Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.

Slides:



Advertisements
Similar presentations
Chapter 10 Learning Objectives
Advertisements

ASM Phase II Real Time Dispatch and Reserve Constraint Penalty Factors rev2.0 NEPOOL Markets Committee June 28/29, 2005 Jim Milligan ISO-NE Markets Development.
Historical Hydro-Quebec Phase II Flow and Transfer Capability Limit Data Peter Wong, ISO New England Power Supply Planning Committee Meeting June 4, 2007.
Copyright © 2002 Pearson Education, Inc. Slide 1.
Copyright © 2002 Pearson Education, Inc. Slide 1.
Part 3 Probabilistic Decision Models
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
Results and Implications of the First Forward Capacity Market Auction National Town Meeting on Demand Response June 3, 2008 Henry Yoshimura Director, Demand.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
ISO New England Demand Resource Measurement & Verification Standards Manual Overview April 11, 2007 NAESB Development of DSM/EE Business Practices Washington,
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 5 second questions
INVENTORY AND OVERHEAD
Slides prepared by JOHN LOUCKS St. Edward’s University.
Reliability McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Effective Rate of Protection
SPP-Entergy Market Power Analysis Presented By: David B. Patton, Ph.D. President, Potomac Economics September 16, 2008.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Update on Demand Resource Participation in New Englands Forward Capacity Market Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
© 2013 Day Pitney LLP Overview and Update on the Ever-Evolving New England Wholesale Capacity Market presentation to Boston Bar Association May 23, 2013.
Summary of Proposed Market Rules For Transition Period Price-Responsive Demand and Active Demand Resources in the Forward Capacity Market Henry Yoshimura,
Highlights of the 2003 New York ISO State of the Market Report David B. Patton, Ph.D. Potomac Economics Independent Market Advisor April 14, 2004.
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
Chapter 11 AC Power Analysis
DRAFT Installed Capacity Requirement (ICR) and Related Values for the 2014/15 Forward Capacity Auction (FCA5) Maria Agustin.
Capacity Planning For Products and Services
DECEMBER 17, 2013 | WESTBOROUGH, MA Reliability Committee & Transmission Committee & Markets Committee Capacity Zone Modeling Al McBride MANAGER, AREA.
Hydro Peaking Capacity Analysis & Northwest Regional Forecast Comparison Resource Adequacy Technical Committee July 28, 2010.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Legal Framework, Investment Opportunities and Technical Innovation in the Electricity Sector Security of Supply through competitive markets: Design of.
Copyright © Cengage Learning. All rights reserved. OPTIMIZING LOT SIZE AND HARVEST SIZE 3.5.
7. PV System Sizing Herb Wade Consultant
Copyright © 2013, 2009, 2006 Pearson Education, Inc.
Copyright © 2013 The Brattle Group, Inc. ISO-NE Offer Review Trigger Prices 2013 Study Final Results NEPOOL Markets Committee Sam Newell September 10,
Study Results Common Case Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of the 2022 Common Case.
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
SEPTEMBER 12, 2012 | MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Hourly Offer and Intraday.
SSG-WI System Model Data Requirements [PART 1] September 5, 2002 Las Vegas, NV.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
Congestion Management Settlement Credits December, 2002.
Taina Wilhelms 1 ENERGY YEAR 2010 Finnish Energy Industries
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Making Clean Local Energy Accessible Now December 16, 2013 Flattening the Duck Dynamic Grid Solutions for Integrating Renewables.
Out of Region Market Assumptions Resource Adequacy Technical Committee April 6 th, 2011.
Energy Year 2014 Electricity Finnish Energy Industries.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Load Data for Vermont Docket 7081 workshop 9/30/05.
Distributed Generation/Demand Resources in ISO New England’s Wholesale Markets 2nd Annual Distributed Energy Conference - Building Resilient Communities.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Draft 2013 Energy-Efficiency Forecast
New England Resource Adequacy
Alternative ICAP Proposal
Presentation transcript:

Demand Resource Operable Capacity Analysis – Assumptions for FCA 5

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Assumptions The analysis uses assumptions based upon –Purchasing the required amount of Installed Capacity Requirement (ICR) for the System Wide study –A set of Transmission Security Analysis values developed by System Planning for the Load Zone studies 2

