru Road, #20-01 Central Plaza, Singapore Internet: http// Asia Industrial.
Asia Industrial Gases Association 3 HarbourFront Place, #09-04 HarbourFront Tower 2, S(099254) Internet: http// Oxygen Enrichment Risks.
THE WORK PERMIT SYSTEM (Reference document: AIGA 011/04 «Work Permit Systems») Training Package 06/06 Asia Industrial Gases Association 298 Tiong Bahru.
Asia Industrial Gases Association
Training Package 1 Fire Hazards of Oxygen and Oxygen enriched atmospheres Training Package TP 02/05 Oxygen Enrichment Risks Asia Industrial Gases Association.
Presentation transcript:

Prevention of Over - Pressurization Training Package TP 05/05 1 Asia Industrial Gases Association 298 Tiong Bahru Road, #20-01 Central Plaza, Singapore Internet: http//

Over-Pressurization 2 Prevention of Over - Pressurization Disclaimer All publications of AIGA or bearing AIGA’s name contain information, including Codes of Practice, safety procedures and other technical information that were obtained from sources believed by AIGA to be reliable and/ or based on technical information and experience currently available from members of AIGA and others at the date of the publication. As such, we do not make any representation or warranty nor accept any liability as to the accuracy, completeness or correctness of the information contained in these publications. While AIGA recommends that its members refer to or use its publications, such reference to or use thereof by its members or third parties is purely voluntary and not binding. AIGA or its members make no guarantee of the results and assume no liability or responsibility in connection with the reference to or use of information or suggestions contained in AIGA’s publications. AIGA has no control whatsoever as regards, performance or non performance, misinterpretation, proper or improper use of any information or suggestions contained in AIGA’s publications by any person or entity (including AIGA members) and AIGA expressly disclaims any liability in connection thereto. AIGA’s publications are subject to periodic review and users are cautioned to obtain the latest edition.  AIGA AIGA grants permission to reproduce this publication provided the Association is acknowledged as the source Asia Industrial Gases Association 298 Tiong Bahru Road, #20-01 Central Plaza, Singapore Internet: http//

Over-Pressurization 3 What is Over-Pressurization?  The increase of pressure inside a piece of equipment beyond its ability to hold that pressure.  Vessels and tanks  Cylinders and bottles  Compressors and pumps  Piping and tubing  Hoses and flex joints  Instruments and valves

Over-Pressurization 4 This could hurt. Now imagine if you were near a vessel, pipe or cylinder when it ruptured! Imagine - Blowing Up a Balloon

Over-Pressurization 5 Over-Pressurization Hazards  Ruptured process vessels, cylinders, piping  Whipping hoses  Flying debris and shrapnel  Serious injury  Death

Over-Pressurization 6 Hazardous result An ammonia cylinder that failed due to overfilling & hydraulic-king

Over-Pressurization 7 Over-Pressurization Kills  Incident 1: Liquid trapped in the ball of a ball valve expanded, causing the valve to come apart. Worker dies when contents of CO2 storage tank released in his direction.  Incident 2: A chlorine cylinder ruptures during fill procedure, killing worker in the same room.

Over-Pressurization 8 Over-Pressurization Kills  Over-pressurization can occur at your location too!

Over-Pressurization 9 Causes of Over-Pressurization  Faulty process control  Process upsets  Trapped liquefied gases  In a pipe or hose between two closed valves  In a ball or gate valve not designed to relieve internal pressure

Over-Pressurization 10 Causes of Over-Pressurization  Poor equipment and process design  Uncontrolled modifications  Human ignorance  Human error

Over-Pressurization 11 Faulty Process Control  Improperly calibrated control devices (temperature, pressure, flow, level…)  Malfunctioning control sensing device such as:  Isolation valves closed  Inlet ports blocked  Devices damaged

Over-Pressurization 12 Faulty Process Control (cont’d)  Malfunctioning control valves  Sticking control valves, solenoids  Closed or throttled isolation or bypass valves

Over-Pressurization 13 Process Upsets  Sudden flow rate, temperature or pressure changes  Process operation outside of established operating limits

Over-Pressurization 14 Trapped Liquefied Gases  Expand as they warm and vaporize  Pressure rises can exceed most process valves, piping and hoses pressure ratings  If no vapour in the trapped space, hydraulic loading can occur - leads to extremely high pressures in a very short time

Over-Pressurization 15 Liquefied Gases  If allowed to reach ambient (room) temperatures:  Liquid carbon dioxide could reach 1,100 psi!*  Liquid gases like helium, hydrogen, nitrogen, oxygen and argon could reach 22,000 to 50,000 psi!* * If the container could hold the pressure.

Over-Pressurization 16 Liquefied Gases (cont’d)  Do not over-fill a cylinder or tank  Maintain proper vapour space  Do not trap liquid gases  Must be able to relieve pressure

Over-Pressurization 17 Liquefied Gas (cont’d)  Expand 700 to 800 times in volume as they suddenly change (“flash”) from a liquid state into a gas.  Results in a tremendous force similar to that released in an explosion.

Over-Pressurization 18 Trapped Liquid With vapour As temperature rises, a given mass of liquid can require more room (its density changes)... Vapour can be compressed. So it makes room for the expanding liquid. Pressure rises gradually with temperature. Eventually, most liquefied gases will develop pressures that will rupture the container.

