Stephen McCann, Siemens Roke Manor

Slides:



Advertisements
Similar presentations
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Advertisements

Doc.: IEEE /864r0 Submission November 2003 Clint Chaplin, Symbol TechnologiesSlide 1 SG Operating Rules Anybody can vote, present, and make motions.
Doc.: IEEE /1424r1 Submission Nov 14-19, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Antonio, Texas, Nov 14-19, 2004.
Session Overview November , 2003 Jerry Upton- Chair Gang Wu – Procedural Vice Chair Eshwar Pittampalli – Liaison Vice.
Doc.: IEEE /0755r1 Submission July 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Portland, Oregon, July 12-16, 2004.
C /27 May 15, 2006Chair, IEEE Opening May 2006 Plenary Session #20 Jerry Upton- Chair Doug Knisely – Procedural.
Opening Plenary Presentation Session #4 Gary Robinson – Chair Mark Klerer – Jerry Upton Vice-Chairs IEEE /14.
Doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Francisco, California, July 18.
January 17, 2005Chair, IEEE Opening January 2005 Plenary Session #12 Jerry Upton- Chair Gang Wu – Procedural.
Doc.: IEEE /0755r0 Submission July 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Portland, Oregon, July 12-16, 2004.
Doc.: IEEE /024r1 Submission Jan 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Vancouver, Canada, Jan 12-16, 2004.
Doc.: IEEE /0661r0 Submission November 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /161r0 Submission January 2004 Al Petrick, IceFyre Semiconductor Slide WG Technical Editor’s Report January 2004 Interim Meeting.
IEEE s: ESS Mesh Networking Task Group
Siemens, Roke Manor (Recording Secretary )
802.11k Albuquerque Agendas Richard Paine
802.11k Orlando Agendas Richard Paine
IEEE r: Fast BSS Transition TG
IEEE r: Fast BSS Transition TG
Submission Title: [WG-TG3b Meeting Report Sept04]
802.11k Singapore Agendas Richard Paine
IEEE s: ESS Mesh Networking Task Group
Instructions for the WG Chair
平成30年11月 doc.: IEEE /424r1 January 2006
Stephen McCann, Siemens Roke Manor
Stephen McCann, Siemens Roke Manor
IEEE s: ESS Mesh Networking Task Group
IEEE ESS Mesh Study Group
WNG SC Committee Report IEEE , Berlin, Germany, Sep 13-17, 2004
APF Study Group Agenda September 13, 2004 September 2004
平成30年12月 doc.: IEEE /424r1 September 2006
Bruce Kraemer, Intersil (Vice-chair)
WAVE Opening Report September /1068 r0
Siemens, Roke Manor (Recording Secretary )
平成31年2月 doc.: IEEE /424r1 January 2007
IEEE s: ESS Mesh Networking Task Group
TGu Agenda Date: Authors: January 2007 January 2007
TGu Ad Hoc Agenda Date: Authors: February 2007
TGu Agenda Date: Authors: March 2006 March 2006
Siemens, Roke Manor (Recording Secretary )
TGu Agenda Date: Authors: January 2006 January 2006
TGu Agenda Date: Authors: November 2005 November 2005
WNG SC Opening Report IEEE , DFW, Texas Mar 9-14, 2003
doc.: IEEE /479r0 Mika Kasslin TGh chair
TGu Ad Hoc Agenda Date: Authors: February 2007
IEEE r: Fast BSS Transition TG Agenda
Submission Title: [WG-TG3b Meeting Report Sept04]
IEEE ESS Mesh Study Group
TGu Agenda Date: Authors: May 2005 May 2005
Doc.: IEEE /423r1 July 2001 Mar 15-19, 2004 WNG SC Committee Report IEEE , Orlando, Florida, March 15-19, 2004 TK Tan, Philips (Chair)
TGu Agenda Date: Authors: March 2007 March 2007
Siemens, Roke Manor (Recording Secretary )
802.11p WAVE Opening and Agenda November p
TGu Agenda Date: Authors: March 2006 March 2006
TGu Agenda Date: Authors: March 2006 March 2006
Stephen McCann, Siemens Roke Manor
Stephen McCann, Siemens Roke Manor
TGu Agenda Date: Authors: January 2006 January 2006
IEEE ESS Mesh Study Group
TGu Agenda Date: Authors: January 2007 January 2007
TGu Agenda Date: Authors: March 2006 March 2006
Doc.: IEEE /423r1 July 2001 Mar 15-19, 2004 WNG SC Committee Report IEEE , Orlando, Florida, March 15-19, 2004 TK Tan, Philips (Chair)
TGu Agenda Date: Authors: May 2006 May 2006
Stephen McCann (Chair)
Stephen McCann, Siemens Roke Manor
TGu Agenda Date: Authors: November 2005 November 2005
TGu Agenda Date: Authors: May 2005 May 2005
IEEE r: Fast BSS Transition TG
IEEE s: ESS Mesh Task Group
802.11m Report November 2003 Month 1998 doc.: IEEE /xxx
Presentation transcript:

Stephen McCann, Siemens Roke Manor September 2004 IEEE 802.11 Wireless Interworking with External Networks (WIEN) Study Group Berlin 13 September 2004 Stephen McCann, Siemens Roke Manor stephen.mccann@roke.co.uk Stephen McCann, Siemens Roke Manor

13 September 2004, 8am – 10am Call to Order Month 2002 doc.: IEEE 802.11-02/xxxr0 September 2004 13 September 2004, 8am – 10am Call to Order Sign in sheet & attendance Secretary Review IEEE 802 and 802.11 Policies and Procedures Intellectual Property Voting All Registered Meeting Attendees May Vote All Main Motions require 75% Attendance Study Group Attendance List On-line Attendance reminder Stephen McCann, Siemens Roke Manor John Doe, His Company