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Total Resources New England Analysis –1. Total Capacity: The capacity value is the Representative Future Net ICR of 32,672 MW for 2014/15 calculated for use in the 2010 Regional System Plan and other planning studies Load Zone Analysis –1. Minimum Capacity Requirement from TSA: This capacity value is the minimum amount of resources that are necessary according to a Transmission Security Analysis (TSA) performed for each Load Zone Maine Load Zone uses the Maximum Capacity Limits 3

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Total Resources (cont.) Load Zone Generation –Amount of generation that is accounted for in each load zone for the purpose of the DR Op Cap analysis Maximum adequacy requirement: Maximum Capacity Limit (MCL) –This value was used for Maine in the analysis due to export constraints Minimum generation requirement from TSA –Amount of generation that is required in an area in order to secure the system for N-1-1 conditions –Was determined for each zone based on a TSA and consistently with PP-10 criteria The Load Zone results do not represent a simultaneous feasibility between load zones. Each Load Zone analysis is completed independently of the other 4

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Import Capacity New England Analysis –2. Net of Non-ICAP Purchases & Sales: value assumed is the average of the ICAP Transaction Summary monthly average for HQ Phase I/II used as a proxy for import capacity. The monthly average is assumed for all hours 2010 data was not used to compute the average since the ending of the ICAP transition period would have significantly biased the data Load Zone Analysis –2. Import Capability (N-1) (See Next Slide) All values are rounded to the nearest 50 MW 5

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Import Capability (cont.) Import Capability for Load Zone Analysis –For zones that closely reflect electric boundaries defined in the Regional System Plan (RSP), RSP import limits were used Connecticut and Northeast Massachusetts –For zones that do not closely reflect electric boundaries defined in the RSP, import limits were determined for the purpose of the DR Op Cap analysis only Maine, New-Hampshire, Vermont, Rhode-Island, Southeast Massachusetts and Western and Central Massachusetts These import limits were strictly based on thermal, N-1 constraints –All elements at 115kV and above were monitored –All single-element contingencies and multiple-element contingencies as described in OP-19 Section II.A.2 were considered These import limits were determined using SIEMENS/PTI/MUST –MW from remote generation outside the zone were transferred to all generation inside the zone Resulted in one standard number for each zone –No detailed sensitivities were performed to assess the range of all potential import limits –Studies represent all lines in conditions 6

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Demand Resources New England & Load Zone Analyses –3. Total Demand Resources: Three scenarios are used: Low DR, Intermediate DR and High DR clearing and are developed as  Low – 100% of Existing DR capacity which qualified for FCA 4 (2013/14 CCP)  Intermediate – Low DR scenario plus 50% of the New DR capacity which qualified for FCA 4 (2013/2014)  High – Low DR scenario plus 100% of the New DR capacity which qualified for FCA 4 (2013/2014) –The Total Demand Resources are the Cleared/Qualified capacity values without the Reserve Margin Gross-up which is the Demand Reduction Value * Transmission & Distribution Gross-up (8%) –Real-Time Emergency Generator DR are limited to the 600 MW amount that will be purchased to meet the ICR and Load Zones are prorated to sum to the New England value 7

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Total Demand Resources Scenarios - Demand Reduction Value (MW) 8

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Total Capacity Without Demand Resources New England Analysis –4. Total Capacity Without Demand Resources : Total Capacity + Net of Non-ICAP Purchases & Sales – Total Demand Resources [1+2-3] Load Zone Analysis –4. Total Capacity Without Demand Resources : Minimum Capacity Requirement from TSA (or MCL for ME) + Import Capability (N-1) – Total Demand Resources [1+2-3] 9

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. 10 Assumed Generation Maintenance & Assumed Unplanned Outages New England Analysis –5. Assumed Generation Maintenance: monthly average of the weekly values from the Annual Maintenance Schedules (AMS) –6. Assumed Unplanned Generation Outages: monthly average of the weekly Allowance for Unplanned Outages from the AMS Operable Capacity Analysis Load Zone Analysis –5. Assumed Generation Maintenance: prorated New England value based on the Capacity Requirement from TSA (or ME MCL)/New England Qualified Capacity –6. Assumed Unplanned Generation Outages : prorated New England value based on Capacity Requirement from TSA (or ME MCL)/New England Qualified Capacity

