Magnet Circuit performance at 6

Slides:



Advertisements
Similar presentations
6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
Advertisements

February 2009 Summary of Chamonix 09 Steve Myers.
New HV test specification for the LHC N. Catalan for the EI section.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
Expected Quench Levels of the Machine without Beam: Starting at 7 TeV ? P. Pugnat CERN, Geneva, Switzerland LHC Project Workshop Chamonix XV, Tuesday 24.
Quench-based magnet sorting at the MEB presented by L. Bottura Workshop on Beam generated heat deposition and quench levels for LHC magnets March 3 rd,
LMC 30 LPC A. Verweij, TE-MPE. 30 Sept 2009, LMC meeting 1.9 K, 0 T, 7.5 kA run Heat pulse.
A. Verweij, TE-MPE. 3 Feb 2009, LHC Performance Workshop – Chamonix 2009 Arjan Verweij TE-MPE - joint stability - what was wrong with the ‘old’ bus-bar.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
The diode lead resistance ‘issue’ A. Verweij, TE-MPE, CSCM workshop 7/10/2011 Contents:  Diode geometry  Measurements performed in the past  Measurements.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM
CSCM type test: Diode Leads and Diodes Gerard Willering & Vincent Roger TE-MSC With thanks to Bernhard Auchmann, Zinour Charifoulline, Scott Rowan, Arjan.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
MP3 List of main Issues during March 2010 MP3 - Team.
AT-MAS/SC A. Verweij 21 Mar 2003 Present Status and Trends of Cable Properties and Impact on FQ Workshop on Field Quality Steering of the Dipole Production.
E. Todesco PROTECTION FOR QXF E. Todesco CERN, Geneva Switzerland QXF protection meeting 28 th October 2013.
MPE activities within MP3 Arjan Verweij A. Verweij, MPE review, 2 June 2015 The questions: 1. Define the scope of work for your activity 2. Structure of.
E. Todesco MAGNET (RE)Training E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN LHC risk review, 5 th March 2009 Acknowledgements:
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
E. Todesco ENERGY OF THE LHC AFTER LONG SHUTDOWN 1 ( ) C. Lorin, E. Todesco and M. Bajko CERN, Geneva Switzerland With relevant inputs from colleagues.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
TE-MPE –EI, TE - MPE - TM 8/12/2011, Antonopoulou Evelina RQS circuit Simulation results Antonopoulou Evelina December 2011 Thanks to E. Ravaioli.
PGC tests Test procedure and acceptance criteria for the Powering of Group of Circuits EDMS No
2 nd BLMTWG meeting, B. Auchmann, O. Picha, with A. Lechner.
Session 8: What we will do for beam preparation in 2009 G. Arduini, R. Giachino 1Session 8 – Summary - GA24/02/2009.
E. Todesco QUENCH BEHAVIOUR TEAM ACTIVITIES E. Todesco for the QBT CERN, Geneva Switzerland CERN, 7 th January 2016 MSC Technical Meeting.
Quench behavior of the main dipole magnets in the LHC By Gerard Willering, TE-MSC On behalf of the MP3-CCC team Acknowledgements TE-MSC, MP3, BE-OP, TE-MPE,
E. Todesco RETRAINING AND DETRAINING IN THE LHC E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN LHC Machine Advisory.
CSCM Test description and Risk assessment  Goal  The typical and ultimate current cycle  Test sequence for type test and regular test  Risk assessment.
D1 and D2 powering and protection
S. Roesler (on behalf of DGS-RP)
SOME MORE STATISTICAL ANALYSIS OF TRAINING DATA
Review of the present non-conformities in view of HL-LHC
FiDeL: the model to predict the magnetic state of the LHC
E. Todesco for the QBT CERN, Geneva Switzerland
ANALYSIS OF THE PRODUCTION DATA AFTER THERMAL CYCLE SECOND PART
STATISTICAL SUMMARY AND INTERPRETATION OF THE TRAINING CAMPAIGNS
LHC Dipole Diode Insulation Consolidation Review (I) INTRODUCTION
Powering the LHC Magnets
MPE main activities planned for LS2
Recommissioning of sector 12 after a short warm-up during eYETS 2016/17 QBT, MP3 – May 2017 S. Le Naour.
Dipole diode lead resistance measurement
Dipole circuit & diode functioning
Consolidation of the dipole diode insulation Technical aspects
Powering from short circuit tests up to nominal
QUENCH BEHAVIOUR TEAM ACTIVITIES
Circuits description and requirements - Closed Session-
LS1 TE/MPE/EE CABLE ACTIVITIES
POSSIBLE SCENARIOS FOR TRAINING
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
5 TeV Settings Mike Lamont.
Andrzej Siemko (CERN) and Marco Zanetti (MIT)
Monday 08:30 – 11:00 Access for: LBDS beam 2 problems: TSU unit changed RQTD.A67B1: controller for the current lead heater changed RQS.A67B1 power converter.
MQY as Q5 in the HL LHC era Glyn Kirby MQY 001 bat 927.
Warm Magnet Thresholds
E. Todesco CERN, Geneva Switzerland
Review of hardware commissioning
Other arguments to train two sectors to 7 TeV
MBHSP109 and MBHSP May 2019, Gerard Willering.
Electrical measurements and diagnostics
Presentation transcript:

Magnet Circuit performance at 6 Magnet Circuit performance at 6.5 TeV… and beyond Arjan Verweij, TE-MPE-PE on behalf of the MP3 (cern.ch/MP3) acknowledgments to everybody involved in magnet reception tests, powering tests, and operation and analysis of the magnet circuits Mera peak, 6.5 km high Kun, 7 km high Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Outline Overview of the magnet circuits from an operational point of view, with focus on quenches, excluding issues presented by Felix (shorts, ELQA, ...), Reiner (QPS), and Bernhard (beam-induced quenches w.r.t. BLM thresholds). Feasibility of operation at 7 TeV, based on training behaviour of previous HWC campaigns. I will not discuss the origin/understanding of quenches, de-training, memory, etc; see website of QBT (Quench Behaviour Team). Useful links: cern.ch/MP3/SummaryIssues List of all issues cern.ch/MP3/QuenchDatabase Database of all training quenches Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Initial HWC. Target: 7 TeV (12 kA) Date Description 2007/8 Initial HWC. Target: 7 TeV (12 kA) Sept 2008 Accident in S34 Repair nQPS installed. Warm-up of S12, S34, S45, S56, S67 to 300 K. Warm-up of S23, S78 and S81 to 80 K. tRB reduced to 51 s, tRQ reduced to 9 s. 2009 HWC to 3.5 TeV (6 kA) Begin 2011 HWC after Xmas to 3.5 TeV Begin 2012 HWC after Xmas to 4 TeV (6.85 kA) Feb 2013 Powering tests to 7 TeV (except mains) 2013-2014 LS1. Warm-up of all sectors to 300 K. tRB back to 102 s, tRQ back to 30 s 9/2014-3/2015 HWC to 6.5 TeV (11.1 kA) Mar 2016 HWC after Xmas to 6.5 TeV Run1 Run 2 Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Global view of training quenches Nr. of magnets 2008 2009 Feb 2013 2014/5 60 A 752 2 3 23 80-120 A 1476 37 38 4 120 A triplet 40 1 600 A 6518 140 77 154 600 A triplet 56 26 14 IPD 18 13 10 IPQ 220 49 68 31 IT mains 32 RQ 794 RB 1232 (twin aperture) 30 (S56 to 11.2 kA) 175 (all sectors to 11.1 kA) Important: some commissioning currents and test sequences have been changed during the years, so the number of quenches cannot always be directly compared among HWC campaigns. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

60 A circuits Nr. of magnets 2008 2009 Feb 2013 2014/5 60 A 752 2 3 23 23 5 quenches in 5 different magnets Possibly not all quenches registered 23 quenches in 21 different magnets 2 quenches on flat-top (60 A) Other issues: 2 circuits condemned Small number of quenches considering large number of magnets, and all quenches well above the operational currents. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

80-120 A circuits Nr. of magnets 2008 2009 Feb 2013 2014/5 80-120 A 1476 37 38 4 22 120 A triplet 40 1 RCO 16x77=1232 Some retraining after thermal cycling. 3 out of 4 triplet quenches due to additional 5 A margin. Other issues: nominal current of 4 circuits reduced to 20-50 A 4 triplet circuits condemned Small number of quenches considering large number of magnets. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

600 A circuits Circuit # of magnets Magnet 2008 2009 Feb 2013 2014/5 RCD 16x77=1232 MCD 40 3 16 RCS 16x154=2464 MCS 15 8+1 ROD/F 332 MO 2 6+1 RQ6 48 MQTLH 5 RQS 64 MQS 6 8+2 RQT12/13 MQT 20 7 5+2 RQTD/F 32x8=256 21 35 39+13 RQTL7-11 72 MQTLI 29 17 23+4 RSD/F 688 MS 4 9+1 RSS MSS 1 RU MU 8 Significant retraining after LS1, especially for RQTD/F and RQTL circuits. Other issues: RSS.A34B1, RCS.A78B2 condemned. 9 circuits with less magnets. 35 circuits with reduced nominal current. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