Over-Pressurization 19 Trapped Liquid Without vapour Liquid cannot be compressed, so as it gets bigger, it has to go somewhere! It quickly develops extremely high pressure. As temperature rises, a given mass of liquid can require more room (its density changes)...

Over-Pressurization 20 With and Without vapour Heat Input Pressure (psig) Liquid and vapour pressure rises gradually, but still reaches higher pressures than what typical equipment can contain. The pressure of liquid without vapour rises quickly.

Over-Pressurization 21 Ball Valve Hazard Potential (Side View) Seal Stem Downstream (Lower Pressure) Upstream (Higher Pressure) Trapped Liquid Valve Body

Over-Pressurization 22 Hazardous Result (Side View)

Over-Pressurization 23 Downstream (Lower Pressure) Upstream (Higher Pressure) Ball valves have 1/8” hole in ball Alternatively, ball valves have special self- relieving seats Valve Design for Internal Relief

Over-Pressurization 24 Gate Valve Notch cut in gate

Over-Pressurization 25 Faulty System Design  Equipment not designed for pressure or temperature extremes  Missing or isolated pressure relief devices  Relief devices that are too small

Over-Pressurization 26 Faulty System Design (cont’d)  Relief devices not set properly  Unanticipated modes of operation  Stressed piping, tubing, connectors  Relying solely on humans to control pressure

Over-Pressurization 27 Case Study: Faulty System Design  A gas heater vessel ruptured at a CO2 plant in 1998  A dryer switching valve failed in open position.  High pressure process gas (800 psig) then entered the lower-pressure regeneration gas system.  The regeneration gas heater safety relief valve was not big enough to handle process gas flow rates.  The heater vessel ruptured.

Over-Pressurization 28 Human Ignorance & Error  Filling a low pressure cylinder on a high pressure filling manifold  Replacing relief devices with devices of a different design or pressure setting  Replacing a section of pipe, a valve or other process component with one that has a lower pressure rating than the original

Over-Pressurization 29 Human Ignorance & Error(cont’d)  Compromising the integrity of a process component (dents, crimping, unchecked corrosion)  Not following established procedures

Over-Pressurization 30 Case Study: Human Ignorance & Error  Whipping hose during leak test:  Employee connected a 250 psig rated air hose to a high pressure nitrogen source.  He pressurized hose and manifold to 350 psig.  He discovered manifold leak, vented pressure and repaired leak.  Blow gun was attached to hose and employee claims that pressure was set to 200 psig.  Hose fitting failed, hose whipped and shredded a portion of employee’s coveralls.

Over-Pressurization 31 Protecting Ourselves  Knowledgeable Employees  Proper training  Properly Designed Processes  Equipment that is good for the pressure  Control system designs that consider all scenarios  Valves with internal relief capability (for liquefied gases)

Over-Pressurization 32 Protecting Ourselves (cont’d)  Pressure Relief Devices  Relief valves, rupture disks  Dual relief valves with diverter valves  Proper Operating Procedures  Proper Maintenance Procedures

Over-Pressurization 33 Proper Maintenance  Relief Valves Calibration  Bench tested and reset every 5 years  Relief devices missing their wire seal must be removed from service and tested  Recalibration must be by a qualified person  Malfunctioning Relief Devices  Plugged or restricted inlets or outlets  Rust and dirt or ice in spring mechanism

Over-Pressurization 34 Proper Maintenance (cont’d)  Process Controls and Sensing Devices Calibration  Gauges and thermometers  Metering devices  Solenoids  Temperature and pressure limit controls  Mercoids

Over-Pressurization 35 Proper Maintenance (cont’d)  Ensure Replacement Parts are “Replacement-In-Kind”  Pipe, fittings and components with same pressure rating  Valves with same pressure relief capabilities

Over-Pressurization 36 Management of Change  Follow established review procedures  Consider all modes of operations  For each process, ask “How can we have high pressure?”  Ensure proper pressure relief strategy for every process component

Over-Pressurization 37 High Pressure Valve Pressure Relief Device

Over-Pressurization 38 Portable Liquid Container Rupture Disk Pressure Relief Device

Over-Pressurization 39 Forklift Pressure Relief Device

Over-Pressurization 40 Dual Storage Tank Safety Valves Pressure Relief Device

Over-Pressurization 41 High Pressure Line Safety Pressure Relief Device

Over-Pressurization 42 Solenoid Shut-off Valve Pressure Relief Device

Over-Pressurization 43 Pressure / Temperature Switch Pressure Inlet to SensorTemperature Sensor

Over-Pressurization 44 Mercoid Switch

Over-Pressurization 45 High Pressure Shut-Off Switches Pressure Shut-off Switches

Over-Pressurization 46 Review Questions  Give examples of processes or pieces of equipment at your location which can present an over-pressurization hazard?  What are the causes of over-pressurization?  Liquefied gases can expand up to __________ times in volume from liquid to gas.

Over-Pressurization 47 Review Questions  Which is the most dangerous hazard, trapped liquid with or without vapour? Why?  What kinds of things can we do to protect from over-pressurization hazards?