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Hourly Forecasted Peak Load New England & Load Zone Analyses –8. Forecasted Peak Load: (Monthly peak shown in table) –The summer & winter peak loads are from the 2010 CELT Forecast for 2014/2015 –An hourly profile is produced based on the 2002 load shapes for New England and for each of the Load Zones –2002 was chosen because the summer period had several days in the range of the summer peak (represents typical summer weather) –Resulting 2014/15 monthly peaks may be different than the 2010 CELT forecast of monthly peaks because they were developed using the 2002 load shape 11

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. 12 New England & Load Zone Analysis –7. Gen Resources Available to Meet Load & OR = Total Capacity Without Demand Resources – Assumed Generation Maintenance – Assumed Unplanned Generation Outages [4-5-6] Generating Resources Available to Meet Load & OR

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Hourly Forecasted Peak Load for August 2012 New England & Load Zone Analyses –8. Forecasted Peak Load: (Monthly peak shown in table) –The summer 2010 CELT Load Forecast for August 2014 was used to create an hourly load profile and a Operable Capacity analysis was performed with all other assumptions remaining the same 13

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Operating Reserve Requirement New England Analysis –9. Operating Reserve Requirement: assumed to be 1 times the largest contingency and ½ times the second largest contingency. The value is assumed to be 2000 MW for this analysis Load Zone Analysis –9. Operating Reserve Requirement: assumed to be the largest contingency in the Load Zone Consistent with the Transmission Security Analysis assumptions 14

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Passive Resources New England & Load Zone Analyses –10. Passive Demand Resources: These energy efficiency type of resources are assumed as already in-service and therefore subtracted from the Load Forecast for each hour –A monthly ratio was developed by the ISO Demand Resource group which assumes a lower reduction value for Passive Resources in shoulder months –Equals DRV of Passive DR * T&D Gross-up –11. Peak Load & OR – Passive DR: = Forecasted Peak Load + Operating Reserves – Passive DR [8+9-10] 15

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Surplus/Deficiency Before Calling Active DR New England & Load Zone Analyses –12. Surplus/Deficiency Before Calling DR: assumed to be the amount of MW need before calling Active DR and/or OP 4 (if needed) –Calculated from Gen Resources Available to Meet Load & OR (Line 7) – [Peak Load + OR – Passive Resources] (Line 11) –Negative value shows need for Active Demand Resources 16

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Description of DR Op Cap Results All MW of DR is the DRV with the 8% T&D Gross-up 13. Maximum MW of Non-RTEG Active DR Available: MW of Real-Time DR available for each scenario 14. Maximum MW of Non-RTEG Active DR Needed: MW of Real-Time DR that would be called in any month with a need for DR as show in line Maximum MW of RTEG Active DR Available: MW of RTEG available for each scenario 16. Maximum MW of RTEG Active DR Needed: MW of RTEG that would be required once the entire supply of non-RTEG is called in any hour with a need for DR as show in line 12 (not limited to 600 MW) 17. Additional MW of OP 4: remaining deficiency, if any, once all Active DR have been called 18. Average MW Amount of DR Need: monthly average of any hours when DR is needed 17

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Description of DR Op Cap Results (cont.) 19. # of Hours Load + OR – Passive DR above Available Resources: Sum of the number of hours each month when at least 1 MW of DR would be needed 20. Corresponding # of Days: Sum of the days for each month when at least 1 hour of DR is needed 21. Maximum # of Consecutive Days: Maximum number of consecutive days when DR would be needed per month 18

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. Description of DR Op Cap Results (cont.) 22. Number of Calls per MW of Non-RTEG Active DR: Calculated as the peak of each day’s DR need divided by the total MW of non- RTEG Active DR. For example, if there is 1000 MW of DR need and 500 MW of available non-RTEG Active DR, then on that day, the non-RTEG Active DR would be called 1.0 times 23. Number of Calls per MW of RTEG: Once all MW of non-RTEG Active DR is called, if there is still any remaining need, this value is calculated as the peak hour of remaining need divided by the total MW of RTEG 19

2014/15 Demand Resource Operable Capacity Analysis © 2010 ISO New England Inc. 20 Questions?