BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
بسم الله الرحمن الرحیم MODULATOR & POWER SUPPLY FOR HIGH POWER MICROWAVE TUBE IN LINAC ACCELERATOR.
Progress and Plan for Superconducting RF Cavity RF Group.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
ANNEX. WP 1.04, Michael Ebert2MAC PETRA-III Review Meeting, DESY,29th November 2006 Sandblasted Center Conductor of a Cavity Input Coupler R a =
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
Anders Sunesson RF Group ESS Accelerator Division
Low-Level RF of BEPCII Sun YI IMAC’07 May. 11, 2007 IHEP.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Michał Matusiak Sławomir Wronka
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
650 MHz Solid State RF Power development at RRCAT
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
ALBA RF Systems Francis Perez.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.
Operation Status of the RF Systems and Taiwan Photon Source
Status of the ELETTRA RF Plants
Areal RF Station A. Vardanyan
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
RF cell Anders Sunesson RF group leader
Solid State Amplifier Development at PSI
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
MICE RF System Power Supplies, Control and Monitoring Status report
Construction and Commissioning of Electronic Test Benches
RF interlocks for higher intensities (LMC 15 June)
352MHz Klystron Control for the 3MeV Linac test stand
Replacement of coupler and recovery of cavity for BEPCII
WP Coordinaten XFEL RF Operation
RF Power for C75 - Resources
CEPC RF Power Sources System
RF Power for C75 - Resources
RF Local Protection System
FAIR pLinac RFQ Meeting pLinac RF Power Sources
RF systems introduction
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
Cavity Degradation Experience at S1-Global
The 9th Collaboration Meeting
RF introduction Anders Sunesson RF group leader
Status and New Developments of ALBA RF Systems
Presentation transcript:

BEPCII RF POWER SOURCE AND INPUT COUPLER RF group, IHEP

CONTEXT 1.two transmitter’s status(both finished) 2.two interlock systems for cavities(build east and rebuild west) 3. high power aging for waveguide (east and west) 4. power aging for input coupler 5.some problems solved (isolation transformer and ion pump supply) 6.stable RF power for beam commissioning

2004 Sep ~ 2005. April 1. finished installing ,commissioning and SAT (Site Acceptance Test) for 1st transmitter . 2.finished installing and commissioning for 1st circulator .

2005 Nov ~ 2006. April 1.We finished installing ,commissioning and SAT (Site Acceptance Test) for 2nd transmitter . 2.We finished installing and commissioning for 2nd circulator .

The 1st transmitter’s Picture

The 2nd transmitter’s Picture

The Interlock System for east cavity We built a new interlock system with the 2nd transmitter interlock system for the temperature ,pressure, water flow and so on for the east superconducting cavity. We also set up some interlock signals from LLRF and some remote control signals for network.

The east hall Interlock cabinet

The interface module for certain remote control signal

The Interlock System for west cavity We rebuilt the Interlock system for the west superconducting cavity and made the signal cables and wires for the better interlock layout and functions.

The Interlock System for west cavity before now

high power waveguide aging In July, 2006,we did the high power waveguide aging for the waveguide from the 2nd klystron to cavity. In Augest, 2006,we did the high power waveguide aging for the waveguide from the 1st klystron to cavity. The aging power from 0 to 200kW with full reflectin.

waveguide aging 2nd transmitter 1st transmitter

input coupler power aging Input coupler power aging for the 1st and the 2nd superconducting cavity. The aging power from 0 to150kW at normal temperature. Bias voltage for coupler power aging is from -2kV to +2kV,every 0.2kV one point.

input coupler power aging curve

Number of trips with Power (without DC bias voltage)

Bias voltage coupler power aging From -2kV to 2kV Every 0.2kV one point Some gas out point on different bias voltage different Power

Coupler power aging working picture

some problems from transmitter 1.we succeed to solve the isolation transformer failed for the 1st transmitter which caused the cavity high voltage failed . 2.we found some unstable signals from klystron ion pump power supplies which often caused RF trips .We have taken lot of tries and be doing some tests to avoid the IPS trips.

stable RF power for beam commissioning The RF transmitters have operated for almost 6 months until now ,almost continuous stable RF power for superconducting cavity and good interlock system to protect the cavity. It makes good condition for the BEPCII beam commissioning.

stable RF power for beam commissioning In the future ,we will make the RF transmitter more stable for the long time operation. We will make the control interface easier to use and able to be remotely controllable and intelligent.