600 A circuits - triplets Significant retraining after LS1. # of magnets Magnet 2008 2009 Feb 2013 2014/5 RQSX3 8 MQSX 1 16+2 RCBX * 48 MCBX 25 4 14 19 *: not including the quenches due to combined powering Significant retraining after LS1. Other issues: Combined MCBX H-V powering imposes some constraints 600 A circuits: Many circuits to be closely watched in upcoming HWC campaigns. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

IPD circuits Nr. of magnets 2008 2009 Feb 2013 2014/5 IPD 18 13 10 4 10 4 Nr. of magnets 2008 Feb 2013 2014/5 RD1 4 x MBX (1.9 K) 5800 A: 0 5450 A: 0 RD2 4 x MBRC (4.5 K) 4400 A: 0 4150 A: 0 6000 A: 7 6000 A: 0 5650 A: 0 RD3 4 x MBRS (4.5 K) 5860 A: 6 5860 A: 9 5550 A: 2 RD4 2 x MBRB (4.5 K) 6150 A: 0 6150 A: 1 5850 A: 2 RD4.L4 and RD4.R4 quenched once in 2014/5, within 100 A of nominal. Other issues: RD1.R8 operates with one quench heater. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

RD3.L4 Worrying in 2013 but trained quickly in 2014/5 (up to a reduced current of 5550 A). Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

IPQ circuits Other issues: # of magnets Magnet Temp [K] I_tr [A] 2008 Feb 2013 2014/5 RQ4 28 MQY 4.5 3610 9 7 3450 RQ5 16 1 8 RQ6 4 2 MQM 4310 17 23 4100 14 24 15 25 RQ7 36 1.9 5390 5250 3 RQ8 5100 RQ9 48 RQ10 Other issues: RQ9 and RQ10 frequently trip due to thunderstorms and other external pick-ups RQ8, RQ9, and RQ10 trip when the MB in positions A8, B8, A9, B9, A10 or B10 quenches. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Quench behaviour is closely monitored over time, see MP3 meeting dd 14/10/2015 (S. Le Naour). Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

IT-mains circuits Nr. of magnets 2008 2009 Feb 2013 2014/5 IT mains 32 4 2 3 x RQX.L2 (Q1) 1 x RQX.R2 (Q2) 1 x RQX.L8 (Q3) 1 x RQX.L5 (Q3) Other issues: One training quench during operation in RQX.L2 (Q1) at 6760 A Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

RQ circuits Nr. of magnets 2008 2009 Feb 2013 2014/5 RQ 794 2 10899 A (28R4) 11280 A (14R5) 10550 A (26L5) 10363 A (15L1) No training quenches during operation Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

RB circuits: Outline Reception acceptance tests in SM-18 (2002-2007) 1st cool-down 2nd cool-down HWC 2008: training of S56 to 11.2 kA HWC 2014/5: training of all sectors to 11.1 kA (6.5 TeV equiv.) Forecast for 7 TeV as presented by E. Todesco in MSC-TM (7 Jan 2016) and LMC (20 Jan 2016). Other issues: In 3 dipoles, a high-field quench heater is replaced by a low- field one. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Reception test (2002-2007) – 1st cool-down Cumulative plot of all quenches per firm, sorted by quench current Firm-1 Firm-3 Firm-2 Firm-1 Firm-2 Firm-3 All # magnets 400 420 412 1232 #Q to 12000 A 321 593 450 1364 #Q to 11080 A 47 183 413 Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Reception test (2002-2007), 2nd cool-down Firm-1 Firm-2 Firm-3 All # magnets 33 55 28 116 #Q to 12000 A 1st cool-down 73 140 77 290 2nd cool-down 11 34 15 60 #Q to 11850 A 54 119 67 240 6 21 10 37 #Q to 11080 A 4 30 68 1 3 8 4.8 x faster 6.5 x faster 8.5 x faster Magnets from all 3 firms show a good “memory” when tested a few weeks later, after a thermal cycle. Based on these data, the nr. of quenches to reach 7 TeV in the LHC was estimated to be about 160 (P. Xydi, A. Siemko, 2009). Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

HWC 2008 – S56 to 11.2 kA 30 quenches in 29 different magnets (2x Firm-2, 27x Firm-3). 19 out of 27 quench values are lower than the first quench during reception. One detraining quench. Firm-3 magnets clearly behave differently as compared to Firm-1 and Firm-2, and w.r.t. to expectations based on “memory” observed during 2nd cooldown of the reception tests. Based on a simple exponential fit, and weighting for large percentage of Firm-3 magnets in S56 (55%), reaching 10.98 kA (6.5 TeV) in 8 sectors was expected to require 84 training quenches, and about 30 more when adding a margin of 100 A. “…. one should expect about 1000 quenches to reach 7 TeV. This number is however very approximate and a better estimate can only be made after at least one sector has trained to 7 TeV.” (A. Verweij, Chamonix 2009) Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

LHC – 8 sectors (2015) 175 training quenches, quite a bit more than expected. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

