LUXE: organisational aspects

Slides:



Advertisements
Similar presentations
TAU Update MPI Munich meeting 17/10/2006 Luminosity Detector R&D Tel Aviv University Halina Abramowicz, Ronen Ingbir, Sergey Kananov, Aharon Levy, Iftach.
Advertisements

Schedule Remove ARGUS experiment - Fall 2009 Disassemble and ship OLYMPUS detector - Spring 2010 Ship target and beamline – Fall 2010 Modify DORIS beam-line.
July 7, 2008SLAC Annual Program ReviewPage 1 Particle Astrophysics and Cosmology Theoretical Research Overview R. Blandford KIPAC Director, PPA Assistant.
Richard Milner April 22, Internal Target Experiment at DORIS Proposal of a new experiment at DORIS using the available MIT-BLAST detector and.
Welcome to ECT*. What is ? A European Center… Established in 1993 « bottom up » realization, supported by a broad community (ECT* associates) Strong.
NLC - The Next Linear Collider Project Sheppard/Pitthan July 14, 2015 POWER Meeting June 8=9,2002 Durham, England POWER Meeting June 8=9,2002 Durham, England.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
Missouri S&T Provost’s eFellows Program Meg Brady, Director S&T Educational Technology March 15, 2012.
CREATE Collaborative Research and Training Experience Program Information Session January 16th 2012.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
Friday, April 29, /29/2011Aharon Levy, PRC71 (closed)1.
ECFA European Committee for Future Accelerators Report from the chairman M. Krammer HEPHY, Vienna, Austria July 24, 2014RECFA DESY1.
GLAST Science Support Center June 21, 2007 Getting Involved with GLAST GLAST Guest Investigator Program David Band, GSSC CRESST/GSFC/UMBC.
26 Jan 2010Paul Dauncey1 TPAC papers Paul Dauncey.
Nuclear Structure/Direct Reactions Experiments …became a broader discussion about how to initiate collaborations.
30 April 2014FCC-ee Physics Coordination meeting1 FCC-- ee coordination meeting 12 Nov 2015 Brief news.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
ARW 2013 Opening Melbourne, Australia, 15 April 2013 Dr Mark Boland Principal Scientist Accelerator Physics Australian Synchrotron ACAS Deputy Director.
4/28/2005 DIS05, Diff. WG, Aharon Levy 1 Pomeron structure and diffractive parton distributions Aharon Levy with Halina Abramowicz and Michael Groys (MSc.
Work Summary since the last meeting Hywel Owen School of Physics and Astronomy University of Manchester.
X. Zheng, July 22-23, 2008, Hall A Parity Collaboration Meeting Xiaochao Zheng University of Virginia July 22-23, 2008 Overview of the experiment, schedule.
SFT Group Meeting March 30 th, SFT Group News Pere Mato 2. Highlights from the ROOT workshopRene Brun 3. From Applications to Appliances Predrag.
Primary PGCE Induction Day
Court Schedule 2017 / 2018 Sunday, am to 1pm
Budget Planning and Development
PH Department News Discussion with management
CATECHISM CALENDAR 2017 TERM 1 – 21 JAN – 11 MAR
Common questions and queries
New idea for the target detector: SuperFGD
Writing Skills Application Materials Workshop Hiring Committee Reports.
2016 ARC Linkage Projects Grant Writing Workshop Hosted by the Research Services Office Dr Gayle Morris Director, Research Services.
M.Jonker CTC MPO-WG status
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Scheduling Workshop This presentation will cover:
Lucie Linssen, CERN CLICdp meeting, May 15th 2017
Campus Shared Areas Management Company
FSUN – Payroll Accounting May 11, 2016
Implementation of MASH
IEEE Transactions on Evolutionary Computation Status Report
Average Monthly Temperature and Rainfall
ABT & Frequency.

Thank you for joining. This presentation will begin shortly.
ECO day Thursday 1st November

25th Avenue Grade Separation
LCLS Injector Commissioning Dates ( )
25th Avenue Grade Separation
NAFSA Region V 2018 Wisconsin Meeting
Does my line manager support my application?
        CALCULATING THE MATURITY DATE 1 2 CALCULATING INTEREST
Welcome to “Vietnam School on Neutrino”! Presented by Yuichi Oyama

Welcome to ECT*.
Next Steps / Ongoing Collaboration
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
Summer Conference Madness Has Begun !
Imaging & Engineering STAP Meeting 12th-13th of April 2018
CATECHISM CALENDAR 2017 TERM 1 – 21 JAN – 11 MAR
Everyone has the opportunity to learn and enjoy swimming & water based fitness activities for health and fun throughout their life time.
ENG 1D1 Friday May 29th, 2015.
Port Back Data Collection & Transition
IT Managed Services Transition Weekly Activity Report: June 11th, 2019
Port Back Data Collection & Transition

Laser Und XFEL.EU Experiment
SR Update for JLEIC June 8, 2017
SUN MON TUES WED THUR FRI SAT JAN Auditions 19 Callbacks 20
Brighton & Hove, East Sussex
Presentation transcript:

LUXE: organisational aspects Beate Heinemann (DESY and Univ. Freiburg) Dec. 7th 2017

DSF Proposal Very strong support from XFEL directorate Stated time commitments: Beate: 25% (detectors) Andreas: 10% (theory) Anthony: 30% (theory) Matthew: 30% (detectors) Jenny: 10-20% (detectors) Evgeni: 20% (beam line) Have received positive confirmation that DSF proposal successful! Money starting Jan. 1st 2018 Need to hire postdoc ASAP

Meetings Workshop next summer at DESY (2 days?) Possible dates: May 28/29, May 31/June1, June 18/19, June 21/22, June 27-29, Aug. 8-10, Aug. 13-17, Aug. 20-23 Goals: Gather theorists to explore/elaborate physics case Could have one additional “theory only” day if needed? Gather experimentalists to discuss feasibility and gauge interest, e.g. David Reiss (SLAC) and Thomas Koffas (Carleton) from original E144 experiment Halina Abramowicz and Aharon Levi from Tel Aviv University …? Discuss time scales, for proto-collaboration to write “Letter of intent”? Start regular monthly meetings now E.g. Thursdays 10-12? Or make doodle each time?

Work areas The following areas seem natural Theoretical calculations Beamline simulation Detector simulation Laser

Miscellaneous Meeting with XFEL director tomorrow afternoon Need to find out planned shutdowns to have target for installation date(s) Need to hire postdoc for simulation asap Am looking at DESY fellow pool. If no adequate candidate have to post the job Any good candidates anyone knows? (Ideally have knowledge of beam transport and/or Geant4) Laser seems to be most difficult and expensive part See Ingmar’s talk