Antti Piirto 12.9.2014 The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Advanced Piloting Cruise Plot.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
UNITED NATIONS Shipment Details Report – January 2006.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
New Nuclear Plants in the United States
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck 1 Golfech nuclear power plant New system to put and extract the fuel assembly.
S.Thomas College Gurutalawa OLD BOYS ASSOCIATION 2008/09 JUNIOR DORMITORY TOILET PROJECT.
Spring 2008, King Saud University Cash Flow Analysis Dr. Khalid Al-Gahtani 1 Payment schedule Materials Mobilization Monthly payments Final Payment Contract.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
1 ENERGY Gr. 5 Science: Conservation of Energy & Resources BY Full Name Science Unit PowerPoint Outline by Miss Berndl 2009.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
1 Technical Meeting on Managing the Development of a National Infrastructure for Nuclear Power SECURITY STATUS IN CHILE Mauricio Lichtemberg Chilean Nuclear.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
By Rasmussen College. 1. What majors or programs do you offer? 2. What is the average length of your programs? 3. What percentage of your students graduate?
CpSc 3220 Designing a Database
Westinghouse Non-Proprietary Class 3© 2013 Westinghouse Electric Company LLC. All Rights Reserved. 1 October 2013 Westinghouse Overview and AP1000 ® Plant.
Presentation transcript:

Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and World Energy Safety”

Antti Piirto Olkiluoto 3 project status

Antti Piirto

Antti Piirto Focal operating areas in 2008:  Preparation and review of design documentation and approval procedure: continues in full extent over to 2009, turbine island documentation to be completed in the autumn  Fabrication: major part of main components to be completed and the key components to be shipped to Olkiluoto during Fabrication of auxiliary equipment continues actively throughout the year Progress of work at OL3

Antti Piirto Focal operating areas in 2008:  Construction: work to continue at reactor plant over to Turbine building about to be completed, other turbine island buildings will be completed in the autumn  Installation work: installation work in turbine island to be completed to a large extent by the end of the year, installation work has started in the reactor island, work intensity will increase during the year Progress of work at OL3

Antti Piirto  No safety, quality or (major) technical non- conformities  Refabrication of reactor coolant piping continues, five new pipes have been completed with approvable results. Two more pipes will be completed during the summer, and the last one in the autumn Conformity / Quality assurance

Antti Piirto  Refabrication of four so-called cross-over pipe sections (bent reactor coolant piping) continues according to plans  Rework on generator water cooling system has been completed with approvable results. Factory acceptance tests about to start Conformity / Quality assurance

Antti Piirto  General site occupational safety index has remained at a good level  One fatal injury on the site in September 2007 Occupational safety

Antti Piirto Occupational Safety Index

Antti Piirto  More than 1900 direct subcontractors from 28 countries (about 40% from Finland)  Manpower on site about 3100  Polish workers constitute the largest group with 40%, followed by Finnish with 26%, German with 13%, French with 5%, Slovakian with 4%, Estonian with 3% Manpower

Antti Piirto  Manpower in construction work has reached its maximum, the share of installation work is on the increase, the number of electrical installation crew will also grow after summer 2008  All major work on the site carried out in shifts  Recruiting of operation and maintenance personnel under way, for example shift supervisors and licensed operators Manpower

Antti Piirto  The present delay is approximately two years  Cold tests at turbine plant to start at the beginning of 2009  Turbine plant ready to a great extent in summer 2009 OL3 Schedule

Antti Piirto  More than technical documents submitted to TVO for review, examination and approval  Submittal of further documentation to continue over to 2009  Contracts concluded for all key deliveries  All large components of reactor island in manufacture, final tests about to start (e.g. reactor pressure vessel will be shipped to Finland in late autumn) Equipment and Component Fabrication

Antti Piirto  Turbines have been completed, last inspections under way. Generator factory acceptance tests start this month  All but one steel liner ring sections have been produced. The fabrication of the dome section nearing completion. Liner sections 4+5 were erected in the reactor building at the beginning of May  Large moisture separators / reheaters have been shipped to the site Equipment and Component Fabrication

Antti Piirto  Reactor plant level has been poured. The first internal form of the reactor pool has been erected in place  Second pouring section in the external wall of the containment has been completed. External wall stands now at level + 27 m and internal wall at level + 10 m  Work continues in auxiliary and other buildings  Approximately 127,000 m3 of concrete poured so far Construction

Antti Piirto February 2008April 2008 Construction of the Reactor Building

Antti Piirto

Antti Piirto The First Internal Form of the Reactor pool

Antti Piirto  First containers installed in reactor building  Installation of condenser completed  Preheaters, main condensate pumps, some containers, other pumps and low-pressure piping installed in turbine building  Installation of cable trays as well as lighting and ventilation systems continues in switchgear building Installation

Antti Piirto  Large moisture separators / reheaters delivered to site, installation in the turbine building takes place in May  Overhead bridge crane now in operation in the turbine building Installation

Antti Piirto Main Steam Valves

Antti Piirto

Antti Piirto

Antti Piirto OL3 status May 2008  Focus on construction in the reactor plant  Focus shifted to installation in the turbine plant  Deliveries of large components to site have continued  Training of operating personnel continues  Commercial operation of plant unit to start in 2011

Antti Piirto What is different from OL1 / OL2 projects?  Finnish Nuclear Safety requirements and European utility requirements vs. US Reg. guides  New regulatory reguirements related to severe reactor accidents and airplain crash  Strict Regulatory control  Number of subcontractors very high -> project management and quality control more demanding  No strikes