LHC – 8 sectors (2015) Cumulative plot of all quenches per firm, sorted by quench current About 8x faster (as expected) Only 1.3x faster 6.5 TeV + margin Extrapolation to 7 TeV (12 kA) very tricky Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Some interesting observations S56: (containing 28 x Firm-1, 42 x Firm 2, 84 x Firm-3) 2008: 24 quenches to reach 11080 A (2 x Firm-2, 22 x Firm-3). 15 out of 22 quenched below the 1st quench during reception. 30 quenches to reach 11.2 kA. 2014/5: 16 quenches to reach 11080 A (all in Firm-3). 10 out of 16 quenched below the 1st quench during reception. 24 of the 27 Firm-3 magnets that quenched in 2008, did not quench again in 2014/5. All sectors: Nr of quenches Nr of different magnets that quenched at least once Cases for which the 1st quench during HWC is lower than the 1st quench during reception Firm-1 5 4 (80%) Firm-2 27 17 (63%) Firm-3 143 132 97 (73%) No clear correlation between training during reception and in the LHC. The average quench value of the “2nd and 3rd quenches” is 10828 A. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Conclusions on the observed training as presented by E Conclusions on the observed training as presented by E. Todesco (LMC, 20/1/2016) Differences in quench behaviour of the Firm-3 magnets along the production are statistically significant. (See also G. Willering, LMC, 8/4/2015) Quench data are compatible with a scenario where at each warm-up we start in the same condition as at the beginning of the previous training. Quench data of Firm-3 are compatible with a partial but small preservation of memory. Quench results in S56 (comparison 2008 with 2015/5) are compatible with magnets belonging to the same production (no bad or good magnets). No evidence of magnets to be removed in LS2. A good fraction of HWC data are compatible with Gaussian distribution for the first quench. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Required training to reach 7 TeV as presented by E Required training to reach 7 TeV as presented by E. Todesco (LMC, 20/1/2016) The upper bound for the number of “2nd quenches” is 150. Possible strategy: push S12 and S45 to 7 TeV before LS2. S12: to see the behaviour of the Firm-1 and Firm-2 magnets S45: to see possible “2nd quenches” in the Firm-3 magnets. These two sectors require the lower number of quenches, so maximising information while minimising risk. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Training quenches during operation in 2015 5 training quenches occurred at 10980 A, all in Firm-2 magnets (14/5, 11/6, 9/7, 19/9, 3/11) 1 May 2015 15 Dec 2015 Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Conclusions (operation at 6.5 TeV) HWC 2014/5: Reaching 6.5 TeV required a significant number of training quenches, mainly in some 600 A circuits, some MQM magnets, and in the RB circuits. Some magnets/circuits train slower than in previous campaigns. The QBT should look into these cases to assess the long-term behaviour. Operation 2015: Only a few training quenches were observed, showing that the additional current margins during HWC are correct. Powering tests March 2016: We will ramp all magnet circuits to the same values as during the campaign of 2014/5. We expect some quenches but this should not impact the planned duration of the tests. Some QPS thresholds will be reduced to be better protected in case of almost symmetric quenches in the high current circuits. The RB circuits will be cycled to 10980+100 A with a plateau of at least 4 hrs. Depending on the number of training quenches during operation, we might recommend to repeat such a test at regular intervals (e.g. before each TS). Operation 2016: We expect smooth operation of the magnet circuits. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Conclusions (towards 7.0 TeV) There is no indication that one or more high-current circuits could not be operated at 7 TeV, even though some magnets/circuits seem to train slower than in the past. Commissioning time to 7 TeV would be dominated by the MB training. Estimates by E. Todesco show that another 270 training quenches are needed plus an unknown number of second quenches for which an upper bound of 150 is given, plus an additional 170 if the training is preceded by a thermal cycle. A proper number for the entire machine can be given by training S12 and S45 to 7 TeV, which would require about 2 weeks. Training of all 8 sectors can be performed in parallel, with a rate of about 120- 160 quenches per week. Possibilities to speed up the time for commissioning should be looked at (see also presentation R. Schmidt). Each quench implies a certain risk (heater failure, inter-turn short, short-to- ground, pressure-related damage, etc), and a proper risk analysis should be performed before starting such a long training campaign. Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Annex Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Firm-3 quench behaviour along production Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016

Statistics on the LHC main dipole quench heater firing for 2014-2015 Since October 2014 (QPS-IST included): 2533 full charge firings in total about 1660 firings at zero current Since April 2015 (1st beam in the machine): 247 full charge firings in total about 175 firings at zero current B15R8 C14R8 A15R8 A21L5 B14L6 B8L4 A8L7 A10L7 A8L2 Arjan Verweij, LHC Performance Workshop, 25-28 Jan 2016