IEEE-SA Standards Board Bylaws on Patents in Standards Month 2002 doc.: IEEE 802.11-02/xxxr0 September 2004 IEEE-SA Standards Board Bylaws on Patents in Standards IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. Approved by IEEE-SA Standards Board – December 2002 Stephen McCann, Siemens Roke Manor John Doe, His Company

Inappropriate Topics for IEEE WG Meetings Month 2002 doc.: IEEE 802.11-02/xxxr0 September 2004 Inappropriate Topics for IEEE WG Meetings Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at patcom@ieee.org Approved by IEEE-SA Standards Board – December 2002 Stephen McCann, Siemens Roke Manor John Doe, His Company

Study Groups Function Formation September 2004 Study Groups Function The function of a Study Group (SG) is to complete a defined task with specific output and in a specific time frame. Once this task is complete, the function of the SG is complete and its charter expires.   The normal function of a SG is to draft a complete PAR and five criteria (see subclause 9.2) and to gain approval for them at WG 802.11, 802 EC, IEEE New Standards Committee (NesCom) and the IEEE Standards Board. The decision of whether to utilize the 802.11 WG or to establish a new WG or TAG to carry out work items recommended by a SG is made by the 802 EC with advice from the 802.11 WG. Formation A SG is formed when sufficient interest has been identified for a particular area of study within the scope of WG 802.11. The first step in the process is a call for interest. Any WG member or observer can make this at the WG 802.11 opening plenary. An 802.11 SG can then be initiated by 75% approval of the 802.11 WG and must be approved by the 802 EC. During this approval process the 802 EC decides whether a SG is within the scope of WG 802.11, should be moved to another WG or should be set up as an Executive Committee Study Group. Stephen McCann, Siemens Roke Manor

Continuation Study Group Operation September 2004 Continuation A SG exists for up to 6 months. If it has not completed its work within that time, a request must be made to the WG for an extension for up to additional 6 months. Any request for SG extension will be voted upon at the WG 802.11 closing plenary. Study Group Operation SG follow the operating procedures for TG specified above with the following exceptions detailed below: Study Group Meetings SG meetings held adjunct to 802.11 WG Plenary or Interim sessions count towards 802.11 WG voting rights Voting at Study Group Meetings Any person attending a SG meeting may participate in SG discussions, make motions and vote on all motions (including recommending approval of a PAR and five criteria). Attendance List Since SGs may have members who are not part of the parent WG, a separate attendance list must be maintained for the meetings of the SG and will be submitted as a document to the WG Vice-Chair. Stephen McCann, Siemens Roke Manor

September 2004 Meeting Etiquette "Individuals are to address the comments of others only, not the person" Stephen McCann, Siemens Roke Manor

Agenda Monday September 13 16:00 – 21:30 IEEE Policies and Procedures Overview of last meeting (incl. open issues review) Minutes and notes about August 11 audio conference (896) PAR (506r6) and 5 Criteria (507r1) overview Incoming liaisons Outgoing liaisons Liaisons to 3GPP/3GPP2 Technical Presentations I Stephen McCann, Siemens Roke Manor

Agenda Tuesday September 14 08:00 – 12:30 Technical Presentations II PAR (506r6) & 5 Criteria (507r1) completion Roadmap discussion for SG/TG (712r1) Introduction to Wednesday’s IETF review Stephen McCann, Siemens Roke Manor

Wednesday September 15 13:30 – 18:00 Agenda Wednesday September 15 13:30 – 18:00 IETF Draft Overview (1020) Draft document and motion Stephen McCann, Siemens Roke Manor

Objective of this session September 2004 Objective of this session Technical submissions to refine scope and way forward Complete PAR and 5 Criteria documents Produce roadmap for Study Group/Task Group Address open issues list Stephen McCann, Siemens Roke Manor

Air Interface Issues AR identifier MAC address anonymity Month 2002 doc.: IEEE 802.11-02/xxxr0 September 2004 Air Interface Issues AR identifier Supports layer 3 mobility. IP address change or not MAC address anonymity Protecting terminal identity Network Detection and Selection Beacon scalability What information can you transmit and how frequently. Higher data rates do not help! Stephen McCann, Siemens Roke Manor John Doe, His Company

Air Interface Issues II Month 2002 doc.: IEEE 802.11-02/xxxr0 September 2004 Air Interface Issues II Universal Access Method/11i co-existence User registration Channel management User clear down Graceful removal of user session Stephen McCann, Siemens Roke Manor John Doe, His Company

Network – Network Issues Month 2002 doc.: IEEE 802.11-02/xxxr0 September 2004 Network – Network Issues Policy enforcement Access control Simultaneous access External QoS mapping User access revocation Admission control Stephen McCann, Siemens Roke Manor John Doe, His Company

Month 2002 doc.: IEEE 802.11-02/xxxr0 September 2004 IETF Review Documents 1) “EAP Network Discovery and Selection Problem Description Document” http://www.ietf.org/internet-drafts/draft-ietf-eap-netsel-problem-00.txt  2) “Identity selection hints for Extensible Authentication Protocol (EAP) http://www.ietf.org/internet-drafts/draft-adrangi-eap-network-discovery-03.txt Stephen McCann, Siemens Roke Manor John Doe, His Company

Month 2002 doc.: IEEE 802.11-02/xxxr0 September 2004 Motion Move to accept the IEEE 802.11 WIEN SG PAR (506r8) and 5 Criteria (507r2) and to forward these documents to the IEEE 802.11 WG Result : 15-1-0 Approved Stephen McCann, Siemens Roke Manor John Doe, His Company